Agency Charging Statement Overview of Consultation 11 th February 2008.

Slides:



Advertisements
Similar presentations
Third Energy Package for Change of Supplier 2009/73/EC.
Advertisements

Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
MN ENA STATE COUNCIL TREASURER Role and Responsibilities.
Review of industry code governance 26 March 2010.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
User Pays User Group Monday 2 nd June Today’s Agenda  Introduction (HB)  Review of minutes & actions (TD)  Contractual Change  IAD performance.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Xoserve Services Workgroup. xoserve Funding Arrangements - Model Comparison ModelKey Benefits User Pays Model AUser Pays Model B Baseline Services (Core)
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
User pays presentation 6th November 1 user pays services November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 “Data Enquiry Service” Update 5 December 2011 (by )
UNC Modification 0213 – User Pays Governance Arrangements Simon Trivella – 19 th June 2008 Governance Workstream.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
1 UP commercial basis 12th November User Pays commercial arrangements – type 2 services Four contractual documents published in the public domain: - Terms.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Demand Estimation Sub-Committee Climate Change Datasets - update 22 nd September 2014.
User Pays User Group Wednesday 30 th April Today’s Agenda  IntroductionHelen Barratt  Contract and Governance – The Way ForwardAndy Miller 
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
User Pays User Group 8th December Agenda  Customer voting arrangements  UPUC & UPCEG ToRs  Funding change  Contract refinements register  Future.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
Industry Dialogue on xoserve Services 14 th September 2007.
Real Involvement Statutory guidance for section 242(1B) - the duty to involve.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
Theft of Energy ElectraLink – 03 August 2016 An Overview of The Theft Risk Assessment Service (TRAS) and Energy Theft Tip Off Service (ETTOS)
DSC Change Committee UK Link Future Releases Proposed Approach
User Pays User Committee 12th November 2013
Consideration of issues raised by UNC Modification Proposal 0244
Code Governance Review UNC Modification Proposals
Introduction of Code Contingency Guidelines Document
CSEPs Reconciliation Proposals
User Pays – Changed & New Services
Exit Capacity Substitution and Revision
Consideration of issues raised by UNC Modification Proposal 0244
Background MDD is currently managed within SPAA
Transmission Planning Code Review
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Introduction of Code Contingency Guidelines Document
User Pays Agency Charging Statement
Consideration of issues raised by UNC Modification Proposal 0244
Proposer: Debbie Brace Panel Date: 20th March 2014
User Pays Principles and Governance
Joint Office UNC Elections
Joint Office UNC Elections
Operational Update 1.
Joint Office UNC Elections
Presentation transcript:

Agency Charging Statement Overview of Consultation 11 th February 2008

Refresher  The Gas Distribution PCR proposed a core services plus user pays approach to the funding of xoserve  GTs’ allowed revenues (and transportation charges) have been reduced to allow for revenue collected through user pays charges  User pays will be treated as excluded services  User pays services are of two types:  Code: Gas Transporter obligations contained in the UNC. Invoiced under the UNC in the name of the Transporters  Non Code: All other services. Invoiced under the Contract and Conditions for non-code services in the name of xoserve  Changes are required to Transporter Licence, UNC and SPAA  Implementation date is 1 st April 2008

What is the Agency Charging Statement?  It is a document required by GT licence to be prepared jointly by the Gas Transporters and published on the agency’s website  It is required to set out  Scope of user pays services  Listed in Appendix 1 of the draft Statement  The methodology for deriving charges for user pays services  Described in section 3 and Appendix 2 of the Statement  The charges associated with such services  Listed in Appendix 1 of the draft Statement  Scope of core services  Defined as Transporter Agency Activities that are not user pays services

Consultation on the New Statement  Transporters are required to  consult interested parties on the details of the statement  furnish Ofgem with a report setting out  Any representations made and  Any changes made in consequence of representations  The Gas Transporters will seek Ofgem’s approval for the Statement

Consultation Timetable  All documents were published on the 31/1/08 on the Joint Office website:  Consultation paper giving the background to the Agency Charging Statement and questions for consultation  Draft Agency Charging Statement  Contract, Conditions and Schedules for non code services  Responses to the consultation paper should be sent to to arrive by close of play on 22 nd February  Responses will be published unless you specifically ask them to remain confidential. All responses will be forwarded to Ofgem.  Report on consultation to Ofgem by 29 th February 2008.

Questions  Questions on the content of the Consultation Paper or Draft Agency Charging Statement can be directed to the Gas Transporters or xoserve (contact details in paper)  Questions on the content of the non-code services Contract, Conditions or Schedules should be directed to

Agency Charging Statement Charging Methodology 11 th February 2008

Cost of Service Provision  GTs’ allowed revenues (and transportation charges) have been reduced by £3m (2005/06 prices)  Reduction is equivalent to £3.3m at (2008/09 prices)  The costs provided to Ofgem are based on 2006/07 actual costs, utilising the published activity cost basis methodology  The user pays regime has additional costs – operating and liabilities  However, cost reductions have been made since the original forecasts  Forecast revenue for user pays is £3.3m

Demand for Services  There is general recognition that demand will change from current levels  Demand forecasts have taken into account  Feedback from Shippers  Historical usage  Impact of different charging levels  Availability of alternative service providers  We have used mid-point estimates to derive charges

Future  GTs’ will have a licence condition for prices to reflect the costs in providing the service  GTs’ have committed to review prices within six months  GTs’ will be required to report on costs and revenues to Ofgem

user pays services implementation February 2008

User Pays Non-Code services commercial arrangements Conditions Service Schedules Contract Documents e.g. Service Request Form Agency Charging Statement User Pays Non-Code services contractual documents xoserve User Shipper Short Code (SSC) level Organisation level (many SSC) Contract for the provision of Non-Code User Pays services The contract has “no value”, it allows Non-Code User Pays services to be requested and provided.

User Pays Non-Code services commercial arrangements M Number DVD Telephone Service Reports Portfolio Reports AQ Enquiry Service Request Form Service Request Form Service Request Form Service Request Form ( Request) IX file User IAD Service Request Form (IAD access)

User Pays Non Code Services contract signature arrangements  Discuss arrangements with all organisations – Feb  Present contracts to Users for signature – Feb  Receive signed contracts no later than14 th March  Maintain contracts thereafter

User Pays Non Code Services Service Request arrangements for 1 st April  Users to consider extent of services required  Service Request form available from 1 st March (clause to make it effective from 1 st April)  Service Request form submitted to xoserve no later than 14 th March for services required from 1 st April  New processes for management of IAD account creation and deletion implemented from 1 st March  For IAD Accounts, xoserve will issue file of “live” IAD accounts in early March (creations and deletions will be managed against this register)

xoserve contacts User Pays User Group meetings: Tuesday 3 rd June Tuesday 23 rd September