Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January 2007 1 Ground Safety Status.

Slides:



Advertisements
Similar presentations
APOLLO 13 Safety Message Bob Sieck Odyssey Spacecraft NASA Project Engineer April 1970.
Advertisements

Mission Success Starts With Safety GSFC Electrostatic Discharge (ESD) Control Program Are you plugged in? Jeannette Plante, Program Manager, Code 300.
Battery Safety and Design Manual for Payloads presented by Jerri S. Ling September 13, 2004 presented by Jerri S. Ling September 13, 2004.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
BRC Food Safety Quality Management System Training Guide
The Maintenance and Engineering Organization
Leland D. HillAMS-02 Phase II Flight Safety Review - May AMS-02 Safety Summary.
Process Safety Management
Visit us at E mail: Tele: www.globalmanagergroup.com.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
© Evaluating Electrical Risk Factors Module 3.
From Research Prototype to Production
5-1 Constellation Space Suit System Government Capabilities and Facilities Crew and Thermal Systems Division.
NASA PREFERRED TECHNICAL STANDARDS PUBLISHED
AC Transit Hydrogen Energy Station / Oakland Fire Department Project AC Transit Hydrogen Energy Station / Oakland Fire Department Project You want to do.
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
1 Alpha Magnetic Spectrometer – 02 Phase III Flight Safety UPS Overview Jan John A. Heilig ESCG/Jacobs.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
What Documentation Needs to be Submitted With an Approval Application?
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Approvals and Permits Division Isreal Mallard Transportation Specialist,
National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY 1 NASA TECHNICAL STANDARDS WORKING GROUP.
Constellation Space Transportation Planning Office July 30, 2009.
RLV Working Group Reusable Launch Vehicles Working Group Presentation to the COMSTAC 18 May 2007 Michael S. Kelly, Chairman.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
1 Identification of non-applicable chapters and sections using the NASA-STD Annex Table of Contents as they relate to payload systems, instruments,
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Payload Safety Review Plan and Issues Leland D. Hill.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
MICE Video Conference November 11, 2002 Safety Scheme on the Facility Integration Edgar Black IIT.
Controlled Storage Training Presented by Marcie Dickson Honeywell Quality Engineer NASA Safety and Mission Assurance
A Partnership For The New Millennium & You!
May 2001, Istanbul Workshop Production Certification Process Status Jack Fowler.
Linda Bagby - SBN Program Electrical Coordinator ICARUS Electronics Meeting 27 January 2016 SBN Program Operational Readiness Clearance.
Safety and Mission Assurance Lockheed Martin Space Operations (LMSO) Science, Engineering, Analysis, and Test Operation Safety and Mission Assurance Activity.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
Outreach Training Program General Industry Procedures Directorate of Training and Education Revised April 2011.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
CR AMS-02 D-0161 AMS Configuration Control Board Comments for AMS-02/D-016 Magnetic Spectrometer – 02 (AMS-02) Assembly and Testing Integration Plan.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
AMS-02 Ground Safety (Permanent Magnet) AMS-02 Design TIM May 5, 2010.
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Basically... the JHA process is your “Hazard Assessment.”
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Lowell Randel Vice President, Government and Legal Affairs Global Cold Chain Alliance.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
Page No. 1 ISS_CM_019 (Rev 09/2011) Pre-decisional, For Internal Use Only Payload Safety Review Panel (PSRP) Process Updates/Status International Space.
1 Lesson 3, Version 1.11 High Voltage Training Criteria Jason Sempsrott Arming & Firing Systems Sandia National Laboratory July 21, 2016.
CAD/PAD Development Process
Job Hazard Analysis (JHA) Training for Safety and Health Staff
THEMIS MISSION PRE-SHIP REVIEW
HAZOP Guidewords Base Set
Installation Binder / IRR – an example
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status

Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Process –Prior to handling hardware or processing at KSC, NASA requires that all hardware and operations be reviewed and approved through the Ground Safety Process –Similar to the Three Phase Flight Safety Process –Must be completed and certified prior to hardware shipment to KSC –Ground Safety Data Package (GSDP) relies heavily on the Flight Safety Package (FSP). –Phase I GSDP submitted Feb 2002

Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Current Plan for the GSDP –Identify all hazards associated with the Ground Support Equipment (GSE) Example: Assembly/disassembly of hardware –Operational Hazards –Identify hazards specific to locations the GSE will be used. Example: Hazard Analyses for the different locations the GSE will be used –Identify Integrated Hazards Example: GSE fluids become contaminated, thus contaminated fluids enter Flight Hardware

Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Hazard Summary –Examples of some hazards –Failure of Lifting Equipment –Structural Failure –Flammability –Sharp Edges –Touch Temperature –Electrical Shock –Major Hazards to be addressed –Pressure Systems –Asphyxiation –Contamination of Flight fluids by GSE –Bonding/Grounding of hardware while on the pad

Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Information Needed to Complete GSDP –Procedures Each location and operation »Assembly/Disassembly »Transportation »Testing/Operations Identify which procedures are deemed hazardous »Most will be, GSE is cryogenic. –Drawings, Schematics and Photographs Electrical Power Distribution Circuitry (EPDC) Pressure Systems tables (similar to tables located in AMS- 02-F03 and AMS-02-05) Build Drawings

Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Information Needed to Complete GSDP –List of all safety related anomalies or failures Damage during shipping Test failures Damage during assembly/disassembly –Test TPS –Material Certifications –List of Collaboration Members and planned tasks during GSE Operations –Load ratings, capabilities and safety factor of lifting equipment being used at KSC

Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Status of the GSDP –Phase I completed in 2002 –Phase I/II GSDP NLT Fall 2007 Hazards identified, Hazard Reports currently being written Text portion of GSDP currently being updated Ground Safety Data Package relies heavily on the Flight Safety Package –Phase III ECD Early 2008

Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Forward Work Continue working with KSC GSRP. Identify all documents required Identify all training/certifications for personnel Complete the Phase II and III GSRP Reviews –Determining what classes, training and certifications the International Collaboration members are required to have in order to gain access to KSC. Ex: Hazardous Communication

Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Forward Work –Continue working with the AMS Project Identifying ALL GSE to be used at KSC –Both AMS and KSC provided hardware » tools, equipment, computers, etc Identifying procedures to be conducted at KSC Identifying hazards, controls and verifications for all operations of AMS at KSC Support GSE Testing –Generate list of Collaboration partners and their Certifications for accessing KSC and operating on the GSE and Flight Hardware

Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Current HRs Failure of AMS Lifting Equipment Structural Failure during Ground Ops Magnetic Field causes injury/damage to vehicle, flight hardware or surrounding structures Flammability/Toxicity Sharp Edges Electrical damage to facilities, orbiter or other equipment Shock to Ground Personnel Electrical Short causes fire Touch Temperature exceedance Rupture of pressurized components Failure of Servicing lines Exposure to high pressure venting gases Asphyxiation Ionizing Radiation Inadvertent tipping of ground hardware JSC 1230 form

Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January CONTACT INFORMATION Arthur Nelson, Jr. ESCG/Jacobs AMS-02 Ground Safety Engineer