SPL cavity design by IPN Orsay Guillaume OLRY 111-13 November 20093 rd SPL collaboration meeting.

Slides:



Advertisements
Similar presentations
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
Advertisements

First international Design Review of the MYRRHA accelerator. Spoke Cryomodule Design Bruxelles- 12/13 November 2012 First international Design Review of.
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
th Gentner Day 2013 BE-RF-LRF HOM Couplers for CERN SPL Cavities Comparison of different design approaches K. Papke, F. Gerigk, U. van Rienen.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
SCRF Activities at IPN Orsay Sébastien Bousson On behalf of the SCRF group Eurisol Net Meeting – CERN, 28 th June 2011.
Cavity design Fundamental parameters : frequency, beta, number of cells (gaps), Eacc Optimisation : R/Q, surface fields / Eacc, Qex, damping of HOMs, kloss,
ESS cavities interfaces
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
The design of elliptical cavities Gabriele Costanza.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
1 Spoke cavities for ESS and MYRRHA G. Olry, P. Duchesne (IPN Orsay) SLHiPP-2, 3-4 May 2012, Catania.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
I. Ben-Zvi Update Ilan Ben-Zvi for the Stony Brook, BNL and AES SPL teams Presented by Rama Calaga.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Report from WG2 (cavity) and objectives of the meeting W. Weingarten / CERN 3 rd SPL Collaboration Meeting CERN 11 – 13 Nov /Nov/2009 W. Weingarten13rd.
CSC, Status of HIPPI – September 2008 M. Vretenar, A. Lombardi.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
LASA status for medium-beta cavity Paolo Michelato.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
1 SLHiPP2013 meeting – Louvain la Neuve Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax : +33.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
SC cavity development for IHEP Jianping Dai RF group, Accelerator Center, IHEP International Review Meeting on C-ADS Acc. Phys. Design, Sept. 19~20,
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Status of the beta=0.65 cavity RF desigN
CERN – Zanon discussions
WP5 Elliptical cavities
Status of developments at CEA-Saclay
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
Hosting Orsay Walid KAABI
SC spoke cavity for China-ADS 3~10MeV injector
Double Quarter Wave Crab Cavity
HWR Cavities for China ADS
Superconducting RF Crab Cavities
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
RAPPEL TITRE PRESENTATION
HIE-LINAC status report
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
Double-Spoke Cavities
FLUX TRAPPING STUDIES ON LOW BETA CAVITIES
Presentation transcript:

SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting

Outline November rd SPL collaboration meeting 2 Introduction RF design Planning

Commitment within November rd SPL collaboration meeting Sub-task 1: Design and fabrication of beta= MHz elliptical cavity equipped with a Titanium helium reservoir. Preparation (BCP, HPR) and assembly in clean room. […] Test of the cavity in vertical cryostat […]. Task 4: SC Cavities for proton linacs Design, fabrication and tests of beta=0.65 and beta=1.0 cavities with the goal to reach announced performances. […] WP11: SRF: SC RF technology for higher intensity proton accelerators & higher energy electron linacs Introduction

RF parameters November rd SPL collaboration meeting 4 Conceptual design of the SPL II, CERN Epk/Ea < 2.63 Bpk/Ea < 5.26 mT/MV/m Introduction “Performance Improvement of the Multicell Cavity Prototype for Proton LINAC Projects”, B. Visentin et al., LINAC 2004 Test results of 704 MHz, 5-cell, beta 0.65

Starting from 2D to 3D November rd SPL collaboration meeting 5 RF design 1999: Cavity design with SUPERFISH with no RF coupler and HOM ports  =0.14m 2009: New 3D model with Microwave Studio

EM fields – fundamental mode November rd SPL collaboration meeting 6 RF design Magnetic field Electric field

RF parameters November rd SPL collaboration meeting 7 RF design Half-cell close to RF coupler adjusted for field flatness  0.2 mm  +28% Field flatness < 5% Cell-to-cell coupling=0.74% rx2s +28% Coupler side

RF parameters (con’t) November rd SPL collaboration meeting 8 RF design f (MHz)703.5too be matched Ep/Eacc3.11too high Bpk/Eacc (mT/MV/m)4.95Ok r/Q (Ohm)352Ok G (Ohm)200Ok  opt & 1 Joule (MV) 1.26Ok Qo Rres=2n  ) Ok Epk/Eacc=f(  )Bpk/Eacc=f(  )

External coupling Qext November rd SPL collaboration meeting 9 RF design Lte Lts Lts2 Dp rp rant Lant Lp Goal: Qext= with  ant=43.5 mm and  port=100 mm Parameters:  beam tube=120 mm Lant=151 mm (1 mm of penetration inside beam tube) Dp=72 mm 120 RF design

Preliminary drawings November rd SPL collaboration meeting 10 RF design No flanges, no Helium reservoir 992 mm (w/o flanges) 364 mm

Planning November rd SPL collaboration meeting End of November: finish RF design, check HOM’s Mid-November to end of December: mechanical calculations, design of the Helium tank, check the interfaces with the cryomodule (integration of the CEA-type tuning system, and RF coupler) 2010 End of January: technical drawings ready for production, technical specifications for fabrication, Niobium order (3/4 months, ~40 k€) February to mid-March: cavity call for tender End of March: choice of the manufacturer Mid-April: kick-off meeting, beginning of the fabrication (~8 months).

Thank you for your attention November rd SPL collaboration meeting 12 IPN Orsay team RF: D. Longuevergne (PhD), F. Bouly (PhD) Mechanics: H-M. Gassot CAD: S. Rousselot