BDP Transboundary Process: Contribution to flood mediation Annual Flood Forum 7-8 April 2005.

Slides:



Advertisements
Similar presentations
Mekong River Commission (MRC) Impact Assessment Tools and Processes on Water and related Resources Regional Workshop to Review GEO/IEA Training Manual.
Advertisements

LAO PDR Summary Findings from NOSPA Mission and Possible Next Steps.
Thailand water management policy: Case of the Mekong River Basin
Key Messages National Riparian Lands Research & Development Program Assessing Community Capacity for Riparian Restoration.
International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary.
FLOODS AND DROUGHTS IN 2002 IN THE CAMBODIAN PARTS OF THE MEKONG BASIN — EXPOSURE, RESPONSE AND LESSON LEARNED — Prepared for THE SECOND ANNUAL FLOOD FORUM,
Sharing Benefits of Transboundary Waters through Cooperation David Grey The World Bank International Conference on Freshwater Bonn, 2001.
Partnerships and Power Dealing with Power, Conflict and Learning in the Facilitation of Multi- stakeholder Processes.
Integrated adaptation approach to climate change: Enhancing social and natural climate resilience in the Mekong Geoffrey Blate & Dang Thuy Trang WWF Greater.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
Summary of Proceedings. 2 Session 1  Overview of recent Mekong River Basin Floods, by Dr. Chayanis Manusthparom  Country Reports on Flood Management.
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
Participative Methods on Cultural Value Management in Rural Areas György Fekete Central Transdanubian Regional Innovation Agency Nonprofit Ltd. Budapest,
Introduction to the Session 6 - Theme 4 – on “Water Resources Management and Governance”
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
1 “TRANSBOUNDARY WATER COOPERATION IN CENTRAL ASIA” Dr. Saghit Ibatullin, Chairman Executive Committee of International Fund for saving the Aral Sea.
IW:LEARN TDA/SAP Training Course Module 1: Introduction to the TDA/SAP Process.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Planning with floods in the Lower Mekong Basin. 1/28 The agenda Regulation.
WLE Greater Mekong project: Capacity building and professional development for inclusive governance and water and ecosystem services management of the.
Global Water Partnership Meeting the WSSD action target on IWRM and water efficiency strategies: A how-to guide.
PP 5.1: IWRM Planning Framework
Water.europa.eu Assessment of the River Basin Management Plans – preliminary findings Conference on River Basin Management Planning Ankara, 28 February.
CBA Viet Nam CBA Preparatory Workshop Bangkok, Thailand, Oct 2007.
Contribution of the Territorial Cooperation Programmes to the EU Strategy for the Danube Region Kiril Geratliev, Director General “Territorial Cooperation.
Transboundary Water Cooperation & Climate change Some important points.
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
The Governments of Cambodia, Lao PDR, Thailand and Viet Nam signed the; “Agreement on the Cooperation for the Sustainable Development of the Mekong River.
INTERNATIONAL UNION FOR CONSERVATION OF NATURE Multi-level stakeholders’ participation in trans-boundary water management: Experiences from the “Project.
1 Basin Development Plan BDP : Planning process & tools to identify, categorise & prioritise joint or basin-wide projects and programs VISION : Contribute.
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Mekong River Commission Mediation of Trans-boundary Flood Issues (Component 3) Third Annual Flood Forum Vientiane, 7-8 April 2005.
1 Integrated Water Resources Management Training Course Overview p.p. 0.1.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
1 Stakeholders involvement in BDP. 2 ContentsContents MRC & Public Participation History, Policy and Strategy BDP & Stakeholder Involvement – Stakeholders:
The Mekong River Commission Presented by Mr. Detsada Soukhaseum, Mekong River Commission Secretariat, 16 November 2015.
River Basin Management in Southern Africa Barbara Schreiner.
08 th Meeting of the Working Group on Flood Management and Climate Change Adaptation Kiev, Ukraine 13 December 2013 Project Overview Project: Climate Change.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Open Discussion on : Future Development of HIA in ASEAN Community 1 st HIA for ASEAN Workshop “Understanding HIA : A Foundation for the Well-being of the.
PLANNING CYCLE An Overview. CONTENT Expected achievements Expected achievements Why IWRM Planning? Why IWRM Planning? Why a strategic approach? Why a.
GEF-Assisted Integrated Ecosystem Management Project In The Trans- Boundary Areas Between Nigeria and Niger Republic.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
DEVELOPING THE WORK PLAN
Promoting Effective Trans-basin Water Use and Management Cooperation Among Riparian Nations: From Principle to Practice Presented by DAN TARLOCK.
1 Integrated River Basin Planning Training Course Overview p.p. 8.1.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
1 Scenario formulation Scenario-based planning is a structured way of thinking about what might happen in the future Scenarios are descriptions of possible.
1 Integrated Water Resources Management Training Course Overview p.p. 0.1.
The BDP planning cycle. Components 4 Project long-listing 3 Strategy formulation 5Shortlisting: Classification & ranking Implementation Development, promotion.
Mekong River – Negotiations Kamran Soomro Shabeena Faraz Zareen Fiza Qureshi.
December 2003, Napakuang, Lao PDR Module 3 Scenario-Based Planning for the Mekong Basin Toward a Basin Development Strategy, Lao PDR.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Mekong River Basin Transboundary Waters Management: Innovative Tools for Collaborative Decision-making World Water Forum March 21, 2009.
By Ms. Pakawan Chufamanee Director of Mekong Affairs Division, Bureau of International Cooperation, Department of Water Resources, Ministry of Natural.
(I)WRM indicators A GWP PERSPECTIVE Water Country Briefs Project Diagnostic Workshop, Geneva, December 2010 Mike Muller : GWP-TEC.
Mekong River Commission, Tools to Implement the 1995 Agreement - Dr Choomjet Karnjanakesorn, WUP Team Leader 28-Apr-17 Mekong River Commission (MRC) Water.
3rd Biennial GEF IW Conference Brasil, June UNDP/GEF Danube Regional Project and Public Participation in the Transboundary River Basin Management.
1 Role of Stakeholder Engagement in Integrated Water Management (A GEF International Waters Perspective) by Dann Sklarew, GEF IW:LEARN Asia Regional Workshop.
WHY IS INTEGRATED RIVER BASIN PLANNING IMPORTANT? Module 1 pp 1.1.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
Olumide Akinsola UNEP/GEF Volta River Basin Project Addressing Transboundary Concerns in the Volta River Basin and its Downstream Coastal Area.
Roles and Functions of Basin & sub-basin organizations
Improving JSR Practices at Country Level: Achievements and Gaps in Southern Africa Greenwell Matchaya, Coordinator for ReSAKSS Southern Africa (SA), International.
South-East European Space
About networking for water capacity development and Cap-Net’s outlook
Overview of Bank Water Sector Activities
Presentation transcript:

BDP Transboundary Process: Contribution to flood mediation Annual Flood Forum 7-8 April 2005

Contents 1.Introduction 2.The BDP planning cycle and transboundary process 3.Transboundary process in the BDP context and link to FMM 4.Example of a joint project related to flood mediation 5.Lessons learned 6.Strengths and weaknesses 7.Challenges 8.Conclusion 9.Summary

1. Introduction. What is BDP? The general planning tool and process that the Joint Committee would use to identify, categorize and prioritize the projects and programs to seek assistance for and to implement the plan at the basin level. One component of the Basin Development Plan (BDP) approach is that analysis of transboundary issues is integrated in the planning process.

1.1. Framework for dealing with transboundary issues in BDP Principle: focuses on cooperation for shared benefits in terms of economic, environmental and social needs. Approach: uses information from sub-area analysis to identify transboundary issues, which are then addressed by developing frameworks for cooperation, including 'joint development opportunities. Who? the transboundary issues are analyzed and addressed by involving extensive key stakeholders to provide their views

1.2.Concept of transboundary issues Examples: – Flood – Wetlands conservation – Loss and decline of fishery resources – Water resource sharing Development opportunities, issues of interest to more than one country. Issues affecting or involving more than one country. ( Agreed by 4 countries during the regional Meeting in Oct.04)

2. The BDP Planning cycle and transboundary process 1-2: Analysis 5: Shortlist Implementation Learning3: IWRM strategy 4: Long-list BDP Planning Cycle TB analysis TB process Influence

At sub-area level: through participatory approach in SA review, and Stakeholders Forums within each country. Issues of floods and impacts are analysed at individual SA. At TB SA level: through SA TB meetings (Between countries). Issues of floods and impacts are analysed between transboundary SAs (countries). At basin-wide level: Basin Forum (Between 4 countries). Issues of floods and impacts are analysed between 4 countries. 3. Transboundary process in the BDP context and link to FMM

SAs that share the main stream river: - SA Northern Laos and Northern Thailand (1L & 2T) - SA Central Laos and Songkram River/Upper Northeast Thailand (4L, 3L,3T). SAs that share the catchment: - SA Southern Laos/Northern Cambodia (6LC) - SA Se San/Sre Pok/Se Kong (7CLV) - SA Delta (10CV) Transboundary sub-areas 3.1. Sub-area transboundary meetings

3.2. TB Process in SA TB Meetings Step 1. Common understanding of transboundary issues Step 2. Integrating transboundary issues Step 3. Exploring opportunities for transboundary water cooperation - 7 joint projects on flood - PIN preparation using LGF - Coop. framework dev. - TB process on-going Linking to FMM Commonalities and differences Flood is identified as one of the key TB issues for BDP.

4. Example of a joint project related to flood mediation Project title: Development of the Long Terms Flood and Drought Control Plans for the Mekong Delta Objective: To improve living conditions of the people and agricultural production FMM can join BDP team and NMCs in the project PIN preparation (LGF) and at the later stage “project implementation” if there is opportunity.

4. Example of a joint project related to flood mediation Process (Outputs 1, 3, 4 of FMM) NMCs will develop PIN for joint projects for short-listing through collaborative LGF approach. Along this process, the engagement between NMCs will enable them to come up with outcome on flood mediation. Framework for cooperation will be enhanced. Flood mediation measures (Outputs 5, 6 of FMM) Through the TB analysis (Step 1 and 2), can come up with: Understanding of problems/ impacts Mechanism to address flood problems/impacts Methods to address flood problems Networking: knowledge and information sharing

5. Lessons learned The participants could raise their issues and interests in friendly way. This means that everyone was clear about the rule, and they were determined to achieve the outcome. It was possible to engage the participants in the discussion, and to make commitment for achieving the objectives and expected outputs of the meeting. This means that cooperation among sub- areas was possible, if we try to engage people in the process with good preparation and clear objectives and intended outcome. Orientation, good preparation and commitment from all riparian countries contributed to the success of the transboundary meeting. When there are opportunities for countries to engage with each other in collaborative planning process, there will be continuous actions and commitments made.

6. Strengths and weaknesses Strengths: Countries’ initiative Powerful collaborative planning process on-going Framework for cooperation to address the transboundary issues enhanced and developed Weaknesses: Lack of data and information for PIN development Negotiation protocol is difficult and time consuming

7. Challenges How to deal with high differences of interest, and negative impacts How to keep the BDP transboundary process on-going after BDP phase 1 ends How to deal with TB issues from the upstream countries

The BDP TB process is very useful and powerful planning process for MRC in two senses: The national and sub-area working groups are engaged in the process of identifying and agreement of transboundary issues and responsive measures, and joint projects to be implemented without conflicts; Framework for cooperation, actions and commitments are continuously enhanced and succeeded. 8. Conclusions As the riparian countries will implement the projects together in the future (if opportunities for financial support exists), this process of collaborative planning will be continued. Therefore, it is important that MRC continues to support and create more opportunities for the continuous engagement of this collaborative planning process.

TB Meeting 1 st Round TB Meeting 2 nd Round High priority JP PIN Preparation Framework for coop. 3 rd round TB Meeting TB Issues and JP identified Framework for coop. 2 nd round TB Meeting Regional Orientation Agreement on concept of TB issues and Framework  1 st round TB Meeting 9. Summary

Thanks for your kind attention!