PhD Student, Federico Alessio Directeur de thèse, Renaud Le Gac Superviseur de thèse, Richard Jacobsson, CERN Beam and Background Monitoring and the Upgrade.

Slides:



Advertisements
Similar presentations
CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
Advertisements

LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
A Gigabit Ethernet Link Source Card Robert E. Blair, John W. Dawson, Gary Drake, David J. Francis*, William N. Haberichter, James L. Schlereth Argonne.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
An LHCb general-purpose acquisition board for beam and background monitoring at the LHC F. Alessio, R. Jacobsson, CERN, Switzerland Z. Guzik, IPJ Swierk,
The LHCb Online System Design, Implementation, Performance, Plans Presentation at the 2 nd TIPP Conference Chicago, 9 June 2011 Beat Jost Cern.
Study on buffer usage and data packing at the FE Federico Alessio, with inputs from Richard, Ken, Guillaume LHCb Electronics Upgrade Meeting 11 April 2013.
LHCb DAQ Review, September LHCb Timing and Fast Control System TFC Team: Arek Chlopik, Warsaw Zbigniew Guzik, Warsaw Richard Jacobsson, CERN Beat.
DDL hardware, DATE training1 Detector Data Link (DDL) DDL hardware Csaba SOOS.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
Start-up & synchronization sequence for Front-End LHCb Electronics Upgrade Meeting 13 February 2014 F. Alessio, CERN.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
Status of Readout Board Firmware Guillaume Vouters On behalf of the MiniDAQ developers 11 December 2014 LHCb Upgrade Electronics.
CERN R. Jacobsson CERN 16 th IEEE NPSS Real Time Conference, Beijing, China, May 10–15, LHCb Readout System and Real-Time Event Management - Emphasis.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
CERN Real Time conference, Montreal May 18 – 23, 2003 Richard Jacobsson 1 Driving the LHCb Front-End Readout TFC Team: Arek Chlopik, IPJ, Poland Zbigniew.
TELL1 The DAQ interface board for LHCb experiment Gong guanghua, Gong hui, Hou lei DEP, Tsinghua Univ. Guido Haefeli EPFL, Lausanne Real Time ,
Readout Control specifications for FE and BE in the upgraded LHCb readout system Federico Alessio Richard Jacobsson LHCb Electronics Upgrade Meeting 26.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
The L0 Calorimeter Trigger U. Marconi On behalf of the Bologna Group CSN1, Catania 16/9/02.
Federico Alessio Zbigniew Guzik Richard Jacobsson TFC Team: A Super-TFC for a Super-LHCb - Top-down approach -
Federico Alessio, CERN Richard Jacobsson, CERN A new Readout Control System for the LHCb Upgrade at CERN 18th IEEE-NPSS Real Time Conference, June.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
Federico Alessio, CERN Zbigniew Guzik, IPJ, Swierk, Poland Richard Jacobsson, CERN A 40 MHz Trigger-free Readout Architecture for the LHCb experiment 16th.
LHCb front-end electronics and its interface to the DAQ.
LHCb DAQ system LHCb SFC review Nov. 26 th 2004 Niko Neufeld, CERN.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
Kraków4FutureDaQ Institute of Physics & Nowoczesna Elektronika P.Salabura,A.Misiak,S.Kistryn,R.Tębacz,K.Korcyl & M.Kajetanowicz Discrete event simulations.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
Data Acquisition, Trigger and Control
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
Timing and Readout Control of the Upgraded LHCb Readout System Updated system-level specifications Federico Alessio Richard Jacobsson LHCb Electronics.
TFC update and TFC simulation testbench Federico Alessio Richard Jacobsson LHCb Electronics Upgrade Meeting 14 February 2012.
CERN LECC 2006, September, Valencia, Spain Acknowledgements: Eva Calvo Giraldo, AB/BI Rhodri Jones, AB/BI Greg Kasprowicz, AB/BI Thilo Pauly, ATLAS.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
DAQ interface + implications for the electronics Niko Neufeld LHCb Electronics Upgrade June 10 th, 2010.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
CERN Richard Jacobsson, CERN LEADE meeting, March 29, Physics trigger RS TFC SwitchThrottle OR/Switch VELO FEST FEOT FE Clock Orbit Clock Orbit.
Readout Control specifications for FE and BE in the upgraded LHCb readout system Federico Alessio Richard Jacobsson LHCb FE specificiations Upgrade Meeting.
CERN F. Alessio & R. Jacobsson CERN LHCb Electronics Upgrade Meeting, April 15, LHCb Upgrade Front End  Back End Readout Architecture Proposal.
18/05/2000Richard Jacobsson1 - Readout Supervisor - Outline Readout Supervisor role and design philosophy Trigger distribution Throttling and buffer control.
Ken Wyllie, CERN Tracker ASIC, 5th July Overview of LHCb Upgrade Electronics Thanks for the invitation to Krakow!
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
CERN R. Jacobsson Between LHC and the Grid - Aspects of Operating the LHC Experiments – T. Camporesi, C.Clement, C. Garabatos Cuadrado, L. Malgeri, T.
R.Divià, CERN/ALICE 1 ALICE off-line week, CERN, 9 September 2002 DAQ-HLT software interface.
Introduction to DAQ Architecture Niko Neufeld CERN / IPHE Lausanne.
ROM. ROM functionalities. ROM boards has to provide data format conversion. – Event fragments, from the FE electronics, enter the ROM as serial data stream;
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
Grzegorz Kasprowicz1 Level 1 trigger sorter implemented in hardware.
Timing and Fast Control of the Upgraded LHCb Readout System Federico Alessio Richard Jacobsson LHCb Upgrade Electronics Review 5 December 2012.
Giovanna Lehmann Miotto CERN EP/DT-DI On behalf of the DAQ team
of the Upgraded LHCb Readout System
Electronics Trigger and DAQ CERN meeting summary.
TELL1 A common data acquisition board for LHCb
Electronics, Trigger and DAQ for SuperB
Controlling a large CPU farm using industrial tools
Status of the Beam Phase and Intensity Monitor for LHCb
The LHCb Run Control System
LHCb Electronics Brainstorm
LHCb Trigger, Online and related Electronics
The LHCb Front-end Electronics System Status and Future Development
TELL1 A common data acquisition board for LHCb
Beam Phase and Intensity Monitor for LHCb
Presentation transcript:

PhD Student, Federico Alessio Directeur de thèse, Renaud Le Gac Superviseur de thèse, Richard Jacobsson, CERN Beam and Background Monitoring and the Upgrade of the Timing and Fast Control System for the LHCb experiment CPPM, Marseille 2nd June 2009

CPPM, 1 year seminar, 2° June TeV Large Hadron CERN

CPPM, 1 year seminar, 2° June 2009 CMS ALICE LHCb First Beam 2008 ATLAS

CPPM, 1 year seminar, 2° June 2009 The challenge of a LHC experiment (online point of view) Federico Alessio4  record as much data as possible with the highest precision ever Physics Event Readout:  read out data from detector and trasfer to PC farm for offline analysis  distinguish interesting events from non-interesting events (trigger)  keep synchronicity of entire readout electronics and trasmit commands  mainly based on electronics boards, processors, computers, disks Beam & Background:  distinguish between real physics events and background due to physics events  monitor the beam in the experiment location  explain and predict possible bad behaviour of the beam (whenever possible protect the detector itself)  use of dedicated smaller detectors to define figure of merits

CPPM, 1 year seminar, 2° June 2009 Beam and Background LHCb Federico Alessio5 Complete study framework which involves:  Background monitoring Beam Condition Monitor Metal-foil based Radiation Monitoring System Active Radiation Monitors Beam Loss Scintillator VELO/PUS SPD  Beam monitoring VELO/PUS (and indirectly also the others above) Beam Phase and Intensity Monitor

CPPM, 1 year seminar, 2° June 2009 Beam Phase and Intensity Monitor Federico Alessio6 Commonly known as BPIM, it is used to measure bunch-by-bunch the phase and the intensity of the proton beam with respect to the global clock  gives a clear structure of the beam and the position of the orbit locally A full batch of 8 custom-made boards has been designed, produced, fully tested and FPGA processing written  used with first beam in September 2008 The same board is used in ALICE for their trigger chain

CPPM, 1 year seminar, 2° June 2009 Beam Loss Scintillator Federico Alessio7 2 scintillators + PMTs have been installed and tested with cosmics by Rustem Dzhelyadin  Monitor the injection phase: splashes from improper transfer from injection line to the LHC accelerator or beam instabilities at injection  Monitor continuous runs: real-time readout allows monitoring the status of the beam and possibly predict bad configuration of the LHC machine  Not meant to protect the LHCb experiment from beam accidents Proposal to use the Beam Phase and Intensity Monitor for the readout  only background monitor in LHCb which can detect fast losses  written processing in FPGA: running sums, histogramming, averages, alarm threshold  calibrated the full system corresponding to background levels of interests  developed control system common to BPIM and TFC system, possibility to archive data for offline analysis  full system will be validated during injection test 6-7 June and first (second) LHC beam

CPPM, 1 year seminar, 2° June 2009 SWITCH HLT farm Detector Timing & Fast Control System SWITCH READOUT NETWORK LHC clock MEP Request Event building Front-End CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU CPUCPU Readout Board VELO STOT RICH ECalHCalMuon SWITCH MON farm CPUCPU CPUCPU CPUCPU CPUCPU Readout Board L0 trigger L0 Trigger LHCb Readout SystemUpgraded Rethink/ Redraw/ Adapt/ Upgrade/ Replace Federico Alessio8 FE Electronics

CPPM, 1 year seminar, 2° June 2009  Need to define protocols.  Very likely the readout link FE-ROB and the protocol will be based on CERN-GigaBitTransceiver (GBT)  Need to define buffer sizes and truncation scheme to be compliant with the worst scenario possible (big consecutive events which could overflow memories).  Need to fully control the phase of the recovered clock at the FE.  Necessary reproducibility of the clock phase each time the system is switched off/on  The jitter of the reconstructed clock must be very small (< 10ps RMS).  Need to control the rate in order to allow a “staged” installation  Partitioning as a crucial aspect for parallel stand-alone tests and sub-detectors development (test-bench support) Work to do (in order to satify requirements) Federico Alessio9

CPPM, 1 year seminar, 2° June 2009 S-TFC Architecture (i.e. the new s-heartbeat of the LHCb experiment) Federico Alessio10

CPPM, 1 year seminar, 2° June 2009 Federico Alessio11 Simulation  Full simulation framework to study buffer occupancies, memories sizes, latency, configuration and logical blocks

CPPM, 1 year seminar, 2° June 2009 Federico Alessio12 Achievements and plans Two main topics: 1.BPIM and BLS inserted in the framework of a larger background study in LHCb and LHC and framework monitoring of the beam behavior during shifts and continuous run  Boards developed, tested and installed  Ready to be used during LHC runs  Publications in preparation with LHC real-time results 2.the Upgrade of the Timing and Fast Control system in the framework of the LHCb Upgrade  LHCb Upgrade plans are well ahead  TFC system to be ready well before any other to allow development and R&D  First prototype will be developed with help of CPPM for validation of protocols, link transmission and FPGA processing  LHCb public note: F. Alessio, R. Jacobsson, Z. Guzik: “Timing and Fast Control and Readout Electronics Aspects of the LHCb Upgrade”, LHCb  Presented at 16 th IEEE-TNS Real Time Conference in Beijing, China: F. Alessio, R. Jacobsson, Z.Guzik: “A 40 MHz Trigger-free Readout Architecture for the LHCb experiment”, submitted to TNS Merci!

CPPM, 1 year seminar, 2° June 2009 Federico Alessio13 Backup Merci!

CPPM, 1 year seminar, 2° June 2009  No L0-trigger  Point-to-point bidirectional high-speed optical links  Same technology and protocol type for readout, TFC and throttle  Reducing number of links to FE by relaying ECS and TFC information via ROB THROTTLE TFC DATA BANK EVENT REQUESTS FEFARM TFC ROB L0 TRIGGER TFC DATA TFC DATA LHC CLOCK ECS THROTTLE TFC DATA BANK EVENT REQUESTS FEFARM TFC ROB L0 TRIGGER TFC DATA TFC DATA LHC CLOCK ECS Architectures, Old vs New Federico Alessio14 S-FES-FARM S-TFC DATA TFC DATA BANK EVENT REQUESTS S-ROB S-ECS TFC, DATA, ECS TFC, THROTTLE S-LHC CLOCK

CPPM, 1 year seminar, 2° June 2009 The S-FE records and transmits 40 MHz, via optical 4.8 Gb/s (3.2 Gb/s data) Implications for Front-End It is necessary that Zero Suppression is performed in rad-hard FE  Asynchronous data transfer  Data has to be tagged with identifiers in header  Realigned in Readout Boards Federico Alessio15 Courtesy Ken Wyllie, LHCb NZS data, event size is = ~16TB/s!! S-FE logical scheme

CPPM, 1 year seminar, 2° June 2009 Timing and Fast Control (1) Federico Alessio16  Readout system requires timing, synchronization and various synchronous and asynchronous commands  Receive, distribute and align LHC clock and revolution frequency to readout electronics  Transmit synchronous reset commands, calibration sequences and control the latency of commands  Back-pressure mechanism from S-ROB to handle network congestion 1. Effectively, throttle the readout rate 2. Possibly implementing an “intelligent” throttle mechanism, capable of distinguish interesting physics events locally in each S-ROB

CPPM, 1 year seminar, 2° June 2009  Farm has to grow in size, speed and bandwidth  Destination Control for the event packets in order to let the S-ROBs know where to send the event (to which IP address)  Request Mechanism (EVENT REQUESTS) to let the destination controller in the TFC system know if a node is available or not. The definition of such a readout scheme is a “push protocol with a passive pull”  A data bank has to contain info about the identity of an event and trigger source information. This info is added to each event (TFC DATA BANK)  New TFC system (prototype of S-TFC) has to be ready well before the rest of the electronics in order to allow development and testing, and validate conformity with the overall specs Timing and Fast Control (2) Federico Alessio17

CPPM, 1 year seminar, 2° June 2009 S-TFC Master  S-TFC Interface link  TFC control fully synchronous  2.4 Gb/s (max MHz  3.0 Gb/s) 1.Reed Solomon-encoding used on TFC links for maximum reliability (header ~16 bits) (ref. CERN-GBT) 2.Asynchronous data  TFC info must carry Event ID  Throttle(“trigger”) protocol 1. Must be synchronous (currently asynchronous)  Protocol will require alignment  TFC control protocol incorporated on link between S-FE and S-ROB (i.e. CERN GBT) Federico Alessio18 S-TFC Protocols S-TFC Interface  S-ROB  Copper or backplane technology (In practice 20 HI-CAT bidirectional links)  TFC synchronous control protocol same as S-TFC Master  S-TFC Interface  One GX transmitter with external transmitter 20x-fan-out (PHYs - electrical)  Throttle(“trigger”) protocol using 20x SERDES interfaces <1.6 Gb/s

CPPM, 1 year seminar, 2° June 2009 Federico Alessio19 Reaching the requirements: phase control Use of commercial electronics:  Clock fully recovered from data transmission (lock-to-data mode)  Phase adjusted via register on PLL  Jitter mostly due to transmission over fibres, could be minimized at sending side 1. Use commercial or custom-made Word-Aligner output2. Scan the phase of clock within “eye diagram” Still investigating feasibility and fine precision