0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.

Slides:



Advertisements
Similar presentations
C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
Advertisements

Overview of Acquisition Policy Changes
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
Systems Engineering and Parts Management
Acquisition Planning NCMA
1 Space Systems Acquisition Policy/Guidance Rapid Deployment Training (RDT) January 2015.
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
SE Team Agenda Review work being done by Dwayne –Review Sect 4.4.X for DAG – being processed –SEP Guide – being processed; seen as OK –Technical Reviews.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Life Cycle Logistics.
D Appendix D.11. Toward Net-Centric Acquisition Oversight A Proposal for an Acquisition Community of Interest (COI) MID 905 Streamlined Acquisition.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Lecture 2.1b: DoD Acquisition Process (SEF Ch 2)
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
1 Systems Engineering Initiatives 26 June 2007 Dr. Don Gelosh Sr. Systems Engineering Consultant OSD(AT&L)/SSE/ED.
Materiel Development Decision (MDD) Information Requirements
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Business, Cost Estimating & Financial Management Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Competitive Prototyping – the New Reality
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Production Considerations
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
New Space Systems Acquisition Policy
ISA 201 Intermediate Information Systems Acquisition
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
ISA 201 Intermediate Information Systems Acquisition
Test and Evaluation Considerations
DoDI Approved 8 December 2008
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
Product Support Considerations
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
8 Tech Processes Drive Acquisition
The Department of Defense Acquisition Process
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
Presentation transcript:

0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy

1 2 Nov 2010, V1.4 Cancels Interim Guidance of March 2009 Amends DoD Instruction Impacts operation of the Defense Acquisition System and duties of key officials Effective immediately DTM is available at Directive-Type Memorandum (DTM) , October 18, 2010: Implementation of New Space Systems Acquisition (SSAP) Policy

2 2 Nov 2010, V1.4 Implementation of New SSAP DTM Changes to Policy and Procedure 1.Independent Program Assessment (IPA) 2.Technology Development Strategy (TDS) Considerations 3.Systems Engineering Plan (SEP) Considerations 4.Systems Design Review (SDR) 5.Post-System Design Review Assessment (P-SDRA) 6.Approval for Long-Lead Items at Milestone B 7.Entrance Criteria for Production and Deployment Phase 8.Milestone C and Production and Deployment Phase 9.Follow-On Production Decision for Space Systems 10.Entrance Criteria for Operations and Support Phase 11.Material Development Decision (MDD) for Follow-On Increments Applies to acquisition of military space systems

3 2 Nov 2010, V1.4 Red Star denotes Space related revisions to DoDI (08 Dec 2008) New Space Acquisition Policy Acquisition Management System Revisions DoDI (8 Dec 2008 with Space-Related Revisions) Materiel Solution Analysis Technology Development Engineering & Manufacturing Development Production & Deployment Operations & Support Material Development Decision Post SDR Assessment Follow On Buy Approval SDR/SFR PDR CDR A B C IOC FOC IPA SRR IPA Technology Development Strategy (TDS) Approval (w/Space related provisions) Acquisition Strategy Approval JROC CDD JROC CPD Initial CDD JROC ICD IPA

4 2 Nov 2010, V1.4 Implementation of New SSAP Independent Program Assessment (IPA) Independent Program Assessments (IPAs) are: ـ An independent, comprehensive, and systematic review of major space system managerial and technical progress ـ Designed to identify program cost, schedule, and performance risks; formulate risk mitigation plans; and provide feedback both to the PM and the Milestone Decision Authority (MDA) An IPA will be conducted: ـ Before each milestone ـ Prior to Post-SDR Assessment ـ Whenever directed by the MDA

5 2 Nov 2010, V1.4 Implementation of New SSAP Technology Development Strategy (TDS) Considerations In addition to DoDI requirements, TDS for Space Systems shall detail acquisition strategy and contracting approach for development of pertinent technologies for each phase of program lifecycle See Defense Acquisition Guidebook, Chapter 2 for content of TDS

6 2 Nov 2010, V1.4 Implementation of New SSAP Systems Engineering Plan (SEP) Additional Considerations In addition to DoDI requirements, the SEP shall: Emphasize space system’s integration with other existing and approved future architectures and capabilities Include Mission Assurance (MA) planning ـ Description of those activities undertaken to ensure that space systems operate properly once launched into orbit, since retrieval for repair is impractical DoDI : The SEP shall describe the program’s overall technical approach, including key technical risks, processes, resources, metrics, and applicable performance incentives. It shall also detail the timing, conduct, and success criteria of technical reviews. Current guidance for preparation of the SEP is at

7 2 Nov 2010, V1.4 Implementation of New SSAP Conduct of Systems Design Review (SDR) PMs shall conduct a SDR during Technology Development (TD) Phase to: ـ Ensure system’s functional baseline is established ـ Ensure systems has reasonable expectation of satisfying Initial Capabilities Document (ICD) requirement within allocated budget and schedule SDR ـ Completes process of defining items or elements below system level ـ Assesses decomposition of system specification to system functional specifications ـ Determines whether system’s functional definition is fully decomposed ـ Determines that program is prepared for preliminary design

8 2 Nov 2010, V1.4 Implementation of New SSAP Conduct of Post-SDR Assessment PMs shall provide a Post-SDR report to the MDA: ـ Assessment of design maturity and summary of system-level SDR results ـ Independent vulnerability assessment and orbital debris mitigation risk report MDA shall conduct a Post-SDR Assessment ـ Reviews PMs Post-SDR Report ـ Determines if more action is necessary to achieve TD phase objectives and satisfy ICD ـ Results documented in Acquisition Decision Memorandum (ADM) An IPA will support the Post-SDR Assessment

9 2 Nov 2010, V1.4 Implementation of New SSAP Authorization for Procurement of Long-Lead Items at Milestone B In addition to DoDI requirements, Milestone B shall normally include authorization for procurement of long-lead items necessary for authorized number of initial production articles

10 2 Nov 2010, V1.4 Implementation of SSAP Entrance Criteria for Production and Deployment Phase In lieu of the DoDI requirements to have acceptable performance in DT&E and Operational Assessment (OA), and no significant manufacturing risks, space systems shall be required to have acceptable performance in developmental test activities and acceptable manufacturing risks

11 2 Nov 2010, V1.4 Implementation of SSAP Phase Description of Production and Deployment Phase Milestone C shall be described as the initial production review and shall be conducted as soon as feasible after program CDR ـ Authorizes acquisition-related activities associated with fabrication, integrated T&E, to include DT&E and OT&E, deployment (e.g. launch), and support of new space system ـ MDA shall review post-CDR report, determine whether additional action is necessary to satisfy EMD phase exit criteria, address and resolve orbital debris compliance issues, and approve entry into production and deployment phase for initial number of production articles Post CDR Assessment takes place at Milestone C

12 2 Nov 2010, V1.4 Implementation of SSAP Phase Description of Production and Deployment Phase MDA will approve subsequent article production at a Follow-on Production Decision MDA may direct an In-Progress Review (IPR) after Milestone C, but prior to follow-on production decision review, to assess progress and determine if any additional actions are necessary to support a Follow-on Production Decision

13 2 Nov 2010, V1.4 Implementation of SSAP Follow-On Production Decision for Space Systems MDA shall conduct a Follow-on Production Decision Review in lieu of a full-rate production and deployment decision to authorize procurement of additional space system articles beyond those authorized at Milestone C Statutory and regulatory information requirements in DoDI for full-rate production and deployment reviews shall apply to follow-on production decision review for space systems An OSD Independent Cost Estimate (ICE) is required to support a Follow-on Production Decision

14 2 Nov 2010, V1.4 Implementation of SSAP Entrance Criteria for Operations and Support Phase In addition to DoDI requirements, space systems shall be required to have acceptable performance in integrated T&E, to include DT&E, OT&E, and user acceptance of the system A Follow-on Production Decision Review may not be required as an entrance criteria if, for example, only one space system article is being acquired Current O&S Phase Entrance Criteria: Approved Capability Production Document (CPD); approved Life Cycle Sustainment Plan (LCSP); and successful Full-Rate Production (FRP) Decision

15 2 Nov 2010, V1.4 Implementation of SSAP Material Development Decision (MDD) for All Follow-On Increments All follow-on increments shall be preceded by a Materiel Development Decision (MDD) to: Assess prior increment’s progress Consider additional requirements for that increment Determine proper phase of entry for next increment

16 2 Nov 2010, V1.4 Designates Under Secretary of the Air Force as the Senior Air Force Official for space matters Transfers space acquisition from Under Secretary (SAF/US) to Asst Secretary for Acquisition (SAF/AQ) Realigns Space PEO reporting from SAF/US to SAF/AQ Maintains Air Staff A3/A5 role for space operations and requirements Continues Air Force Space Command as lead for space related capabilities Creates Air Force Space Board Secretary of the Air Force Memorandum, HQ Air Force Space Management and Organization, 25 Aug 2010 New Space Systems Acquisition Policy Air Force Changes SECAF Memo is available at

17 2 Nov 2010, V1.4 DTM to be incorporated into DoDI within 180 days Additional guidance, best practices, lessons learned, and expectations will be provided in the Defense Acquisition Guidebook (revision date TBD) Implementation of SSAP What is Next? Additional Information Related to Space Acquisition is Available at DAU’s Space Acquisition Community of Practice