W. Riegler, ECFA HL-LHC Experiment Workshop, Oct. 21st, 2014 The ALICE Upgrade.

Slides:



Advertisements
Similar presentations
Results from first tests of TRD prototypes for CBM DPG Frühjahrstagung Münster 2011 Pascal Dillenseger Institut für Kernphysik Frankfurt am Main.
Advertisements

High Level Trigger (HLT) for ALICE Bergen Frankfurt Heidelberg Oslo.
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
November 7th 2002Jim Libby (CERN/SLAC)1 Opposite Polarity Signals in Wide Pitch Sensors Jim Libby (CERN/SLAC) Introduction to the R&D in LHCb The test-beam.
Micromegas for CLAS12 Central Detector - Update Franck Sabatié November 19th 2009 Micromegas option for the Central Detector Why, Where, How ? R&D milestones.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
7 Nov 2002Niels Tuning - Vertex A vertex trigger for LHCb The trigger for LHCb ….. and the use of the Si vertex detector at the first and second.
High Level Trigger – Applications Open Charm physics Quarkonium spectroscopy Dielectrons Dimuons Jets.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Description of BTeV detector Jianchun Wang Syracuse University Representing The BTeV Collaboration DPF 2000 Aug , 2000 Columbus, Ohio.
Electronics Requirements for Tracker Upgrades A.A. Grillo Santa Cruz Institute for Particle Physics University of California Santa Cruz With much information.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
SPHENIX GEM Tracker R&D at BNL Craig Woody BNL sPHENIX Design Study Meeting September 7, 2011.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
1 Performance of the LHCb VELO Outline LHCb Detector and its performance in Run I LHCb Detector and its performance in Run I LHCb VELO LHCb VELO VELO performance.
Roger Rusack – The University of Minnesota 1.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
S.Vereschagin, Yu.Zanevsky, F.Levchanovskiy S.Chernenko, G.Cheremukhina, S.Zaporozhets, A.Averyanov R&D FOR TPC MPD/NICA READOUT ELECTRONICS Varna, 2013.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
FIT (Fast Interaction Trigger) detector development for ALICE experiment at LHC (CREN) Institute for Nuclear Research (INR RAS) National Research Nuclear.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
ALICE Arturo Tauro Werner Riegler.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Pierre VANDE VYVRE ALICE Online upgrade October 03, 2012 Offline Meeting, CERN.
Washington Meeting Preparation FCC-hh MDI meeting Mar. 13th 2015.
July 27, 2002CMS Heavy Ions Bolek Wyslouch1 Heavy Ion Physics with the CMS Experiment at the Large Hadron Collider Bolek Wyslouch MIT for the CMS Collaboration.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Workshop ALICE Upgrade Overview Thorsten Kollegger for the ALICE Collaboration ALICE | Workshop |
 Lecture I  Physics Motivation for the HL-LHC  Lecture II  An overview of the High-Luminosity upgrade of the LHC  Lecture.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Lærer-møde April 19, 2007 Dias 1 I.G. Bearden, Niels Bohr Institute ALICE: Upgrades & Perspectives.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Trigger & Tracking detector for CMS
Technology and R&D Summary and next steps Burkhard Schmidt.
 Silicon Vertex Detector Upgrade for the Belle II Experiment
The LHCb Upgrade LHCb now Upgrade motivation New trigger and DAQ
Evidence for Strongly Interacting Opaque Plasma
Results achieved so far to improve the RPC rate capability
evoluzione modello per Run3 LHC
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
ALICE – First paper.
Commissioning of the ALICE HLT, TPC and PHOS systems
ALICE upgrade plans Paolo Giubellino LHCC Upgrades
A Low Power Readout ASIC for Time Projection Chambers in 65nm CMOS
Preparation of the CLAS12 First Experiment Status and Time-Line
Quarkonium production in p-p and A-A collisions: ALICE status report
Niels Tuning (Outer Tracker Group LHCb)
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Quarkonium production in p-p and A-A collisions: ALICE status report
The CMS Tracking Readout and Front End Driver Testing
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

W. Riegler, ECFA HL-LHC Experiment Workshop, Oct. 21st, 2014 The ALICE Upgrade

Goal: o High precision measurements of rare probes at low p T, which cannot be selected with a trigger. Target a recorded Pb-Pb luminosity ≥ 10 nb -1  8 x events to gain a factor 100 in statistics over the Run1+Run2 programme and o Significant improvement of vertexing and tracking capabilities Detector: o Read out all Pb-Pb interactions at a maximum rate of 50kHz (i.e. L = 6x10 27 cm -1 s -1 ) upon a minimum bias trigger o Perform online data reduction based on reconstruction of clusters and tracks o Improve vertexing and tracking at low p T  New Inner Tracking System (ITS) ALICE Upgrade Strategy 2

ALICE Upgrade New Inner Tracking System (ITS) improved pointing precision less material -> thinnest tracker at the LHC Time Projection Chamber (TPC) New Micropattern gas detector technology continuous readout MUON ARM continuous readout electronics Muon Forward Tracker (MFT) new Si tracker Improved MUON pointing precision Data Acquisition (DAQ)/ High Level Trigger (HLT) new architecture on line tracking & data compression 50kHz Pbb event rate TOF, TRD Faster readout New Trigger Detectors (FIT) New Central Trigger Processor (CTP) 3

Long Term Schedule Run2LS2Run3 LS3Run4 LS4Run5LS5Run6 PHASE I Upgrade ALICE, LHCb major upgrade ATLAS, CMS ‚minor‘ upgrade PHASE II Upgrade ATLAS, CMS major upgrade Heavy Ion Luminosity from to 7 x10 27 HL-LHC, pp luminosity from (peak) to 5 x10 34 (levelled) ALICE will operate beyond LS3 in the HL-LHC era 4

Vaccum pressure in LSS around ALICE of 2.3x10 -8 mbar during Run1 pp resulted in excessive radiation load on the detector through beam-gas collisions  even if the IP collision rate in ALICE is low, the detector is exposed to radiation load from these beam-gas collisions. In order to ensure that the radiation load due to beam gas collisions does not exceed the radiation load from genuine IP collisions during Run3+Run4, the vacuum pressure in the LSS must be <10 -9 mbar.  LS1 vacuum consolidation (ZDC vacuum Chamber, TDI) is hopefully going in the right direction  Replacement of TDI in LS2 might be essential Vacuum in Long Straight Sections around P2 5

ALICE LS2 Scope The approved ALICE LS2 upgrade is detailed in 5 Technical Design Reports ITS Readout and Trigger System TPC (under review) MFT (Nov. 2014) Online Offline System (Jun. 2015) 6

ALICE Upgrade New Inner Tracking System (ITS) improved pointing precision less material MUON ARM continuous readout electronics Muon Forward Tracker (MFT) new Si tracker Improved MUON pointing precision Data Acquisition (DAQ)/ High Level Trigger (HLT) new architecture on line tracking & data compression 50kHz Pbb event rate TOF, TRD Faster readout New Trigger Detectors (FIT) Time Projection Chamber (TPC) New Micropattern gas detector technology continuous readout New Central Trigger Processor (CTP) 7

8

ITS performance improvement 9

10

11

12

13

Internal Architecture (two options) ALPIDE Specs comply with Inner Barrel and Outer Barrel Pixel Size: 28  m x 28  m Integration time: ~4  s Power density: 40 mW/cm 2 MISTRAL (more conservative approach) Specs optimized for OB (L3-L6) Pixel Size: 36  m x 62  m Integration time: ~20  s Power density: ~ 100 mW/cm 2 Full scale prototype of ALPIDE and MISTRAL are currently being characterized in the laboratory and test beam Preliminary very encouraging Status of ITS CMOS Pixel Sensor 14

pALPIDEfs – measurements at PS test beam Four weeks of test beam at the PS (5 – 7 GeV pions) Telescope based on a stack-up of 6 or 7 layers of pALPIDEfs Tested both thinned (50  m) and thick (450  m) chips 0V and 3V reverse substrate bias (measurem. at -6 V and after irradiation ongoing) Comprehensive characterization will continue at PS and in October at SPS 15

99% efficiency at fake hit rate of achievable (only 20 pixels masked) at 0V Reverse substrate bias (V BB ) provides additional margin Telescope based on a Stack-up of 6 or 7 layers of pALPIDEfs Spatial resolution (including tracking error of ~3  m): 5.5  m pALPIDEfs – measurements at PS test beam 16

FSBB-M0 (Full Scale Building Block Mistral 0) About 1/3 of a complete sensor (approx. 9mm x 17mm) 416 x 416 pixels of 22  m x 33  m (final chip 36  m x 62  m) 40  s integration time Full chain working (front-end, discr., zero suppression) 25 sensors characterized showing similar noise perfor. Test beam measurements at SPS in October Figure: Two FSBB M0 Temporal Noise Fixed Pattern Noise TN = 0.87mV FPN = 0.55mV FSBB-M0 – Full Scale Building Block of MISTRAL 17

ALICE Upgrade New Inner Tracking System (ITS) improved pointing precision less material -> thinnest tracker at the LHC MUON ARM continuous readout electronics Muon Forward Tracker (MFT) new Si tracker Improved MUON pointing precision Data Acquisition (DAQ)/ High Level Trigger (HLT) new architecture on line tracking & data compression 50kHz Pbb event rate TOF, TRD Faster readout New Trigger Detectors (FIT) Time Projection Chamber (TPC) New Micropattern gas detector technology continuous readout New Central Trigger Processor (CTP) 18

Muon Forward Tracker (MFT) The primary goal of the Muon Forward Tracker (MFT) is to measure muon tracks in the ALICE muon spectrometer acceptance with high precision vertexing before the large absorber. The MFT is a silicon pixel tracker complementing the acceptance of the ALICE upgraded Internal tracking system (ITS) and covering most of the acceptance of the muon spectrometer 2.5<  <3.6. The MFT detector is placed inside the ITS outer barrel, between the ITS inner barrel and the absorber and surrounding the ALICE vacuum beam-pipe. Common Silicon Sensor with ITS (15 mm x 30 mm) 19

ALICE Upgrade New Inner Tracking System (ITS) improved pointing precision less material -> thinnest tracker at the LHC MUON ARM continuous readout electronics Muon Forward Tracker (MFT) new Si tracker Improved MUON pointing precision Data Acquisition (DAQ)/ High Level Trigger (HLT) new architecture on line tracking & data compression 50kHz Pbb event rate TOF, TRD Faster readout New Trigger Detectors (FIT) TPC Micropattern gas detector detector technology continuous readout New Central Trigger Processor (CTP) 20

TPC Upgrade With an average of 5 PbPb collisions inside the drift time of 100us, the classic gating of TPC wire chambers does not work. Replace wire chambers with 4-GEM or Micromega+2 GEM Specified to have <20 Ions flowing back into the TPC volume for every primary electron being amplified, i.e. ion back flow (IBF) of <1% for a gas gain of 2000 Exploded view of a GEM IROC 21

GEM holes: Diam: 70um Distance: SP: 90um S: 140um LP: 280um TPC Upgrade 22

Testbeam: PS Nov. 2014, SPS Dec TPC Upgrade 23

Testbeam: PS Nov. 2014, SPS Dec TPC Upgrade 24

ALICE Upgrade New Inner Tracking System (ITS) improved pointing precision less material -> thinnest tracker at the LHC MUON ARM continuous readout electronics Muon Forward Tracker (MFT) new Si tracker Improved MUON pointing precision Data Acquisition (DAQ)/ High Level Trigger (HLT) new architecture on line tracking & data compression 50kHz PbPb event rate TOF, TRD Faster readout New Trigger Detectors (FIT) Time Projection Chamber (TPC) New Micropattern gas detector technology continuous readout New Central Trigger Processor (CTP) 25

Predrag Buncic, October 3, 2013 ECFA Workshop Aix-Les-Bains - 26 ALICE & LHCb in MHz 5-40 MHz 20 kHz (0.1 MB/event) 2 GB/s Storage Reconstruction + Compression 50 kHz 75 GB/s 50 kHz (1.5 MB/event)  PEAK OUTPUT  4 TByte/s into PC farm 1 TByte/s into PC farm O 2 (Online Offline) System

ALICE Upgrade New Inner Tracking System (ITS) improved pointing precision less material -> thinnest tracker at the LHC MUON ARM continuous readout electronics Muon Forward Tracker (MFT) new Si tracker Improved MUON pointing precision Data Acquisition (DAQ)/ High Level Trigger (HLT) new architecture on line tracking & data compression 50kHz Pbb event rate TOF, TRD Faster readout New Trigger Detectors (FIT) Time Projection Chamber (TPC) New Micropattern gas detector technology continuous readout New Central Trigger Processor (CTP) 27

4 pixels per T0+ module 1 pixel per T0 module Fast Interaction Trigger (FIT) Upgraded Quartz Cherenkov (T0+) and Plastic Scintillator (V0+) 28

1st prototype with amplifier on the detector 2nd prototype with amplifier after 8m of cable. FIT: T0+ Prototypes 29

FIT: T0+ Time Resolution Excellent time resolution ! For Minimum Bias Trigger, TOF Time Zero and Vertex Selection. 30

ALICE Upgrade New Inner Tracking System (ITS) improved pointing precision less material -> thinnest tracker at the LHC Muon Forward Tracker (MFT) new Si tracker Improved MUON pointing precision Data Acquisition (DAQ)/ High Level Trigger (HLT) new architecture on line tracking & data compression 50kHz Pbb event rate TOF, TRD Faster readout New Trigger Detectors (FIT) TPC  SAMPA Continuous/(triggered ) readout MUON ARM  SAMPA Continuous/trigger ed readout 31

SAMPA Chip PASA: Low Noise Shaping Amplifier ADC: 10MHz, 10bit low power SAR ADC DSP: Digital Signal Processing i.e. signal shaping, zero suppression … Memory, Serial link: High Speed links to Data Acquisition 32

A. KlugeALICE week, Oct 2, 2014 SAMPA SAMPA MPW1 3 ASICs ASIC 1, 5 front-end channels ASIC 2, ADC and SLVS driver ASIC 3, 3 channels including DSP and read-out Submission June 2014 Delivery Sept 2014 Cut and packaged 33

A. KlugeALICE week, Oct 1, 2014 SAMPA-MPW1 (80ns 30mV/fC) 34

A. KlugeALICE week, Oct 2, 2014 SAMPA SAMPA MPW2 32 – channel full scale ASIC full layout presently under design changes/adaptations after the of MPW1 possibly needed building blocks can be changed in the lower hierarchy without changing top level 35

Conclusions ALICE is preparing a major upgrade for LS2 R&D on ITS MAPs, TPC Micropattern Detectors, Online- Offline System etc. is in full swing with conclusion during 2015 Construction starting in 2015/