DOE Rev of Run IIb Sep 24-26, 2002 1 Run IIb Silicon Mechanical Design  Run IIa and IIb geometries  Sensor dimensions, numbers, and drawings  Hybrids,

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
Vertex2002, Kailua-Kona, HI 11/07/02 B. Quinn1 Carbon Fiber Grounding Issues in the DØ Run IIb Silicon Detector Design Breese Quinn Marvin Johnson, Mike.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Vertex Detector Mechanics Bill Cooper Fermilab VXD.
1 Outer Tracker Mechanics, indico: May 2014, A.Onnela 21 May 2014 Thermally conductive carbon-fibre composite material for module and mechanics.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
PEEK Tube/Core Studies J. Fast, D. Olis, G. Lanfranco, H. Jostlein, B. Nitti, R. Duncan K. Schultz, T. Nebel, R. Davis.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
Mechanics: Status and Plans Bill Cooper (Fermilab) (Layer 1) VXD.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
WBS Stave Mechanics, Cooling and Support - LBNL ATLAS Upgrade R&D Meeting UC Santa Cruz May 3, 2007 E. Anderssen, M. Cepeda, S. Dardin, M. Gilchriese,
W.O. Miller i T i VG 1 Example Barrel Structures- Disk Primary FEA of Disk Frame Supports FEA of Disk Frame Supports –Structure 2m long with two end plates.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
CLIC Vertex Detector Mechanics Bill Cooper Fermilab (Layer 5) (Layer 1) VXD.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Director’s Review Dec 1999 Tracker Integration and Installation W. E. Cooper 6 December 1999.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
L0 and L1 Structure Deflections During Installation of Silicon Sensors C H Daly 8/24/2003.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
February, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
PMG Meeting February 2000 A Split Central Silicon Tracker W. E. Cooper on Behalf of the D0 Silicon Group 3 February 2000.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
W.O. Miller i T i VG 1 Two Pixel Configurations Under Study First: A Monolithic Integrated Structure First: A Monolithic Integrated Structure –Axial array.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
Pixel Upgrade Carbon Foam and Outer Stave Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, T. Johnson, J. Silber Lawrence Berkelely National.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
SiD Vertex Detector Mechanical R&D (May Apply to Other Concepts) Bill Cooper Fermilab.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
EC: 7 DISK concept Preliminary considerations
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
FCAL R&D towards a prototype of very compact calorimeter
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Local Supports for Inclined Layout: CERN Update
Micro Vertex Detector of PANDA Strip Detector
ob-fpc: Flexible printed circuits for the alice tracker
Vertex Detector Mechanical R&D Design Questions and Issues
WG4 – Progress report R. Santoro and A. Tauro.
SIT AND FTD DESIGN FOR ILD
Design and fabrication of Endcap prototype sensors (petalet)
SNS PPU Cryomodule Space Frame
Presentation transcript:

DOE Rev of Run IIb Sep 24-26, Run IIb Silicon Mechanical Design  Run IIa and IIb geometries  Sensor dimensions, numbers, and drawings  Hybrids, layouts, and drawings  Layer 2-5 staves and cooling  Layers 0 and 1: geometry, cooling, and materials  Summary W. E. Cooper, Fermilab

DOE Rev of Run IIb Sep 24-26, Silicon End View (Barrels)  Run IIa barrels:  1.3 m 2 silicon  4 layers  864 sensors  Double-sided except for layers 1 and 3 of the outermost barrels  Run IIb barrels:  8.6 m 2 silicon  6 layers  2304 single-sided sensors  Stereo and axial sensors in layers 2-5, axial only in layers 0-1

DOE Rev of Run IIb Sep 24-26, Plan View  Run IIb:  mm IR beam tube  12 sensors long (all layers)  L0 - L1: 8 cm sensors  L2 - L5: 10 cm sensors  1220 mm long barrel region  Support from “bulkheads” at z = 0 and z = ±610 mm  Run IIa:  mm IR beam tube  Six barrels, twelve F-disks, four H-disks  1070 mm long barrel plus F- disk region

DOE Rev of Run IIb Sep 24-26, Sensors and Sensor Drawings  The L1 sensor drawing was submitted to Hamamatsu (HPK) and revised to take into account HPK fabrication requirements. u The cut dimensions are mm wide x 79.4 mm long (384 readout traces, mm readout pitch, intermediate strips). u L1 has axial readout only. u For comparison, the 3-chip wide sensors of Run 2a have cut dimensions of 21.2 mm x 60 mm, mm readout pitch, and no intermediate strips.  The L2-L5 drawing has been submitted to HPK. u Cut dimensions are mm wide x 100 mm long (639 traces, mm readout pitch, intermediate strips). u The odd number of traces is needed to allow sensor-sensor bonds. u All L2-L5 sensors are identical. Stereo angles are obtained by rotating sensors. u For comparison, the 5-chip wide sensors of Run 2a have cut dimensions of 34 mm x 60 mm, mm readout pitch (axial surface), and no intermediate strip.

DOE Rev of Run IIb Sep 24-26, L1 Sensor Drawing

DOE Rev of Run IIb Sep 24-26, L2 – L5 Sensor Drawing

DOE Rev of Run IIb Sep 24-26, Sensors and Sensor Drawings  A L0 sensor drawing is in preparation following the format of the L1-L5 drawings. u The proposed cut dimensions are mm wide x 79.4 mm long (256 traces, mm readout pitch, intermediate strips). u We have verified that CDF L00 masks could be used instead of the L0 sensor layout developed for D0, if one trace of 256 were not read out. u L0 has axial readout only.

DOE Rev of Run IIb Sep 24-26, L2-L5 Stave End View  In this picture (L3 or L5), the axial sensors are on the top surface and the stereo, on the bottom.  In L2 and L4, the opposite stereo sense is obtained by rotating the staves 180 o about their longitudinal axis. L2 and L3 staves are identical as are those of L3 and L5.  Digital cables run along the stave outer surfaces from connectors on the hybrids to (and beyond) the z = 605 end of each stave. All cooling connections are at the z = 605 mm end.  Z = 0 pins are offset so that the pins of north silicon miss those of south silicon.

DOE Rev of Run IIb Sep 24-26, Hybrid – Sensor Layout 200 mm axial 200 mm 2.48 o stereo 400 mm axial 400 mm 1.24 o stereo

DOE Rev of Run IIb Sep 24-26, Hybrid Backside Printing  Aids in controlling hybrid flatness  Aids in preventing epoxy flow onto sensor guard ring during sensor – hybrid module assembly L1L2-L5 AxialL2-L5 Stereo

DOE Rev of Run IIb Sep 24-26, Plan View of Staves  Axial view at top  Stereo view at bottom

DOE Rev of Run IIb Sep 24-26, FEA for Staves Units in mm Restraints on 4 end node z = 0mm, free to slide longitudinally z = 600, clamped Giobatta Lanfranco SiDet Mechanical Engineering Group Fermilab

DOE Rev of Run IIb Sep 24-26, Mechanical Tests of Staves  FEA calculations of deflections under load have been verified by measurements  Natural resonant frequency calculated to be about 87 Hz  Stave structure is basically symmetric about neutral plane, which eliminates thermal bowing  Checks for thermal stability will be made by thermal cycling a small number of staves

DOE Rev of Run IIb Sep 24-26, Cooling Tubes  L2 – L5 Staves:  Stiff core based upon carbon fiber cooling tubes u Fixes relative transverse positions of the four axial and stereo hybrid - sensor modules of a stave u Fixes radial separation of axial and stereo silicon u Ties into C-channels which provide out-of-plane stiffness to stave u Integrates cooling tube with nozzles, C-channels, and stave locating features at ends

DOE Rev of Run IIb Sep 24-26, Cooling Tubes  Advantages of carbon fiber: u Allows leak checking to full vacuum both prior to and after silicon is mounted on the stave core s Leak checking does not pose a hazard to the stave s Leak checking can be performed at SiDet and later at DZero s Essential for a leak-free cooling system u Compatible with many adhesives u Secure and reliable connection between cooling tube and its nozzles u Sensor-hybrid module support within the stave is with a single low CTE material and is geometrically balanced against bowing u Relatively straight-forward fabrication of low-height cooling tubes needed with C-channel stave design u Stave deflection under gravity is low with C-channel design (50-60 µm)

DOE Rev of Run IIb Sep 24-26, Cooling Tubes  Other considerations: u Reasonable thermal conductivity in plane of fibers ( W/m*C) u Acceptable thermal conductivity normal to plane ( W/m*C) u Good radiation hardness ( Mrad with cyanate ester resin) u Low moisture absorption with cyanate ester resin (0.04%)  Disadvantages u Should be grounded at hybrids (Method has been developed) u Long-term testing needed to verify that leaks will not develop (Testing is underway) s Determination of time-scaling with temperature (ASTM) s Testing well beyond the operating temperature range

DOE Rev of Run IIb Sep 24-26, Cooling Tubes  L0 – L1 u Most of the same considerations apply, but s Matching CTE’s is a greater issue s Heat transfer is a greater issue s Carbon fiber cooling tubes are used structurally to support L0 hybrids

DOE Rev of Run IIb Sep 24-26, SiDet Cooling Tube Test  Sub-atmospheric operation with 41% ethylene glycol in water  13.7 psia supply pressure is set by elevation  3 psid across tubes corresponds to final operation  Flow rate is increased due to room temperature operation  Test system configured to accept both a heater and a chiller

DOE Rev of Run IIb Sep 24-26, L0 - L1 (University of Washington)  Sensors at twelve azimuthal positions and two radii for each layer  Support is via carbon fiber reinforce epoxy cylinders  The outer cylinder is castellated to provide the two radii  The inner cylinder is either round or hexagonal  Support for the cylinders is at z = 0 and z = 61 cm

DOE Rev of Run IIb Sep 24-26, L0 Geometry  Hybrids are located at the end of the sensor region and connected to the sensors via analogue cables  Independent cooling is provided for the sensors and the hybrids to simplify heat removal from the silicon. A maximum silicon temperature below –10 C is easily achieved.

DOE Rev of Run IIb Sep 24-26, L1 Thermal Studies (UW)  Cross section showing the various layers of materials in the model. Note the use of a layer of pyrolytic graphite sheet under the sensors. Hybrid chip Hybrid substrate Sensor chip Outer carbon fibre Inner carbon fibre Epoxy Hybrid chip Hybrid substrate Sensor chip Outer carbon fibre Epoxy Pyrolytic graphite Kapton /epoxy layers

DOE Rev of Run IIb Sep 24-26, L1 Silicon Temperatures (Colin Daly) Temperature map of L1 silicon sensors. The maximum temperature of L1a is –5.5 C; that of L1b is –3.5 C. An added heat load of 0.1 W/sensor would raise the maximum L1b temperature to –2.0 C.

DOE Rev of Run IIb Sep 24-26, L0 - L1 Carbon fiber  Extensive and detailed studies of carbon fiber structural and thermal behaviors have been made by Mark Tuttle of the University of Washington. Thermal strains used to infer a 1 for K13C/Epoxy. Slope implies a 1 = -3.7mm/m-C Modulus E x measured for a [0/20/-20] s K13C/epoxy laminate

DOE Rev of Run IIb Sep 24-26, Summary  The Run IIb geometry has been established. u North and South barrels, each with six layers u Independent, but mating, structures for L0-L1 and L2-L5. u 122 cm long silicon region u Support from fiber tracker barrel 1 via extension cylinders  L1 and L2-L5 sensor drawings have been prepared. Preparation of L0 sensor drawings is near completion.  Stave designs with integrated cooling and positioning features have been developed for L2 – L5.  Sensor – hybrid module designs have been developed which match the stave designs.  Designs of support structures for L0 and L1 have been developed, along with matching hybrid designs.  Finite element studies have been made of deflections and cooling for all layers.  Mechanical prototyping and testing have progressed well.