CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.

Slides:



Advertisements
Similar presentations
Roles & Responsibilities in Construction Management
Advertisements

Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Michipicoten Settlement Trust Trustee Investing September 21, 2012 Heather Richardson, Executive Trust Officer.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
Disposing of a Property Asset Russell Martoo Managing Director RCP Project Management – Development Management – Project Programming – Delay Claim Advisory.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Angra dos Reis — Brazil. Reactor Specs Single Primary Reactor –4.5 GW peak power (4.1 average) –Allows measurement of backgrounds Approval from the reactor.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
John Osborne GS/SE March 2013
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
Tim Watson ST-CE CE Experience with External Consultants for the LHC Project.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Compensation events and claims Presented by Prof. Khem Dallakoti.
CENF target facility civil engineering specifications – summary M. Calviani (EN/STI) for the CENF-SBWG team Neutrino Platform Meeting 30 th October 2014.
VALUE FOR MONEY 1 OGC buying.solutions Procurement of Projects Presented by Andy Hamer Pre Accession Advisor, Finance Ministry.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
1 Thomas HottTechnical Reviews Contents, 2 nd CDE-WS, 12 th & 13 th May 09 XFEL Technical Coordinator Technical Reviews – Contents – 1.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
TOF Preliminary Design and Safety Review Project Management Controls R. L. Brown.
Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000.
15 January Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
HNSciCloud Pre-Commercial Procurement Project Procurement Framework and Schedule Dante Gregorio CERN 26 January
CLOSE PROJECT OR PHASE CLOSING PROCESS GROUP PROJECT INTEGRATION MANAGEMENT.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Survey Meeting John Osborne, CERN 8 February 2016
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES John Osborne GS/SE 16 May 2013.
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
Business Case Step 7: Site Search – Leased Space 1 Sub-StepsLead Org Activity (LO) Endorsing Org (EO) Activity Ministry Activity 1. Continue to BC_7_Site.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
The Challenge of Deciding What Procurement Method to Use
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
City of Ottawa, NCHCA & CEO 2017 Education Series
Sanitary Sewer Lift Station Rehabilitation Design Services Pre-Submittal Meeting September 20, 2016.
20 Principles for Managing Behavioural Safety & Process Safety
Next Step & Time plan Marcello Losasso, CERN
Procurement Management
Project Management W. J. Foyt
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
FCC Civil Engineering John Osborne & Jo Stanyard (SMB - Site Engineering - FAS Section) FCC week outline 10th May 2017.
Administration of a FIDIC Contract - Pre-Contract Phase -
Administration of a FIDIC Contract - Award to Commencement -
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
EP Experiments safety validation process Safety Permits
CHAPTER 3 Developing the Event Site
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
GPP Training Toolkit An Introduction European Commission
CONVENTIONAL FACILITIES LCLS Office Space Procurement
12 Safe Maintenance Rules
Second Avenue Subway Project Execution Strategy
eSPS 2nd CDR meeting – 17th June 2019
Presentation transcript:

CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013

Tender documents include : Updated list of firms from MS Instruction to Bidders Technical Spec including : Descriptive Deliverables for the phases Safety Rules Drawings Geology Risk Matrix Conditions of Contract Tender Form “Best Value for Money” Questions & Criteria Etc Specification Meetings held and documents updated Call for tender for CE Design and Contract Administration documents virtually ready for issue

Tender does not include Primary Beam Extraction Tender is for CE design for Near, Far & Target Areas

Phases of Services Clause added to Tender Form to allow Contract termination after any Phase : CERN reserves the right to order all or part of the Services. In particular, CERN reserves the right to terminate the Consultancy Contract at the end of any phase subject to a one-month notice. Equally, the Consultant shall only proceed with a subsequent phase upon written confirmation from CERN within a minimum one-month notice.

The following is required prior to Phase One : A fully integrated design developed inside CERN with all services incorporated (HVAC, EL etc). Site Investigation for all areas. Only Target Area and Near Detector are complete at the moment. Far Detector requires permission from Authorities. Environmental Impact Assessment Approved to allow submission of building permits.