1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.

Slides:



Advertisements
Similar presentations
Positive Train Control Benefits
Advertisements

SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
1 Federal Railroad Administration Railroad Safety Advisory Committee On-Track Safety Adjacent Tracks Safety Advisory No April 27, 2004.
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
Positive Train Control Allison I. Fultz Kaplan Kirsch & Rockwell LLP Washington, DC 2010 LEGAL AFFAIRS SEMINAR February 23, 2010.
Terminal Safety. Objectives Identify main causes Outline terminal safety organization State the safe working practices.
Connected Vehicles AASHTO Annual Meeting | October 17, 2013 | Denver, CO Mike Cammisa Director, Safety Association of Global Automakers.
Satellite Notification and Acceptance Program (SNAP)
Conductor Decertification Discipline
The Federal Regulator’s Perspective Industrial Railway Safety Conference Fort Saskatchewan, Alberta April 28, 2015.
Guidelines for Traffic Control at Surface Mines
Road charging and vehicle taxation - the EU perspective
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
The Rail Safety Improvement Act of 2008 Issues For Rail Industry Contractors Kevin M. Sheys Partner K&L Gates LLP January 9, 2009.
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
ACACSO Car Service Rules 7 to 12 November 11, 2014.
M IAMI F ORT L AUDERDALE W EST P ALM B EACH O RLANDO Addresses Florida’s demand for express, intercity rail travel. Is designed to serve tourists, business.
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
Electronic Train Management System and Safety Larry Milhon March 9, 2007.
1 Development of California Regulations for the Testing and Operation of Automated Vehicles on Public Roads Steven E. Shladover, Sc.D.Ching-Yao Chan, Ph.D.
Standing Committee on Rail Transportation Oklahoma City September 22, 2009 High-Speed Passenger Rail Safety Strategy Grady Cothen Deputy Associate Administrator.
ARRC Collision Avoidance System
IntelliDrive Policy and Institutional Issues Research Valerie Briggs Team Lead, Knowledge Transfer and Policy, ITS Joint Program Office, RITA May 4, 2010.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Federal Railroad Administration's Ruling:
BEWAG (UIP) General assembly European Railway Agency Jean-Marie DECHAMPS, Head of Sector (Safety) Brussels, 27 April 2015.
Positive Train Control Labor Briefing Washington, DC December 10, 2008.
 Classes of trains  Fundamental principles of track authority  Impact of power/ton ratios  Drivers of dispatch priority 22 September 2010 SCORT/TRB.
Doc.: IEEE ptc SubmissionKevin Nichter, Lilee SystemsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
The Railroad Industry Local Operations And Future Challenges.
Office of Railroad, Pipeline & Hazardous Materials Investigations Mechanical.
Office of Railroad, Pipeline & Hazardous Materials Investigations Right-of-Way Procedures & Safety Rules Compliance.
Foreign Supplier Verification Programs Supplemental Proposal 1.
C B T M Communications Based Train Management
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
Safe Transport of Energy Products Rail Related Rulemaking Update
A Good Year for Short Lines & Regionals Dave Mears Senior Director American Short Line and Regional Railroad Association ACACSO Conference Orlando, FL.
POSITIVE TRAIN CONTROL What it is, and what it does SCORT – September 2015.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
John McBride Locomotive Engineer Kirk Thomas Conductor Kevin Mahoney Road Foreman John Pepe Rail Traffic Controller Bruce Parkin FRA.
Safety Concerns: Robotics Georgia CTAE Resource Network Curriculum Office Written by: E.L. Decker July 2009.
Positive Train Control The impact of legislative changes SCORT Chris Heald September 22, 2009.
MNM Fatal Powered Haulage Accident Powered Haulage Accident May 17, 2013 (New Mexico) May 17, 2013 (New Mexico) Underground Molybdenum Mine Underground.
Higher Speed Rail: How Soon? Key Regulatory & Transactional Issues Kevin M. Sheys
49 CFR PART 240 Qualification and Certification of Locomotive Engineers.
Hazmat HM-246 Enhancing Railroad Tank Car Safety William S. Schoonover Chief, Hazardous Materials Division Federal Railroad Administration Presentation.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
6/12/2016 FRA – Office of Railroad Safety Moving America Forward F E D E R A L R A I L R O A D A D M I N I S T R A T I O N F RA Regulatory Activity Update.
Positive Train Control Implementation of the Rail Safety Improvement Act Mandate: Elements of an Agreement?
Update & Overview. August 12, : Assessment and Action Challenges: Understand RTD’s people, practices, projects, challenges Compare with others.
ATA Technical and Maintenance Conference Paul Retter, Chief Executive and Commissioner National Transport Commission Sal Petroccitto, Chief Executive Officer.
APTA Webinar with Congressional Rail Staff– Overview of the FAST Act
Regional Road Safety Workshop
MBTA/MassDOT RAILROAD QUIET ZONES
Positive Train Control
ODOT Railroad Access & Safety
Green Line Train Protection System
University of Colorado A Line and B Line Grade Crossing Update
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
Freight Rail Policy Division
APTA Webinar with Congressional Rail Staff– Overview of the FAST Act
Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems Author: Fenggang Shi.
Status Update Jeff Gordon FRA
October 2011 doc.: IEEE ptc September 2012
<month year> doc.: IEEE < e> January 2012
<month year> doc.: IEEE ptc May 2012
Presentation to City of Palo Alto Rail Committee on Quiet Zones
System Safety Regulation
Presentation transcript:

1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011

22 Oct 16, Railroad Safety Improvement Act signed into law July 21, 2009 – FRA Published Notice of Proposed Rule Making (NPRM) Jan 15, 2010 – FRA Published Final Rule Apr 16, Deadline for Railroads to Submit PTC Implementation Plans to FRA Dec 31, Deadline for PTC Implementation Congress mandated PTC implementation by the end of 2015 FRA is drafting two new NPRMs to address railroad’s concerns

33 PTC legislation requires specific functionality PTC gauges upcoming signals, authorities, switches, operating conditions, locomotive position & speed PTC designed to warn engineer of need for action If the engineer fails to act, PTC system will engage locomotive brakes and bring train to full stop Prevent movement through misaligned switches Protect track workers Prevent train to train collisions Prevent overspeed derailments If railroaders do their jobs correctly, PTC should never engage the brakes

4 PTC is required on the following: All roads providing or hosting intercity or commuter passenger service Class I roads — Track with one or more PIH (poisonous inhalant) cars annually and — traffic greater than 5 million gross tons annually Class II and III roads — Must be equipped:  If there is passenger service on the route  in other special circumstances as described in the regulation The final footprint will be determined by the new FRA rules

Regulation requires the submission of three plans PTC Development Plan — Describes the PTC technology to be implemented PTC Implementation Plan — Describes when and where the PTC system will be implemented — How interoperability with class I’s, commuters, and short lines will be achieved PTC Safety Plan required for PTC System Certification — Describes how the safety of the system will be ensured — Contents include:  Railroad Training Plan  Operations and Maintenance Manual  Configuration and Revision Control Measures  Initial Implementation Procedures  Post Implementation Testing and Monitoring Procedures 5

66 PTC System Overview Initialization Track Database Speed Restrictions Work Zones Train Consist Movement Authorities Braking Curve Warning Curve Predictive Braking Speed Restrictions Switches Work Zones Signals

77 Interoperability Locomotive fleet age and mix Wayside plant age and mix Equipping switches in un-signaled territories Scale of changes and increase in workload Compressed timeline Unproven technology Heavy reliance on suppliers Huge capital requirements Why is PTC so challenging?

88 Class I Railroads Passenger Railroads Class Is agreed to develop standard platform PTC must be able to recognize and stop foreign locomotives PTC legislation requires industry interoperability

99 Wayside installs must be tailored to existing plant...

10... which varies from location to location...

11... including some very old equipment

12 PTC technology is still in development Onboard and office system software is still being delivered to railroad test labs — Final software will not be delivered until Sept 2011 The 220 MHz radio (required for interoperability) is still being specified — Production radios will not be available until after Jan 2012 Final wayside interface units have not been received from all suppliers — Wayside installations will start in Q2 2011

13 Delays in software delivery are compressing an already short cutover schedule 13

14 FRA places the cost benefit ratio for PTC at 22:1 PTC will prevent a small percentage of train accidents PTC will not prevent: — Track failure related accidents — Equipment failure related accidents — Grade crossing accidents “FRA recognizes that the likelihood of business benefits is uncertain and that the cost-to-benefit comparison of this rule, excluding any business benefits, is not favorable” – PTC Regulatory Impact Analysis

15 Interoperability across the United States Magnitude of wayside installations Short timeline with mandatory completion in 2015 Technology still under development Huge capital requirements PTC is challenging...

16 Questions ?