1 MICE Software Phone Conference Introduction 27 th July 2005 M. Ellis.

Slides:



Advertisements
Similar presentations
Common HL7 Interface Implementation Issues
Advertisements

1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
Tips on Writing your Project Report … …and managing your project.
Maths Workshop. Aims of the Workshop To raise standards in maths by working closely with parents. To raise standards in maths by working closely with.
1Malcolm Ellis - Tracker Meeting - 18th May 2006 Reconstruction Plans  Staged process of building up Reconstruction over the rest of this year  Will.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
WCAG 2.0 Web Content Accessibility Guidelines Update Last Updated July 2007.
MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.
1 Scintillating Fibre Tracker Simulation Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.
1 SWE Introduction to Software Engineering Lecture 3 Introduction to Software Engineering.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1Malcolm Ellis - Video Conference - 7th December 2006 Data Challenge Report  Disclaimer  Data Challenge definition(s)  Software status u G4MICE u GRID.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Software Parallel Intro 1M.Ellis - CM23 - Harbin - 15th January 2009  Focus this CM continues to be on needs for analysis of data and use of G4MICE online.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
1 G4MICE Malcolm Ellis SciFi Tracker Meeting, KEK Thursday 31st March 2005.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
External Examiners Induction
1 G4MICE TOF Reconstruction & KEK Test Beam Analysis Update Aron Fish Tracker Phone Conference May 25, 2006.
Outreach at the NGS Gillian Sinclair NGS Liaison Officer.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
Continuous Professional Development (CPD) for Therapy Radiographers: An Economical Solution Lorraine Whyte INTRODUCTION Body text METHODS Body text RESULTS.
What tests do they have to sit? Why are SATs important? How does the school prepare my child for SATs? How can I help my child?
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Process Design (Requirements). Recall the Four Steps of Problem Solving * Orient Plan Execute Test These apply to any kind of problem, not just spreadsheet.
SRC Interactive course In association with:. Protecting your Rights, Promoting your Interests RYA Interactive overview:
Management by Objectives
A. Aimar - EP/SFT LCG - Software Process & Infrastructure1 Software Process panel SPI GRIDPP 7 th Collaboration Meeting 30 June – 2 July 2003 A.Aimar -
1 G4MICE Design Iteration Malcolm Ellis MICE Video Conference 21 st April 2004.
Developing Structured Activity Tools. Aligning assessment methods and tools Often used where real work evidence not available / observable Method: Structured.
1Malcolm Ellis - CM th October 2006 Status of Data Challenge  Don’t Shoot the Messenger!  Data Challenge – explanation  Software Tools u Design.
1 Persistency – Update and Plans Malcolm Ellis Software Phone Meeting 25 th August 2005.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
1M. Ellis - MICE Tracker PC - 19th October 2007 Station QA Analysis (G4MICE)  For details of software see my previous talk here: u
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
AstroGrid Oversight Committee MRC, London 30 July, 2002.
Sept 2007 K. Ingram 1 Waterfall Life Cycle An introduction to the Waterfall.
1 Software for the KEK test Malcolm Ellis 13 th April 2005.
G4MICE Status and Plans 1M.Ellis - CM24 - RAL - 31st May 2009  Firstly, a correction to the agenda:  I failed to spot a mistake in the agenda that I.
VCE IT Theory Slideshows By Mark Kelly Vceit.com Problem Solving Methodology 3 Development.
Working With Others June The aim of Working With Others ‘The aim of the specifications is to encourage candidates to develop and demonstrate their.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
1 Persistency in G4MICE 27 th July 2005 M. Ellis.
Online Reconstruction 1M.Ellis - CM th October 2008.
National Enrolment Service (NES) Overview October 2015 – June 2016.
Mantid Stakeholder Review Nick Draper 01/11/2007.
Unit 3 Guidelines to change our self image CM206.
1Malcolm Ellis - Software Meeting - 12th July 2006 Data Challenge Tasks  A set of web pages has been started to follow our progress and document the work:
M. Ellis - MICE Video Conference - 30th August Software Report Recent progress:Recent progress: –Start of code to read DATE format (two parts) One.
Introduction For Parents. © | 2 Our Objectives 1.Defining clear learning objectives and achieving them. 2.Monitoring regularity,
Upgrade Software University and INFN Catania Upgrade Software Alessia Tricomi University and INFN Catania CMS Trigger Workshop CERN, 23 July 2009.
High School Proficiency Exam (HSPE). What is the HSPE? Designed to prove that you acquired the necessary skills in English Required to graduate high school.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
1 Software Workshop Report Malcolm Ellis MICE Video Conference Wednesday 9 th November 2005.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
WEEK 6 Introduction to Project Management. Wk 6 Agenda Verify Hybrid Wk 5 Review Wk 5 ◦ Compressing the Schedule ◦ Risk Identification Techniques ◦ Project.
Analysis Model Zhengyun You University of California Irvine Mu2e Computing Review March 5-6, 2015 Mu2e-doc-5227.
Area Covered. Work Done Quantity Financial Progress of work.
Online – Data Storage and Processing
Provide instruction.
Software Session Introduction
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Models vs Representations
Global PID MICE CM43 29/10/15 Celeste Pidcott University of Warwick
Quicken Technical Help You need to follow the steps for installing the software carefully. Once it is done, you can pick up phone and call Quicken technical.
Tracker Software Status
Presentation transcript:

1 MICE Software Phone Conference Introduction 27 th July 2005 M. Ellis

2 Focus until October I would like to continue the progress we’ve been making towards a more formal release/testing structure and get at least one practise release done under the full process before the next CM. In addition, we will be trying to encourage more users of G4MICE, and this will be made easier through the provision of services such as user applications and a more flexible means of handling data. Also aim to demonstrate the use of G4MICE on analysis of real data through the KEK tracker test.

3 Testing/Release To be covered at a future PC. In the meantime, I would like all package managers to ensure that there is at least one non-trivial test for each component under their control (e.g. Reconstruction/SciFi, etc...) Once this is confirmed we can discuss the concepts behind a release process and prepare a few sample “delta” releases to get experience at the operation (cvs tags, package dependencies, etc...)

4 User Applications Need the ability to create flexible applications that use the G4MICE software. Applications such as Simulation, etc already exist, but users will want to create their own specialised versions. Yagmur has a report on this next. Once we have the Applications, then we can start talking about persistency...