Economic Analysis Proposed Scope ERCOT RPG Meeting September 17, 2010.

Slides:



Advertisements
Similar presentations
Software Analysis Tools
Advertisements

1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
1 Overview of Allocating Revenue Requirements Based on Shares of Marginal Costs May, 2012.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Network Customer Meeting Access Metric Update November 16, 2006.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
1 ERCOT 2007 Strategic Financial Plan & Budget Proposal _____________________ Board of Directors November 14, 2006.
Cork June Dynamic modelling of transmission systems: costs of seasonal-zonal transmission loss factor charging and the impact of large-scale offshore.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
SEA - National plan Electricity Supply Arend Kolhoff Netherlands Commission for EIA Jordan - September 2003.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Generation Adequacy Task Force Update to WMS November 18, 2009.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Rocky Mountain States Sub-Regional Transmission Study December 9, 2003 Generation Additions Strawman.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Ancillary Services Redesign Update ERCOT TAC Meeting /25/2015.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
Long Term Study Transmission Results May 21 st, 2013.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
ERCOT – MISO DC Tie Study Comments
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program MIS Web Portal Business Requirements Review Current.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
1 ECONOMIC TRANSMISSION PLANNING Wholesale Market Subcommittee March 22, 2006 CMWG Proposal #1.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Pennsylvania Electric Supply GHG Forecast 1 Victoria Clark Stockholm Environment Institute - US Center 5/29/09.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
ERCOT 2011 Five-Year Transmission Plan Update
Warren Lasher Manager, Long-Term Planning and Policy
2021 Adequacy Assessment Status Report
Presentation transcript:

Economic Analysis Proposed Scope ERCOT RPG Meeting September 17, 2010

Economic Analysis Process Review Pattern’s proposed Economic Analysis Modeling Approach Description distributed to RPG on 8/30 21-day stakeholder comment period ends 9/20 Pattern reviews comments and provides responses back to RPG Pattern finalizes economic analysis scope definition with ERCOT assistance as needed Economic Study completion expected 6 to 8 weeks after finalization of study scope 1

Overview of Modeling Process Use UPLAN platform Full nodal SCUC SCED processes 8760-hour simulation for single study year, 2015 Base Case and two Change Cases Base Case = markets with expected development and average conditions Change Case = Base Case + Southern Cross Change Case A: ERCOT-expected 2015 wind build out assumptions (~10,500 MW of total ERCOT wind) Change Case B: ERCOT-assumed wind and 3000 MW additional wind development stimulated by the Southern Cross project Comparison of the Base Case with each Change Case will yield economic impacts 2

Input Assumptions Use ERCOT input assumptions (publicly available from ERCOT) where possible Use alternative sources when ERCOT assumptions are not made publicly available, such as: Information used by ERCOT but not released: ERCOT’s generator heat rate characteristics Fuel forecasts Certain ERCOT information where modifications will allow more direct comparison of of two markets, e.g.: ERCOT’s weather-normalized load will not be used for ERCOT given that similarly normalized load data is not available for SERC. Will instead use comparable load data from NERC and FERC filings 3

Input Assumptions – SERC detail SERC input assumptions from either: Publicly available sources Topology Load Generating units: location, capacity, type Operating reserve requirements and regions Emissions costs Wheeling rates LCG Proprietary Sources Fuel forecast Generator heat rates External regional supply Capacity additions (total capacity values provided in RPG document) 4

Detailed Modeling Assumptions: Provided in RPG Document 5

Metrics ERCOT metrics consistent with RPG charter and procedures Societal Benefits/Production cost impacts for ERCOT and by Load Zone Consumer Benefits/Energy cost savings LMP * consumption at each load node Producer Savings Over ERCOT and by Load Zone “Export Charges” that will reduce the transmission revenue requirement and other charges paid by loads Emissions Impacts Changes in CO 2, NO x, and SO x 6

Questions?

Contact Information Chris Shugart, Project Developer (713) David Parquet, Executive Sponsor (415) Matt Dallas, Media Relations (917)