INFSO-RI-508833 Enabling Grids for E-sciencE www.eu-egee.org Plans for the EGEE-2 EGEE 2 Task Force 3rd EGEE Conference, Athens, April 2005.

Slides:



Advertisements
Similar presentations
Conference xxx - August 2003 Fabrizio Gagliardi EDG Project Leader and EGEE designated Project Director Position paper Delivery of industrial-strength.
Advertisements

15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
EGEE statement EU and EU member states major investment in Grid Technology Several good prototype results Next Step: –Leverage current and planned national.
INFSO-RI Enabling Grids for E-sciencE The EGEE project Fabrizio Gagliardi Project Director EGEE CERN, Switzerland Research Infrastructures.
An overview of the EGEE project Bob Jones EGEE Technical Director DTI International Technology Service-GlobalWatch Mission CERN – June 2004.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
The OMII Perspective on Grid and Web Services At the University of Southampton.
The Preparatory Phase Proposal a first draft to be discussed.
The next call FP Infrastructures-5. FP Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004.
NRTSI/NRC Project Framework for the Assessment of the State, Performance and Management of Canada’s CPI.
INFSO-RI Enabling Grids for E-sciencE EGEE-II NA5 – Policy and International Cooperation Fotis Karayannis, Joanne Lawson, CERN NA5.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
E-Infrastructure Reflection Group (eIRG) Dieter Kranzlmüller GUP/JKU & CERN
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Related Projects Dieter Kranzlmüller Deputy.
Towards the new EGI governance model Arjen van Rijn (Nikhef) Chair Organizational Taskforce (EGI_DS and Local Host)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
INFSO-RI Enabling Grids for E-sciencE Dissemination and Outreach John Dyer, Dissemination and Outreach Manager, TERENA EGEE 1 st.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE – paving the way for a sustainable infrastructure.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
European Grid Initiative – EGI Business and Technology Transfer for EGI EGI Design Study Project EGEE’09 Barcelona September 2009.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE NA5 – Policy and International Cooperation Panagiotis Louridas, Fotis Karagiannis, GRNET Final.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Multi-level monitoring - an overview James.
EIRG – e-Infrastructure Reflection Group Dieter Kranzlmüller e-IRG Chairman
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Bob Jones EGEE project director CERN.
White paper overview 2 nd eIRG meeting April, 16 th 2004 Fotis Karayannis, Editor GRNET - Greek Research & Technology Network
INFSO-RI Enabling Grids for E-sciencE External Projects Integration Summary – Trigger for Open Discussion Fotis Karayannis, Joanne.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
INFSO-RI Enabling Grids for E-sciencE Resources and Budget Robin Middleton PMB – 13 July 2005.
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
INFSO-RI Enabling Grids for E-sciencE Policy and International cooperation Matti Heikkurinen, NA5 leader CERN All Activity Meeting.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
INFSO-RI Enabling Grids for E-sciencE Status of the Project Fabrizio Gagliardi, Project Director, CERN EGEE 1 st EU Review 9-11/02/2005.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-II Status Bob Jones – Project Director.
INFSO-RI Enabling Grids for E-sciencE Policy and International cooperation Fotis Karayannis, NA5 activity leader All Activity Meeting.
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
INFSO-RI Enabling Grids for E-sciencE EGEE Contributions to e-Infrastructure policy work Matti Heikkurinen, NA5 leader, CERN EGEE.
18-May-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the LCG Security Group) Barcelona 18 May 2004 David Kelsey CCLRC/RAL, UK
INFSO-RI Enabling Grids for E-sciencE EGEE-III Status and Plans Erwin Laure EGEE-II Technical Director CERN, Switzerland.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
Authentication and Authorisation for Research and Collaboration Licia Florio REFEDS Meeting AARC and AARC2 Vienna, 1 st December.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
INFSO-RI Enabling Grids for E-sciencE EGEE general project update Fotis Karayannis EGEE South East Europe Project Management Board.
INFSO-RI Enabling Grids for E-sciencE Status of the Project Bob Jones, Project Director, CERN EGEE 2 nd EU review 6-7/12/2005.
Authentication and Authorisation for Research and Collaboration Licia Florio AARC CORBEL Workshop The AARC Project Paris, 31 May.
The European Transport Research Alliance - ETRA Prof. G. A. Giannopoulos Chairman, ETRA.
Co-ordination & Harmonisation of Advanced e-Infrastructures for Research and Education Data Sharing Grant.
Co-ordination & Harmonisation of Advanced e-INfrastructures WP4 : Modelling the cooperation of European e-Infrastructures with non-European ones Ludek.
INFSO-RI Enabling Grids for E-sciencE Second contract amendment Collaboration Board, EGEE conference, Athens Anna Cook.
Enabling Grids for E-science in Europe INFSO Introduction to the role of NA5 in the EGEE project By Fabrizio Gagliardi EGEE Project Director.
INFSO-RI Enabling Grids for E-sciencE NA5 – Policy and International Cooperation Panagiotis Louridas, Fotis Karagiannis, GRNET Final.
INFSO-RI Enabling Grids for E-sciencE EGEE-II project proposal overview By Bob Jones EGEE Technical Director CERN.
Ian Bird GDB Meeting CERN 9 September 2003
Long-term Grid Sustainability
Preparing for EGEE-III
Health Resources and Services Administration (HRSA)
Collaboration Board Meeting
Collection and dissemination of data geo-referenced to a 1km² grid Item 3.2 of the draft agenda DSS Meeting 1 and 2 March 2018.
Peter Clarke EGEE Peter Clarke
Presentation transcript:

INFSO-RI Enabling Grids for E-sciencE Plans for the EGEE-2 EGEE 2 Task Force 3rd EGEE Conference, Athens, April 2005

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 2 Call Description Identifier: FP Infrastructures-6 Research Infrastructures – “eInfrastructure: Grid Initiatives” Publication date: May 11, 2005 Closing date: Sept. 7, 2005 Indicative Budget: € 55 Million

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 3 Chronology of Events/Meeting July 11, 2004: First ideas of EGEE phase 2 proposed to PMB. Sept. 3, 2004: Task Force appointed by PMB Members of the Task Force: Fabrizio Gagliardi (Project Director), Dieter Kranzlmueller (TF Meeting Chair), Anna Cook (Project Secretary), Fotis Karayannis, Christian Saguez, Neil Geddes, Olof Barring, Giorgio Maggi, Klaus Ullmann, Anders Ynnerman

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 4 Task Force Meetings Nov. 4, 2004: Kick-Off Conference Call Nov. 24, 2004:Nov , 2004: Face-To-Face MeetingEGEE Conf, The Hague Feb. 4, 2005: Feb. 9-11, 2005: Conference Call1st EU Review Mar. 17, 2005: Call on Related Proposals FP Infrastructures-6 Apr. 11, 2005: Conference Call Apr. 19, 2005: Apr , 2005: Face-To-Face MeetingEGEE Conf, Athens

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 5 Role and Mandate of Task Force From the PMB minutes, Sept. 3, 2004: TF should offer guidance for the planning of EGEE-2 The main tasks of the TF are to identify the boundary conditions (financial, technical, and administrative) for EGEE-2 and to advise the PMB on the setup of the editorial board (EB) for the writing of the proposal outline.

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 6 The EGEE Vision From the EGEE Proposal: “EGEE aims to integrate current national, regional and thematic Grid efforts, in order to create a seamless European Grid infrastructure for the support of the ERA.” “The EGEE vision is that this Grid infrastructure will provide European research in academia and industry with a common market of computing resource, enabling round- the-clock access to major distributed computing resources, independent of geographic location.” “EGEE is a two-year project conceived as part of a four- year programme. Major implementation milestones after two years will provide the basis for assessing subsequent objectives and funding needs.”

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 7 Project Objectives From the 1st Review Report: Assessment of objectives: “The objectives of the project are still more than relevant. The project is in the unique position to take a leading role in areas such as application-driven development of Grid middleware, geographically distributed training and induction of large and diverse user communities, policy and international cooperation development, global-scale operations of production-quality Grid infrastructure, Grid security and software development and quality assurance policies.”

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 8 Outline of Second Phase The TF recommends on a natural continuation of the project’s first phase with mostly the same partners and necessary minor adjustments on the basis of the input from the activities and especially taking into account the input from the reviewers.

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 9 Mission of EGEE EGEE 1: Large-scale deployment of the EGEE infrastructure to deliver production level Grid services EGEE 2: Extension of EGEE to a larger user community (in terms of application diversity) with approx. the same funding and duration

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 10 Boundary Conditions A broad spectrum of applications has already started in EGEE-1 and should be continued and increased towards a multidisciplinary grid infrastructure. The role of the driving (pilot) applications should be maintained. The members of the TF and the PEB discussed the general outline of the proposal containing the boundary conditions for EGEE-2. The details of specific tasks inside each activity have not yet been addressed These directions ONLY refer to programme of work and do not attempt to identify partners or level of effort required

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 11 Relation to Other Projects From the 1st EU Review: Additional activities could be spun off to other related projects EGEE should support other projects which use the EGEE infrastructure  EGEE as an incubator The actual scope of the proposal will be influenced based on decisions regarding the recently submitted related proposals (EU Calls March: 18 proposals related to EGEE) and possible future proposals (EU Calls September)

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 12 Staff Retention The TF acknowledges the following facts raised by the EU reviewers : “The project builds on excellent people” “The project personnel is found to be excellent” Reviewer recommendation: “People make the difference. Invest in staff retention immediately. Good staff retention management will be key to success” Staff retention is very important! The experts of EGEE-1 are a very valuable human resource of our project

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 13 Plan for the Future PMB leads the way to the proposal submission, coordinates the interaction between PEB, TF and EB and the input from the federations PEB continues to discuss the details and provides input on the technical aspects TF remains active in guiding the draft of the proposal EB starts working on the outline of the proposal May: First draft outline of the proposal June/July: Proposal writing August: Final administrative adjustments only September 7, 2005: Deadline for Submissions

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 14 How to Contribute? Provide your input via your national representation or federation representative to the PMB

Enabling Grids for E-sciencE INFSO-RI EGEE 2 Task Force 15 How to Contribute?