Barry Barish LCWS12 Arlington, TX 22-Oct-12 ILC – Status, TDR and Costs Global Design Effort 1 22-Oct-12 LCWS12 - Arlington, TX TDR Part I: R&D TDR Part.

Slides:



Advertisements
Similar presentations
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Advertisements

The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
17-April-09 TILC09 Global Design Effort 1 Barry Barish TILC09 – Tsukuba, Japan 17-April-09 ILC / GDE Report Electron Cloud at CesrTA.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
What’s been Achieved and What’s to be Done K. Yokoya ILC Annual Meeting 2012/12/20 ILC Annual, Yokoya1.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Proposed machine parameters Andrei Seryi July 23, 2010.
14-Feb-08 HEPAP Global Design Effort 1 Navigating the Bumpy Road to the ILC Barry Barish GDE Workshop - Sendai 3-March-08.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
14-Nov-11 PAC - Prague Global Design Effort 1 Barry Barish PAC - Prague 14-Nov-11 Global Design Effort Director’s Report Grooved Insert for CesrTA Wiggler.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
2-March-09 SiD Meeting - SLAC Global Design Effort 1 Barry Barish SiD Meeting – SLAC 2-March-09 ILC Report.
Status of the ILC Brian Foster (Oxford & GDE) PECFA Meeting CERN 27/11/09.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Barry Barish KILC12 Daegu, Korea 23-April-12 Global Design Effort Director’s Report Grooved Insert for CesrTA Wiggler Global Design Effort 1 23-April-12.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
OLAV-III 1 Barry Barish OLAV-III Oak Ridge National Laboratory 12-July-11 The International Linear Collider A TeV Scale Lepton Collider 12-Julyl-11.
19-May-11 PAC Mtg - Taiwan Global Design Effort 1 Barry Barish PAC Meeting Academia Sinica, Taiwan 19-May-11 GDE Director’s Report Grooved Insert for CesrTA.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
April 29, 2009 M. Ross for PM Global Design Effort 1 GDE Global Program Marc Ross for: Akira Yamamoto, Nick Walker GDE Project Managers Risk Reduction.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
Barry C Barish – Caltech Tohoku Forum for Creativity Particle Physics and Cosmology after the discovery of the Higgs Boson October 2013 The Future.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
26-Sept-11 LCWS - Granada Global Design Effort 1 Barry Barish LCWS11 - Granada 26-Sept-11 Global Design Effort ILC R&D and Technical Design Grooved Insert.
Baseline Technical Review – Central Region Accelerator Systems
ILC Accelerator Activities in Japan
Introduction and Meeting Objectives
ILC - Upgrades Nick Walker – 100th meeting
Barry Barish LCWS10 - Beijing 26-March-10
Staging in the TDR.
Status and Plan of GDE Design Work (Including Road Map for RDR)
2. SCRF General Preparation for the AD&I Preparation for AAP Review
ILC Global Design Effort
Barry Barish GDE Caltech
Yasuhiro Okada, Executive Director, KEK
Barry Barish LCWS10 - Beijing 26-March-10
Nick Walker for the Project Management
Barry Barish JSPS - Sendai 12-Sept-11
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Barry Barish Paris ICHEP 24-July-10
ILC - Global Design Effort
Presentation transcript:

Barry Barish LCWS12 Arlington, TX 22-Oct-12 ILC – Status, TDR and Costs Global Design Effort 1 22-Oct-12 LCWS12 - Arlington, TX TDR Part I: R&D TDR Part II: Baseline Reference Report Technical Design Report

GDE Status & Plans Update on major ILC accelerator R&D goals ILC Systems Tests The Technical Design Report Japanese plan and candidate sites Cost estimate and RDR comparison Staged approach? Higgs Factory  ILC Global Design Effort 2 22-Oct-12 LCWS12 - Arlington, TX

Major R&D Goals for Technical Design SCRF High Gradient R&D - globally coordinated program to demonstrate gradient by 2010 with 50%yield; improve yield to 90% by TDR (end 2012) Manufacturing: plug compatible design; industrialization, etc. Systems tests: FLASH; plus NML (FNAL), STF2 (KEK) post-TDR Test Facilities ATF2 - Fast Kicker tests and Final Focus design/performance EARTHQUAKE RECOVERY CesrTA - Electron Cloud tests to establish electron cloud mitigation strategy FLASH – Study performance using ILC-like beam and cryomodule (systems test) Global Design Effort 3 22-Oct-12 LCWS12 - Arlington, TX

The ILC SCRF Cavity - Achieve high gradient (35MV/m); develop multiple vendors; make cost effective, etc - Focus is on high gradient; production yields; cryogenic losses; radiation; system performance Global Design Effort 4 22-Oct-12 LCWS12 - Arlington, TX

Global Plan for ILC Gradient R&D New baseline gradient: Vertical acceptance: 35 MV/m average, allowing ±20% spread (28-42 MV/m) Operational: 31.5 MV/m average, allowing ±20% spread (25-38 MV/m) Global Design Effort 5 22-Oct-12 LCWS12 - Arlington, TX

Yearly Progress in Cavity Gradient Yield 6 22-Oct-12 LCWS12 - Arlington, TX Global Design Effort

Yearly Progress in Cavity Gradient Yield 7 22-Oct-12 LCWS12 - Arlington, TX Global Design Effort

S-1 Global – plug compatible 8 22-Oct-12 LCWS12 - Arlington, TX Global Design Effort

S-1 Global – plug compatible 9 22-Oct-12 LCWS12 - Arlington, TX Global Design Effort S-1 Global cryomodule assembly S-1 Global Achieved gradients

22-Oct-12 LCWS12 - Arlington, TX

FLASH: Stability 15 consecutive studies shifts (120hrs), and with no downtime Time to restore 400us bunch- trains after beam-off studies: ~10mins Energy stability with beam loading over periods of hours: ~0.02% Individual cavity “tilts” equally stable Energy stability over 3hrs with 4.5mA ~0.02% pk-pk 9 Feb 2011 Global Design Effort April-12 KILC - Daegu, Korea

FLASH 9mA achievements: 2009  present High beam power and long bunch-trains (Sept 2009) MetricILC Goal Achieved Macro-pulse current9mA Bunches per pulse2400 x 3nC (3MHz)1800 x 3nC 2400 x 2nC Cavities operating at high gradients, close to quench 31.5MV/m +/-20%4 cavities > 30MV/m Gradient operating margins (Feb 2012) MetricILC Goal Achieved Cavity gradient flatness (all cavities in vector sum) 2%  V/V (800  s, 5.8mA) (800  s, 9mA) <0.3%  V/V (800  s, 4.5mA) First tests of automation for Pk/Ql control Gradient operating marginAll cavities operating within 3% of quench limits Some cavities within ~5% of quench (800us, 4.5mA) First tests of operations strategies for gradients close to quench Energy Stability0.1% rms at 250GeV<0.15% p-p (0.4ms) <0.02% rms (5Hz) 22-Oct-12 LCWS12 - Arlington, TX Global Design Effort 12

View of STF phase-2 tunnel STF Systems Tests at KEK Global Design Effort April-12 KILC - Daegu, Korea

Fermilab – NML SRF Systems Tests Fermilab NML: RF Unit Test Facility Global Design Effort April-12 KILC - Daegu, Korea

ATF2 – Beam size/stability and kicker tests IPShintake Monitor Final Doublet Global Design Effort Oct-12 LCWS12 - Arlington, TX

ATF-2 earthquake recovery 22-Oct-12 LCWS12 - Arlington, TX Global Design Effort 16 Vertical beam size (2012) = plus-minus nm 1 sigma Monte Carlo Post-TDR continue to ILC goal of 37 nm + fast kicker Stabilization studies

Mitigating Electron Cloud Simulations – electrodes; coating and/or grooving vacuum pipe Demonstration at CESR critical tests eCloud R&D Global Design Effort April-12 KILC - Daegu, Korea

CesrTA - Wiggler Observations IWLC CERN, Geneva, Switzerland 0.002” radius Electrode  best performance Global Design Effort Oct-12 LCWS12 - Arlington, TX

*Drift and Quadrupole chambers in arc and wiggler regions will incorporate antechambers EC Working Group Baseline Mitigation Plan S. Guiducci, M. Palmer, M. Pivi, J. Urakawa on behalf of the ILC DR Electron Cloud Working Group Preliminary C ESR TA results and simulations suggest the presence of sub- threshold emittance growth - Further investigation required - May require reduction in acceptable cloud density  reduction in safety margin An aggressive mitigation plan is required to obtain optimum performance from the 3.2km positron damping ring and to pursue the high current option 22-Oct-12 LCWS12 - Arlington, TX Global Design Effort 19

Proposed Design changes for TDR RDRSB2009 Single Tunnel for main linac Move positron source to end of linac *** Reduce number of bunches factor of two (lower power) ** Reduce size of damping rings (3.2km) Integrate central region Global Design Effort Oct-12 LCWS12 - Arlington, TX

Technical Design Phase AD&I studies RDR ACD concepts R&D Demonstrations TDP Baseline Technical Design RDR Baseline Beijing Workshop TDR TDP-1 TDP-2 Change Request SB2009 evolve change control process AAP PAC Physics CERN Workshop Global Design Effort Oct-12 LCWS12 - Arlington, TX Write Reviews

22 Grooved Insert for CesrTA Wiggler Global Design Effort Conventional Facilities 22-Oct-12 LCWS12 - Arlington, TX Japan -- New Tunnel Shape

Access Tunnel ex Cavern ex. Hall ex. AH-1AH-2AH-3AH-4AH+1AH+2AH+3AH+4 120m/week 250m/week 100m/week Survey & supports set-out Electrical general services Piping & ventilation Cabling Supports Machine installation Beam Tunnel excavation Concrete Lining BDS Tunnel excavation BDS Service Tunnel excavation Invert & Drainage Shield Wall RTML (1.35k m) e-BDS (3.33km) e+BDS (2.25km) RTML (1.35k m) e- Main Linac (11.19km) e+ Main Linac (11.07km) Oct-12 LCWS12 - Arlington, TX Global Design Effort

TDR Technical Volumes Reference Design Report ILC Technical Progress Report (“interim report”) TDR Part I: R&D TDR Part II: Baseline Reference Report Technical Design Report ~250 pages Deliverable 2 ~300 pages Deliverables 1,3 and 4 * end of 2012 – formal publication early 2013 AD&I Global Design Effort Oct-12 LCWS12 - Arlington, TX

EDMS & Tech. Design Documentation Important goal to consolidate all technical documentation in EDMS in a structured fashion Global Design Effort 25 2-Feb-12 ILCSC - Oxford

New Animation of ILC (thanks to DESY group) Global Design Effort Oct-12 LCWS12 - Arlington, TX

ILC Costs -- Impact of Top Level Changes Global Design Effort Oct-12 LCWS12 - Arlington, TX

Starting Point is the RDR Costs Global Design Effort Oct-12 LCWS12 - Arlington, TX

OECD PPP (Yen/USD)-annual average by year EX-exchange rate GDP: PPP based on all goods/services in GDP of each region M&E: PPP based on machinery and equipment Const: PPP based on civil construction Full PPP determinations were done for 2005 and 2008; other year points based on GDP inflation rates PPP = Purchasing Power Parity Global Design Effort Oct-12 LCWS12 - Arlington, TX

Higgs Factory – Energy ~125 GeV from LHC –125+91=216 GeV cm  250 GeV 173 GeV Top quark –2x173=346 GeV cm  GeV Higgs self coupling (t-coupling) ??? –≥ 500 CM (up to 650 ??) TeV and beyond….? Staging / Upgrading 22-Oct-12 LCWS12 - Arlington, TX Global Design Effort 30

250 GeV CM (first stage) Relative to TDR 500 GeV baseline Half linacs solution G = 31.5 MV/m Two stage compressor (5-15 GeV) POSITRON linac straightforward ~50% ML linac cost (cryomodules, klystrons, cryo etc.) ~50% ML AC power ELECTRON linac needs 10Hz mode for e+ production  E = 135 GeV instead of 110 GeV (+25 GeV) ~57% ML linac cost (cryomodules, klystrons etc) 10Hz needs (1/2 linac × 10Hz/5Hz): 100% ML AC power (1/2 linac × 10Hz/5Hz) 80% cryo cost (50% static + 100% dynamic) Main Linac infrastructure Linac components: 50% Cryogenics: 65% RF AC power: 80% Main Linac infrastructure Linac components: 50% Cryogenics: 65% RF AC power: 80% 22-Oct-12 LCWS12 - Arlington, TX Global Design Effort 31

Y. Okada - CPM12 Fermilab 22-Oct-12 LCWS12 - Arlington, TX Global Design Effort 32

Two Candidate Sites in Asia/Japan Global Design Effort Oct-12 LCWS12 - Arlington, TX

GDE Conclusions The major R&D milestones for TDR are in-hand The TDR will be a self-contained comprehensive R&D report; with a design based on new baseline; a new value costing; and a section on project implementation planning Submit: Dec 2012; Reviews of technical design & costs; –Technical Review by augmented PAC (Dec 2012 at KEK) –Cost Review by international committee (Jan 2013 at Orsay) –TDR Overall Review by ILCSC (Feb 2013 at Vancouver) Revise, rewrite as needed; finalize and submit to ICFA at LP2013 (June 2013) GDE Mandate Complete Post–TDR ILC program: 1) extend energy reach; 2) systems tests; 3) evolve design based on technology development and LHC results; consider staged design, beginning with Higgs Factory. Global Design Effort Oct-12 LCWS12 - Arlington, TX