August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.

Slides:



Advertisements
Similar presentations
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Environmental Impact Statement Process Development Services Department Carol Helland, Land Use Director/SEPA Official (DSD) David Pyle, Senior Land Use.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
Environmental Assessment Public Meeting
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Spectra Energy Partners Texas Eastern Transmission, LP Ohio Pipeline Energy Network Project (OPEN) Clean Water Act Section 401 Water Quality Certification.
Detroit Intermodal Freight Terminal Michigan Department of Transportation Gloria J. Jeff, Director Michigan Department of Transportation.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Longmeadow Parkway Fox River Bridge Corridor
Federal Transit Administration New Starts Project Development Process
MTF Rail Development Forum
Virginia Department of Rail and Public Transportation Southeast High Speed Rail Richmond Area to Potomac Segment (RAPS) Tier II EIS Presentation to the.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Freight Rail Day 2011 “Freight Rail: Working for Wisconsin” A CASE STUDY Ken Lucht Wisconsin & Southern Railroad Co.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Presented by: The Ohio Department of Transportation 1 Land Use Managing the Environmental & Project Development Process.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
The CSX Railroad Relocation and East- West Transportation Corridor Study US DOT RITA Briefing Presentation Mississippi State University Chuck O’Hara January.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Cape Fear Skyway STIP Project No. U-4738 Federal Aid Project No. STP-0017(53) WBS No New Hanover and Brunswick Counties, North Carolina October.
All within 5 square miles and at the doorstep of ARTIC Study Area Approximately 73,000 employees Home for 25,000 residents Approximately 20 million visitors.
Integrated Regional Water Management MAY 22, 2015 TRACIE BILLINGTON DEPARTMENT OF WATER RESOURCES 1.
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
Metro South Planning MetroLink in South St. Louis County Metro South MetroLink Extension Alternatives Analysis and Draft Environmental.
Public Scoping Meeting National Environmental Policy Act Portageville Bridge Project Tuesday, November 19, PM – 7 PM Genesee River Restaurant,
Office of National Transportation Update Presented to: Spent Fuel Project Office Presented by: Gary Lanthrum, Director Office of National Transportation.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Framework for Rail Planning and Project Development.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Alternative Alignments Public Meeting
Municipal Class Environmental Assessment
The Central Avenue Connector Trail
Scoping Meeting April 20th 6:00 pm
Willow Meadows Civic Club Meeting September 13, 2011
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Ohio Rail Development Commission November 15, 2017 Meeting
Dialogues from the Odessa Ground Water Replacement Program
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
I-85 Corridor Light Rail Transit Feasibility Study
Chicago to Council Bluffs-Omaha
White Flint North Entrance Feasibility Study
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire

Agenda Project History Funding Process Future Steps

Project History HCPHC secured USDOT Grant for Port Bienville Rail Study in 2007 FRA is led Federal Agency overseeing the EIS Mississippi Department of Transportation is Contracting Agency and manages the Study Consultant team is led by CDM Smith $2,699,700 Grant Funding Studies Scope of work for the Studies: – Feasibility Study (completed) – Environmental Impact Statement and Preliminary Design (starting)

Study Area Hancock & Pearl River Counties 231 Square Mile Study Area Stennis Space Center Fee Area Buffer Zone

Funding Current Grant supports study efforts only A number of funding opportunities have been identified for future phases of work but none have been secured at this time. Phase 1 Feasibility Study $735,000 Phase 2 Environmental Impact Statement $1,964,700

Phase 1 Feasibility Prelim Eng Initial Cost Estimates 5 Economic Impact Study 6 Reported findings and new rail line feasibility 7 Recommended Proceeding to Phase 2 8 Data Gathering 1 Stakeholder/ Public Engagement 2 Identify potential rail alignment 3 GIS-Based Environmental Overview 4

Exhaustive efforts to Minimize Impacts to the Natural & Human Environment 16 Potential Rail Line Alternatives Segments Identified for Further Study 40 possible alignment combinations All alignment combinations skirt around the Stennis Fee Area Use a portion of the existing rail bed Map of Potential Alternative Segments

Constraints Identification Summary

Proposed Project or Proposed Action 24 miles in length Cross I-10 and I-59 Avoids Devils Swamp and other wetland mitigation banks Texas Flat Mitigation Bank Potential for <50 acres of wetland impacts Potential for 1 mile of wetland bridging Approximately $100 M implementation cost

Completion of Three Studies

Feasibility Study Findings A new rail connection to Norfolk Southern would provide existing business: – Access to dual Class 1 rail service – Improved transit times and reliability of deliveries “Dual Class 1 rail access would enable Hancock & Pearl River Counties to attract new industries that require this level of rail service”

Phase 2 – Environmental Impact Statement (EIS) Public and Agency Scoping Refinement of the potential alignment segments Detailed field work on alignment alternatives Stakeholders, agency and public involvement Identify preferred alignment Preliminary design and cost estimates Schedule for Completion of the EIS - approximately 3 years Document EIS process and Public Review of the DEIS (draft & final EIS, Record of Decision)

Future Steps Identify funding source(s) for right-of-way and construction Final design Permitting Right-of-way acquisition Construction

THANK YOU! QUESTIONS?