Review of Sector 45 - 28th of February 20081 Electrical Safety for the interventions during Hardware Commissioning of LHC Anne Funken, TS-ICC.

Slides:



Advertisements
Similar presentations
1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
Advertisements

LHC HARDWARE COMMISSIONING REVIEW May 2005 CRYOGENIC VACUUM SYSTEM Paul Cruikshank for AT/VAC.
IMPACT Safety sub-working Group 1 Fernando B. S. Pedrosa IMWG – 07/Oct/2014 EDMS id:
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Software Project Management
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
1 1. Some recent views ( ) 2 Linac tunnel
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
V.Montabonnet - Safety during Hardware Commissioning 18 October Contents  Electrical circuits in the LHC context  Electrical Hazards  Preventions.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
For more info:
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Nuria Catalan Lasheras, TE/MPE-EI REVIEW OF ELECTRICAL DRAWINGS FOR THE LHC SUPERCONDUCTING CIRCUITS.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Roberto Saban TS HC Review bis Outline  Interviews of all the Group Leaders loosely or tightly concerned by hardware commissioning proposing them.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
Closing session Issues and questions from the audience and some from me Rüdiger Schmidt.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Electrial Safety LS2 days November 2016 AP
Survey on “Chargés de Consignation” Status Update
Considerations from machine protection and the ELQA teams
ELQA Electrical Quality Assurance
Giorgio on behalf of ELQA team
Giorgio on behalf of ELQA team
East Area Renovation Project team #6 Launch safety agreement
Quality Assurance applied to Accelerator Safety
Hollow e- lens, Cryogenic aspects
MPE main activities planned for LS2
Survey on “Chargés de Consignation” Follow-up
Powering from short circuit tests up to nominal
Circuits description and requirements - Closed Session-
EP Experiments safety validation process Safety Permits
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Agenda Contents Different types of documents
Brief report of the hardware commissioning activities
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
Hardware Commissioning
Circuit Disconnector Boxes Implementation of our safety first policy
Powering and Safety day Underground access during powering tests
Presentation transcript:

Review of Sector th of February Electrical Safety for the interventions during Hardware Commissioning of LHC Anne Funken, TS-ICC

Review of Sector th of February Contents  The procedures in matter of electrical safety  The Electrical Safety Subsectors  How is electrical safety managed ?  How do we proceed to authorise an intervention ?  What could be improved for the next sectors ?

Review of Sector th of February The procedures in matter of electrical safety  General procedure, EDMS : Identification of the voltage sources and the electrical risks generated Status of the voltage sources during the different phases of HC The UTE C applied to HC : consignation in two steps, who does what ? The documents required (Yellow papers) The CERN safety regulation shall be strictly followed, more particularly the Electrical Safety Code C1 which stipulates to follow the instructions of the UTE C  Specific procedures per type of intervention : Présentation des câbles DC sur les amenées de courant, EDMS Première connexion des câbles DC sur les amenées de courant des DFBs après la qualification des circuits à froid, EDMS Identification of the person assuming each role : who is whom ? The different steps and documents issued  Procedure for the disconnection of the warm parts of SC circuits, EDMS : Extension of the UTE required for the superconducting circuits Zero current measurement to be done in the 2 nd step of consignation

Review of Sector th of February Electrical Safety Subsectors  Definition : An Electrical Safety Subsector is a cryogenic section electrically isolated from the rest of the machine. In some cases, two to three Electrical Safety Subsectors belong to the same Powering Subsector. (Source : Matteo Solfaroli)

Review of Sector th of February Electrical Safety Subsectors  List of the 43 Electrical Safety Subsectors, per sector : IT Q4D2 or D3 Q5*Q6 Q7-Q11 Arc Q6Q5* Q4D2 or D3 IT Sector 1-2 XR1LR1A12ML2.Q5ML2.Q4XL2 Sector 2-3 XR2MR2.Q4MR2.Q5A23A23.Q6--- Sector A34.Q6A34ML4.Q6ML4.Q5ML4.D3- Sector 4-5 -MR4.D3MR4.Q5MR4.Q6A45LL5XL5 Sector 5-6 XR5LR5A56-ML6.Q5ML6.Q4- Sector 6-7 -MR6.Q4MR6.Q5-A67A67.Q6--- Sector A78.Q6A78ML8.Q5ML8.Q4XL8 Sector 8-1 XR8MR8.Q4MR8.Q5A81.Q6A81LL1XL1 * Q5D4 for the electrical safety subsectors ML4.Q5 and MR4.Q5

Review of Sector th of February Electrical Safety Subsectors  List of circuits and power converters per Electrical Safety Subsector : EDMS Power Converter Name Circuit Name P. C. Location Circuit TypeDFB Name RPHFD.UA47.RD4.R4RD4.R4UA47IPDDFBML.5R4 RPHH.UA47.RQ5.R4B1RQ5.R4UA47IPQDFBML.5R4 RPHH.UA47.RQ5.R4B2RQ5.R4UA47IPQDFBML.5R4 RPLB.UA47.RCBYH5.R4B2RCBYH5.R4B2UA A_ RPLB.UA47.RCBYV5.R4B1RCBYV5.R4B1UA A_ e.g. MR4.Q5  Purpose : First introduced for the ElQA tests (near miss on the 5 th of July 2007) The concept is extended to authorise other types of interventions e.g. interventions on or close to a DFB.

Review of Sector th of February Electrical Safety : how is it managed ?  For each intervention taking place in an environment where an electrical risk is present, a Chargé de Travaux (CT, habilitation B2) shall be appointed : For electrical interventions, the CT belongs to the intervention team For non electrical interventions, the CT belongs to HCC  Since Nov 07, the Chargé de Travaux HCC is Thierry Octave (Norisko)  Management of the 1 st steps of consignation requested by HCC and the autorisations de travail given by HCC done via : Paper folders for the yellow papers Status files for the follow up, accessible at

Review of Sector th of February Electrical Safety : how is it managed ? Done by Thierry Octave Summary Detail per sector

Review of Sector th of February Electrical Safety : how is it done ?  Before the powering tests : All the PC, QHPS and EE systems are consignés in 1 st step (requested by HCC). The requests are done by Electrical Safety Subsectors. The Chargé de Travaux HCC executes the 2 nd step of the consignation The DC cables being not electrically connected to the CL : - The DC cables are short-circuited and grounded (done by HCC) - The CL of the DFBs are short-circuited and grounded (done by ElQA Team)  After the powering tests : All the PC, QHPS and EE systems remain déconsignés If an intervention is required on an Electrical Safety Subsector, this subsector shall be consigné  During the powering tests : The PC, QHPS and EE are déconsignés according to the test program Once one circuit of an Electrical Safety Subsector is déconsigné, no intervention is allowed on the same Electrical Safety Subsector

Review of Sector th of February Electrical Safety : how is it done ?  When ElQA activities take place on an Electrical Safety Subsector, other interventions are NOT allowed on the same Electrical Safety Subsector.  For non electrical interventions, an autorisation de travail is given by the Chargé de Travaux HCC to the Chef de Chantier of the intervention team. To intervene on a DFB, all the circuits of the corresponding Electrical Safety Subsector are consignés (PC, QHPS, EE).  For electrical interventions, the Chargé de Travaux from the intervention team requests the 1st steps of the consignation he/she deems necessary and executes the 2nd step of the consignation according to the procedures established.

Review of Sector th of February Electrical Safety : improvements  All requests for intervention shall be addressed to the HCC Quadrant Owner, the autorisation de travail UTE C for non electrical intervention is only a consequence : Autorisation de travail UTE HCC Quadrant Owner Intervention Team Leader Request for an intervention Authorizes CT HCC Request to issue the Autorisation de travail UTE on EDH

Review of Sector th of February Avis d’Intervention on EDH

Review of Sector th of February Avis d’Intervention on EDH What ? Who ? Where ? When ? Consignation ? VIC ? Approved by: - HCC Quadrant Owner - Safety Coordinator - Chargé de Travaux

Review of Sector th of February Electrical Safety : improvements  All requests for intervention shall be addressed to the HCC Quadrant Owner, the autorisation de travail UTE C for non electrical intervention is only a consequence : CT HCC HCC Quadrant Owner Intervention Team Leader Request for an intervention Autorisation de travail UTE Authorizes Request to issue the Autorisation de travail UTE  The autorisation de travail UTE C shall be returned to the Chargé de Travaux HCC once the intervention is completed. (1) End (2)

Review of Sector th of February Electrical Safety : improvements  Further analysis of the electrical risk generated by : The 60A circuits and locally powered A circuits of an Electrical Safety Subsector during an intervention on or close to a DFB of the same Electrical Safety Subsector. The circuits of a DFBA during an intervention on or close to the DFBA of the same Electrical Safety Subsector, e.g. : DFBAD.6R2 & DFBAE.7L3 of A23.  Reactivity assured due to the fact that the Chargé de Travaux HCC was present 5 days a week. From week 8 : two days a week (Tuesday and Thursday) : The requests for déconsignations or autorisations de travail are to be planned accordingly. For urgent interventions which could not be planned accordingly : Chargé de Travaux from TS/EL. To be limited.