Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.

Slides:



Advertisements
Similar presentations
Frédérick BORDRY – LHCMAC 22- 6th December 2007 Review of the experience of LHC powering: short-circuit tests and sector 7-8 and start of powering sector.
Advertisements

1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Powering the main linac implications Daniel Siemaszko, Serge Pittet OUTLINE : Cost impact of power converters, power consumption and powering.
CRYOGENICS AND POWERING
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
LARP Collaboration April 26 th 2006 The Commissioning of the Technical Systems of LHC 1.The final validation that all the collider components/systems.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
Fk. Bordry AB/PO Academic Training - 27th March 2003 Technological Challenges for the LHC Power converters for the LHC Frédérick BORDRY AB-PO ? I(A) t.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
For more info:
HC Review F. Rodriguez-Mateos Powering tests The outcome of the work conducted within HCWG and many discussions among colleagues.
AT-MEL-MI Hardware Commissioning Review, , Suitbert Ramberger 1 The Normal Conducting Magnets and their Circuits Suitbert Ramberger, AT-MEL-MI.
Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Powering the damping rings wigglers Daniel Siemaszko, Serge Pittet OUTLINE : Powering superconductive magnets, Powering wigglers strategy, Existing.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
The prototype test String 2 May 13, 20082Roberto Saban – Academic Training Lecture 1 – Why LHC Hardware Commissioning?
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
HC Review Follow-up – June 22 nd – 23 rd 2006 What has been going on in the field: a status report F. Rodriguez-Mateos, TS-HDO on behalf of the HCC Team.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
TC CO July HCC report HCC report Summary of the tests of the LSS8L power converters in short-circuit F. Rodríguez-Mateos on behalf of R.Ballet-Thouble,
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
S A Griffiths CM42 June 2015 Electrical & Control.
HL-LHC IT STRING and Series test of SC link
Powering LHC magnets version 30/3/2007.
Minimum Hardware Commissioning – Disclaimer
The HL-LHC Circuits: Global View and Open Questions
LHC Hardware Commissionning
Experience: past events and accidents
Powering the LHC Magnets
MPE main activities planned for LS2
Re-commissioning campaign
Powering from short circuit tests up to nominal
Circuits description and requirements - Closed Session-
+ many slides from various colleagues (KH, Rudiger, Paul, …)
Brief report of the hardware commissioning activities
Commissioning of the LHC superconducting magnets systems: Why an LHC Hardware Commissioning? Specificity and complexity of this machine Roberto Saban.
Hardware Commissioning
Review of hardware commissioning
Presentation transcript:

Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter Energy Extraction

Power Converters and DC cablesSlide 2/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Introduction 1.Power converter reception tests and installation 2.DC cable reception tests and installation 3.Warm power tests without superconducting magnets 4.Cold power tests with superconducting magnets 5.Conclusion

Power Converters and DC cablesSlide 3/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 LHC Power Converters SR:Thyristor PCs for the warm magnets ARC: 60A corrector PCs UA:3.25kA and 2kA PCs 600A and 120A PCs MB PCs RR:2kA PCs 600A PCs 1700 converters with 98% underground 750*60A corrector converters (0.5kW) 740*120A&600A converters 220*2kA&3.25kA converters 8*13kA MB converters (2.6MW)

Power Converters and DC cablesSlide 4/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 LHC Power Converter DcctFGC Vref Magnet Power Part (Voltage Source) AC Mains Supply DC cables Power Interlock Controller Cooling System WorldFIP (Iref) DC cables Intk LHC Power Converters

Power Converters and DC cablesSlide 5/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Power converter tests before installation Power Part (Voltage source) FGC Dcct Individual Tests at CERN Surface Halls Individual Tests at manufacturer premises Power Part (Voltage source) FGC Dcct Power Part FGCDcct Converter Integration at CERN Surface Halls LHC Power Converter (Current source) : Performance validation Power converter reception tests

Power Converters and DC cablesSlide 6/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 PC installation Power converters installation the power converters are transported and installed in the tunnel without to be dismantled…

Power Converters and DC cablesSlide 7/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 PC installation … except the main dipole power converter 11 m 2.2 m Installation tests 40 t - By the specialists - In parallel with the short circuit tests Power converters installation

Power Converters and DC cablesSlide 8/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 DC cables Installation and tests Water cooled cable tests and installation The water cooled cables are not tested at CERN before their installation After their installation, the water cooled cables are only tested in pressure : 24 bars, 10 minutes in insulation : 3 kV DC with current leakage measurement

Power Converters and DC cablesSlide 9/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Powering circuit Energy Extraction Power Converter Magnet Intk syst Ctrl Room DC cables AC Main supply DC cable intk Cooling system Warm power tests (EDMS & ) Cold power tests (EDMS )

Power Converters and DC cablesSlide 10/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Warm power tests 8 hours heat run tests for superconducting circuits The objectives of this test are to valid AC connexion of the power converter Installation of power converter Cooling of the DC cables DC connexions between power converter, DC cables and discharge system The magnet is replaced by a short circuit piece Hardware commissioning procedure EDMS

Power Converters and DC cablesSlide 11/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Warm power tests 8 hours heat run tests for superconducting circuits Requests AC distribution UPS Water cooling system Ventilation system Short circuit pieces Energy extraction system for the 13kA and 600A with EE PIC for the 13kA

Power Converters and DC cablesSlide 12/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Warm power tests 8 hours heat run tests for warm magnets The objectives of this test are to valid AC connexion of the power converter Installation of power converter DC connexions between power converter, DC cables and magnet Set up of the current loop Power converter performance For transfer line power converters, the TI8 procedure is used

Power Converters and DC cablesSlide 13/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Warm power tests Requests AC network Interlock system Magnet 8 hours heat run tests for warm magnets

Power Converters and DC cablesSlide 14/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Warm power tests Interlock tests The objectives of this test are to valid Connexion between the interlock system and the power converter Comportment of the different system (power converter, interlock system and energy extraction system) Control Test The objectives of this test are to valid The WorldFIP (MUGEF for TL-PC) The Field Control Room softwares The Alarm system, Logging system and Post Mortem system

Power Converters and DC cablesSlide 15/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May hours heat run test for superconducting circuits The objectives of this tests are to valid Global water cooling system Global air conditioning system Global AC distribution Global control of power converters by the FCR Warm power tests

Power Converters and DC cablesSlide 16/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Warm power tests 10 weeks for a sector - 5 weeks for an UA - 3 weeks for a RR - 2 weeks for an arc Sector 78

Power Converters and DC cablesSlide 17/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Circuit type tests (60A, 120A, etc…) First Powering tests (at minimum stable current) Check the start of the power converter Set up of current loop and verify the stability Safety system Intermediate current Verify the current loop stability Safety system Nominal current Power converter performance in current source Cold power tests (EDMS )

Power Converters and DC cablesSlide 18/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Main dipole circuits Main issues with the RB circuits Starting of the power converter (> 20 s to go to the minimum current) Setting current loop (noise of the current measurement) Discharge system in the odd point Recuperation mode Safety system Power converter performance in current source Cold power tests

Power Converters and DC cablesSlide 19/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 MQM circuits Main issues with the MQM circuits Starting of the 2 power converters Setting current loop and verify the performance (resistive coupling) Safety system 6 kA Cold power tests

Power Converters and DC cablesSlide 20/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Inner Triplet main quadrupole circuits (EDMS ) RST - I ref1 I pc1 RST - I ref2 RST - I ref3 I pc3 I pc2 Decoupling system 4.7 kA±600 A 7 kA I pc1 I pc2 I pc3 V ref1 V ref2 V ref3 7 kA Cold power tests

Power Converters and DC cablesSlide 21/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Test strategy Test the 5 kA circuit alone (inner power converter) Test the 7 kA circuit alone (outer power converter) Test the 5 kA + 7 kA with decoupling loop Test the 5 kA + 7 kA kA with decoupling loop Set up of the current loops Inner Triplet main quadrupole circuits 4.7 kA±600 A 7 kA Cold power tests

Power Converters and DC cablesSlide 22/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Cold power tests Other sector: 7 days for the 3 main circuits 8 days for the IT circuits 4 days for the other circuits First sector: 14 days for the 3 main circuits 16 days for the IT circuits 8 days for the other circuits

Power Converters and DC cablesSlide 23/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Conclusions 1.The power converters are tested before their installation but theses tests are limited not real load not real environment not with the other systems (PIC and WorldFIP) 2.The DC cables are not tested before their installation not tests in power 3.The main circuits (RB and RQ) and Inner Triplet request a special attention