MIDROC GOLD MINE is located in southern Ethiopia some 500 km south of Addis Ababa. This plant is gold recovery plant established 20 years ago it’s former.

Slides:



Advertisements
Similar presentations
Topic 1: Types of ore Bodies and Mine Processes
Advertisements

Assessment report (Digested) on The Kemco Witman by A Calcium Carbonate Producer who uses the Kemco Witman (2 units) in Japan “Kemco Witman” Centrifugal.
CIMExcel Software Inc. Slide 1 Mineral Processing Operations Simulator (MPOS) MPOS can be used for multiple purposes including, DCS system checkout, tuning,
CIMExcel Software Inc. Slide 1 Performance Solutions for the Mineral Processing Industry Advanced Mineral Processing Control (AMPC) Mineral Processing.
CIMExcel Software Inc. Slide 1 Performance Solutions for the Mineral Processing Industry for Pit to Plant Optimization Optimal Mineral Processing Control.
Drilling Engineering – PE311 Circulating System
Sample Points Marked in Blue Letters A – Mill Feed X-Ray Sample B – Pb Tail X-Ray Sample C – Bulk Con X-Ray Sample D – Final Tail X-Ray Sample E – Zn Con.
1 Real World Requirements Gathering and Project Prioritization in the Era of Big Data and Analytics Rob Risany Aviana Global David Roscoe Doe Run.
LIBERATION, SEPARATION, EXTRACTION
Mining & Mineral Resources
IDENTIFIED BY GOVERNMENT UNDER ZIMBABWE AGENDA FOR SOCIO-ECONOMIC TRANSFORMATION (ZIMASSET) AS ONE OF THE MAIN PILLARS IN ECONOMIC RECOVERY.
Pulping and Bleaching PSE 476 Lecture #5 Continuous Reactors Lecture #5 Continuous Reactors.
CIMExcel Software Inc. Slide 1 Performance Solutions for the Mineral Processing Industry Optimal Mineral Processing Control (OMPC) Mineral Processing Operations.
143 rd SME Annual Meeting 26 February 2014 Mike Albrecht, PE Teaching new employees about processing equipment What it is and how.
COPPER, THE STORY BY KATY NUNN & CHRIS NEWBOLD SALTLAKE CITY COPPER MINE.
Flotation Flotation involves separation of solids from the water phase by attaching the solids to fine air bubbles to decrease the density of the particles.
Production of aggregates. Where does gravel come from Mines – rivers, banks, quarries Rivers – use dragline to mine gravel from river Banks – veins of.
STEAM CONDENSERS.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
 Minerals are necessary to our modern way of life.  Mineral deposits, a location that contains a large amount of a type of mineral, are sources of:
International Atomic Energy Agency Uranium Geology and Deposits, Exploration, Mining and Milling and Environmental Issues Seminar on Nuclear Science and.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Hydronic Mechanical Controls
Lead recovery from metallurgical slag by flotation Paulo F. A. Braga, João A. Sampaio, Carlos A. M. Baltar, Arnolfo M. Coelho, João A. F. Nunes.
Mercury is cyanide soluble and therefore is removed from the ore and follows through the process solution. Mercury is adsorbed onto the activated.
Amrit Prakash Jonko 08MN23.  A method of mining whereby high value ore is mined in such a manner as to make the low-grade ore left in the mine incapable.
Metallurgy Mining of Ores Ore Concentration or Dressing Metal Extraction.
ZERO LIQUID DISCHARGE IN RCF BASED PAPER MILL A CASE STUDY A CASE STUDY VAIBHAV PAPER BOARDS PRIVATE LIMITED Vapi, Gujarat. Presented By Mr. Suresh C.
100 YEARS OF MINING RESEARCH: 100 YEARS OF MINING RESEARCH: Phoenix, Arizona; February 28 - March 03, 2010 Practical final pit depth considering the future.
Logo L u c k y P e n n y The presentation will begin shortly…
What are Copper Ores? Ores are samples of earth that contain specific rocks and minerals composed of desirable elements combined with less useful waste.
SAURAV SHARMA 2013UGMM001 ITESH KUMAR TAMSOY 2013UGMM002 NISHANT KUMAR 2013UGMM017.
Mining And its environmental impact. What determines the type of mining? Underground v.s. Surface Mining v.s. Solution Underground v.s. Surface Mining.
2006  MEADOWBANK GOLD PROJECT Cumberland Resources Ltd. AIR QUALITY EIS.
Elution behaviour of metals from carbon SAIMM 2009 M Jeffrey R Pleysier K Bunney.
16.2.
1. SIVA By Prof. Dr. Attaullah Shah 2 Fine and Coarse aggregates.
Week 8. COAL Timing Will Be Big Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year by.
FLOW CHART FOR MINERAL BENEFICIATION PROCESS Smitirupa Biswal, G.Meghana Priya 2 nd Year Students Metallurgical & Materials Engineering Dept. National.
Well-developed infrastructure of district Transport accessibility The Uskunay mine is located in Altai Krai in the area with the well-developed infrastructure.
The mined ore rocks are very large and have to be made smaller. This is done by a machine called a jaw crusher. The resulting smaller rocks are further.
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
Sloping Tube Coal Separator – KNS Innovative solutions in coal preparation 2009.
PROPOSED BHJ/BHQ BENEFICIATION PLANT AT DONIMALAI- AT A GlANCE PROPOSED BHJ/BHQ BENEFICIATION PLANT AT DONIMALAI- AT A GlANCE  The per capita consumption.
© KCL. WCED. PENTECH Metals from rocks 1 LIST the materials that these means of transport are made from. DECIDE on the one material used in the manufacture.
Section 2: Mineral Exploration and Mining
Section 2.  Exploring rock for mineralization is the first step in finding an ore deposit.  Rock samples are taken from exploration areas and analyzed.
MINING. Mineral Resource: Naturally occurring material in or on Earth’s crust that can be extracted and processed into useful materials for a profit.
Report On Industrial Training From Submitted To:- Submitted By:- Ved Prakash, Dept. of METarun Kumar Dhanuka,IV Year, ME Krishna Kumar Purohit, Dept. of.
Describe the manner in which mining companies explore for new mineral deposits. Describe three methods of subsurface mining. Describe two methods of surface.
Magnetic separation is a process in which magnetically susceptible material is extracted from a mixture using a magnetic force. This separation technique.
The Formation, Mining, and Use of Minerals
Sorbent Handling Plant by NHI-Design & Equipment Specifications
TRANS-SIBERIAN GOLD PLC Annual General Meeting
GREENHILLS PORTUGAL LDA
Section 2: Mineral Exploration and Mining
GEOLOGY AND MINERAL POTENTIAL OF PORTUGAL
And its environmental impact
Section 2: Mineral Exploration and Mining
ADVANCES IN GRINDING technology
Mineral Exploration Exploring rock for mineralization is the first step in finding an ore deposit. Rock samples are taken from exploration areas and analyzed.
Section 2: Mineral Exploration and Mining
Chapter 6: Resources.
MECHANICAL OPERATION IN CHEMICAL ENGINEERING
Objectives Describe the manner in which mining companies explore for new mineral deposits. Describe three methods of subsurface mining. Describe two methods.
MINING.
Spillage and Material Handling Systems
Section 2: Mineral Exploration and Mining
MUHAMMAD WAJAHAT AMIN (INTERNEE, MINE PLANNING) OPEN PIT MINING TOPICS.
Section 2: Mineral Exploration and Mining
Presentation transcript:

MIDROC GOLD MINE is located in southern Ethiopia some 500 km south of Addis Ababa. This plant is gold recovery plant established 20 years ago it’s former name was Adola gold mine enterprise & it is privatized by sheik- Mohammed Ali Alamode 11 years before.A lot of improvement has been made in different sections of the plant since then to increase the throughput of the plant.

Open pit Open pit yearly rock (ore +waste) mineral push back 3.5 million Tones Ore 1.2 g/t Waste 2.2 million Steeping ratio 1:9 Equipment DRILLING 3 Pantera CM780 D 2 DM45 E LOADING 5 Excavator 2 loader HAULING 9 773D 2 775E 4 769C 4 769D

Legadembi Underground Production : t/ year Grade : 3.5 g/ton Mining method : Cut and fill stopping Access to the vain through decline of 10% size 6 meter by 6 meter located approximately 3km from the plant Sub-Level Interval: 20 meter floor to floor Access to stopes: spirals with cross cut at mid point The method adopted, with current geotechnical knowledge, is a modified AVOCA. Ventilation : through ventilation (ventilation decline)

Target ore body Four mineralised quartz vein systems have been delineated. o Lens 1 o Lens 8 o Lens 9 o Lens 2 Lens 1. Is the main target in in the mine.

MINING EQUIPMENT based on the mining and development schedule and can be divided into four categories; production, development, hauling and services Production 3 x twin boom development jumbo used for footwall drives and cross cuts 2 x production jumbo: 4 x 4m 3 LHD: used for mucking Development 2 x twin boom development jumbo: used to develop the ramp, return air drives, 2 x 4m3 LHD: used for mucking ore and waste from all development headings

East Sakaro Mine Schematic

GEOLOGY AND MINERALIZATION  East Sakaro comprises a number of lithological units including graphitic quartz mica schist, amphibolite, tremolite schist, vein quartz, metagranodiorite, graphitic quartzite and pegmatite;  the graphitic quartz mica schist and amphibolite make up the bulk of rock types in the East Sakaro area.  The same amphibolite rocks lie above and below the quartz mica schist that hosts the mineralised quartz veins.

GEOLOGY AND MINERALIZATION Two mineralised quartz vein systems have been delineated. o ES-Vein 1 o ES-Vein 2. ES-Vein 1 lies close to the quartz mica schist and amphibolite contact a width varying from a few cms to 6m and a strike over almost 800m. ES-Vein 2, within intensely sheared graphitic quartz-mica schist. The vein ranges from a few cms to 25m in width and a strike length of at least 450m The resource on which the mine development is based is the quartz vein within intensely sheared graphitic quartz-mica schist.

RESOURCES The geological modeling indicates a resource for ES-Vein 2 of 506,000t at 20.40g/t Au, Based on a 1g/t Au cut off grThe The mine design analysis has resulted in a mineable ore reserve of 543.5kt within ES- Vein 2, based on a nominal 3g/t

ACCESS AND MINING METHOD Access to the vain through decline of 14% size 5 meter by five meter located approximately 1km from the plant Sub-Level Interval: 15meter floor to floor Access to the sub-levels of the stopes for the LHD is via cross-cuts, driven 4m by 4m. The method adopted, with current geotechnical knowledge, is a modified sub-level open stoping referred to as the modified SLOS method (AVOCA).

MINING EQUIPMENT based on the mining and development schedule and can be divided into four categories; production, development, hauling and services Production 3 x twin boom development jumbo used for footwall drives and cross cuts 2 x production jumbo: 2 x 4m 3 LHD: used for mucking Development 2 x twin boom development jumbo: used to develop the ramp, return air drives, 3 x 4m3 LHD: used for mucking ore and waste from all development headings.

Crusher unit MIDROC GOLD MINE has two crushing plants erected in parallel namely Medina Crusher Old Crusher Jaw Crusher Open circuit superior crusher Throughput : t/h Maximum feed lump size : mm Superior Crusher Capacity : 162 t/h Discharge opening range : mm Hydro cone Crusher Capacity :81 t/h Discharge opening range :8 -25mm

Surge hopper Vib. feedr Hydro cone loader Vib. feeder Single togle 2 stoc k Vib feeder S-3000 superior DD screen hopper Feeder 2 Hydro cone Loader Vib feeder double togle 2 stoc k feeder 2 superior DD screen Vib feeder Fina l stoc k RUN OF MINE STOCKPILE

MILL Circuit type : Road mill open circuit : Ball mill closed circuit Throughput : 220t/h (dry) Ore feed size : 13mm The annual performance of the plant is as Mill ore 1.2 million 4 g/t Further size reduction takes place in the liquid media here. There are two types of mills namely Road &Balls, the crushed material from the crusher final stockpile initially conveyed to Road mill by means of vibrating feeder &conveyer belts fitted for this purpose.at the feed spot to the road mill, the ore will be mixed with water & lime solution.

Hydro cyclone Discharg e sump Trash screen Thickener o/f pump u/f pump O/f tank s/scr een Ball mill Rod mill Discha rge pump To leach tank

Reagent mixing & Thickener unit Thickening : is a process accomplished in thickener tank (diameter 13m & height 7m). It is imperative to decrease the quantity of water. To maintain the pulp density between %. Reagent mixing: is the process of mixing lime, flocculent, and sodium cyanide to the solution.

Lime holding tank Flocculen t holding tank Cyanide holding tank Flocculen t preparati on tank Lime mixing tank Cyanide mixing tank 2x war Warm pump Warm pump 2x mono Warm pump Floccu hopp Mono pump Mono pump Lime To leach tank Process water Cyanide To thickene r tank Return line

Leaching : Thickener under flow is pumped to leach feed distribution box and then gravitated to the first of the six series connected leach tanks via sampler box where the feed is sampled by an auto sampler. Leach tank 1 Leach tank 2 Leach tank 3 Leach tank 5 Leach tank 4 Leach tank 6 To CIP tank Thickener Lime Cyanide Leach circuit

The purpose of regeneration is to reuse the eluted carbon being after organic mater removed by means of heat about 750 〫c in absence of air in a rotary kiln feed continuously from carbon accumulated in the eluted carbon tank by means of dewatering screw feeder. The purpose of regeneration is to reuse the eluted carbon being after organic mater removed by means of heat about 750 〫c in absence of air in a rotary kiln feed continuously from carbon accumulated in the eluted carbon tank by means of dewatering screw feeder. Carbone regeneration

Pump carbon Furnace screen Activate carbon Jig Horizo ntal screen boiler NaOH prepa tank Vibrating screen Acid tank Water tank Acid wash To gold room Recycle Electrolytic tank From horizontal screen Heat

1.The first dam: which is lied on wide area. All the slurry will settle in this dam while the cyanide containing water is floating at the top. Every day, sample will be taken from this dam before the cyanide containing water will be released to the second dam. It will not be released unless the cyanide concentration become about 20 ppm. 2.The second dam or reclaim dam: the purpose of this dam is to retain the cyanide carrying water and feed to the detoxification plant. Sampling is also carried out here.

The purpose this plant is to detoxify the cyanide containing water after nature degradation by adding calcium hypo-chlorite. This water will be released to the environment only being after sample test & confirmed that it’s cyanide content is less than 0.1 ppm. THANK U Detoxification plant

CIP tail First dam Second dam Detoxificatio n plant To environment