9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20 July 2007.
R. van Weelderen, LIUWG, IT upgrade phase I: Status of cryogenic scheme evolution (in work) Outline - Old & new layout - Design constraints.
ILC IR FINAL FOCUS & EXTRACTION MAGNETS Prepared by Andy Marone ILC Workshop, Sept
The integration of 420 m detectors into the LHC
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Overview of Main Linac Cryomodule (MLC)
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Overview of the ESS Linac Cryogenic Distribution System
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
1 Cryogenic System of Interaction Region (SiD, ILD, QD0, QF1, Crab Cavity) in the Japanese Mountain Site WebEx meeting : June 19 th, 2012 IPNS/Cryogenic.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
SIS 100 Vacuum chamber Recooler String system Components
Final Design Cryogenic and mechanical configurations
Status of the PANDA Solenoid Magnet Production in BINP
Magnet cryogenic system update.
HFM Test Station Main Cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
BDS Cryogenic System RDR Status and EDR Plans
LARP Vertical Test Facility
ILC Cryogenic Systems Draft EDR Plan
Question 1) Are two ports current leads?
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
Cryogenic cavern in Asian site
ILC Experimental Hall Cryogenics An Overview
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
PANDA The conceptual design of the control Dewar
as a prototype for Super c-tau factory
Cryogenic behavior of the magnet
Presentation transcript:

9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL

9/17/07IRENG072 Major Components in ILC IR Hall Interchangeable Detectors

9/17/07IRENG073 Cryogenic Block Diagram in ILC IR Hall

9/17/07IRENG074 Cryogenic Block Diagram with Detectors

9/17/07IRENG075 Possible Combination of Cryogenic Hardware Issues associated with type and number of refrigeration hardware will be studied when system parameters and requirements become available.

9/17/07IRENG076 2 K Cooling Scheme for Magnets QD0, QF1 Magnet is cooled in He II at ~ 2 K, 1 bar Design capacity is 15 W

9/17/07IRENG077 Basic Cooling Requirements for IR Magnets Keep magnet below 2.1 K at 1 bar Design for removing 15 W heat load Service Cryostat is installed at approximately 10 meter from the magnet Magnet and Service Cryostat are connected by a vacuum envelop which contains 6 lines. The largest line is 3 inch in diameter for 1 bar Helium II and is used to provide 2 K cooling and electrical connection “No” vibration should be introduced

9/17/07IRENG078 Description of Service Cryostat Service Cryostat is used for interfacing Magnet with Cryogenic Distribution System, CDS or Liquefier 4 K Cooling is converted to Superfluid helium Service Cryostat consists of a 4.5 K liquid helium reservoir, a (4 – 2 K) JT heat exchanger, an 1.8 K Evaporator, and ~ 5 cryogenic valves Lead pot and ~ 10 current leads are not shown on the flow diagram

9/17/07IRENG079 Temp. profile along a channel filled with He II at 1 atm, G. B Marion etc. X(T c ) - X(T w ) = q 3.4 x L

9/17/07IRENG0710 Cross Section of Magnet Superfluid Liquid Helium, 1 bar, ~ 2 K. 8 x ½” tube for 4.5 K shield, 4 for supply, 4 for return Helium Vessel around Magnets

9/17/07IRENG0711 Vacuum Vessel Magnet Line – 1.8 K, 1 bar Helium Supply & Return – 4.5 K shield 80 K shield is not provided at this cross section A small vent tube for cooldown, not shown, will be added. Cross Section of Connecting Pipe between Magnet and Service Cryostat Near Magnet

9/17/07IRENG0712 Piping Connection to Cryogenic Distribution System or Liquefier

9/17/07IRENG0713 Moving Requirement of Detector and QD0s Detector and QD0 need to be moved by ~ 20 meters Require ~ 50 m of Flexible Transfer lines between QD0 service cryostat and liquefier (or CDS) QF1 and Crab Cavity do not move (Rigid Transfer Lines between service cryostat and liquefier (or CDS))

9/17/07IRENG0714 Other Cooling Requirements – Mode of Operation Independent warmup or cooldown for each magnet? Parker has scenario for common operation “must be vs may be independent”

9/17/07IRENG0715 Baseline Heat Loads Heat loads at 1.8 K, 4.5 K and 80 K for QD0 are –15 W at 1.8 K –30 W at 4.5 K –500 W at 80 K Heat loads for QF1 are assumed to be the same as QD0 for the time being Total heat load for two sets of QD0 and QF1 –60 W at 1.8 K –120 W at 4.5 K –2000 W at 80 K

9/17/07IRENG0716 Survey of Flexible Lines End Cap (ATLAS) in 3 Different Positions Link Box for flexible cryogenic lines with link sections ~ 622 mm

9/17/07IRENG0717 Flexible Lines used on ATLAS (CERN)

9/17/07IRENG0718 Shielded Flexible Line in ISR (CERN) For Easy Installation or Moving? Inner channel: 14 mm ID Annular channel: 34 mm ID, 51 mm OD 30 layers superinsulation, Bending radii: ~ 1 meter ~ 2.5 W, 4 K load for 50 meter length (with K shield, not all at 120 K) Shield load: ~ 170 W For larger line (~ 46 mm ID) with 80 K shield, calculated heat loads are ~ 0.15 W/m for 4.5 K and 2.5 W/m for 80 K

9/17/07IRENG0719 Number of Cryogenic Lines Between Service Cryostat and Magnet - 6 lines (The largest is ~ 3 inch in diameter) Between Cryogenic Distribution System and Service Cryostat - 6 or 7 lines –5 Vacuum Jacketed (Should be able to combine into 3 lines) –1 to 2 non-jacketed –The length is on the order of 50 meters

9/17/07IRENG0720 Lines Between Service Cryostat and Magnet Main Line for transferring 2 K Heat Load at1 bar over 10 meters, containing bus and instrumentation wires inside 4.5 K Shield Supply 4.5 K Shield Return ~ 80 K (or 40 K) Shield Supply ~ 80 K Shield Return Cooldown Return Quench Vent located near Service Cryostat

9/17/07IRENG0721 Lines Between Service Cryostat and Cryogenic Distribution System (Liquefier) 4 K Supply 4 K Return Low Pressure Return ~ 2 K (0.016 bar) (~ 1 inch inner diameter) 4.5 K (or Warm) Return ~ 80 K (or 40 K) Shield Supply ~ 80 K Shield Return Warm Return for Cooldown Warm Return for Quench Vent Note: Warm lines maybe combined

9/17/07IRENG0722 Some Thought for Transfer Lines in IR Hall

9/17/07IRENG0723 Present Understanding Cryogenic lines (including jumper) will be welded in construction. No bayonets are planned – T. Peterson SiD detector is used as an example for current study For operating purpose, it is desired to be able to move Magnet, Service Cryostat and associated Hardware for ~ 20 meters from beam center when magnet is cold – B. Parker The design should allow detector door to move without interfering with cryogenic hardware After the 1 st detector is moved to the side, it is desirable to quickly move in a 2nd detector which contains cold magnets.

9/17/07IRENG0724 Summary The cryogenic system (1 st iteration, below 4.5 K) for the ILC IR magnets QD0 and QF1 has been designed and presented. Piping interface with the IR cryogenic system has been investigated and identified. Detailed layout for cryogenic system in the ILC IR region could be cumbersome, but it is within the state of art technology. Will continue to provide input and work with the ILC IR cryogenic working group