Guidance Roadmap Target Affordability and Control Cost Growth -Mandate affordability as a requirement -Implement “should cost” based management -* AT&L.

Slides:



Advertisements
Similar presentations
A 2030 framework for climate and energy policies Marten Westrup
Advertisements

Presentation for ASMC PDI 2010 June 4, 2010 Thomas Hessel Office of the Under Secretary of Defense for Personnel and Readiness Requirements and Program.
South East Europe Investment Committee Work Programme and Communication Plan for th Meeting of the South East European Investment Committee Sarajevo,
TARGET AFFORDABILITY AND CONTROL COST GROWTH David G. Ahern Portfolio Systems Acquisition Office of the Assistant Secretary of Defense (Acquisition) April.
Better Buying Power: Guidance for Obtaining Greater Efficiency and Productivity in Defense Spending.
A Navy Business Initiative Defense Daily OA Summit 12 November 2013 Nickolas H. Guertin, PE Director for Transformation DASN RDT&E
Liaison to DASN AP. The Small Business Program promotes acquisition opportunities where small business can best support the needs of our Sailors and Marines.
1 The Acquisition, Technology & Logistics Team must INNOVATE AND COLLABORATE to deliver EFFECTIVE, AFFORDABLE tools for the joint warfighter. Understand.
Continuous Process Improvement (CPI) Program Update Colonel Ric Sherman, United States Army Office of the Assistant Deputy Under Secretary of Defense for.
2-Dec-2010 I/ITSEC 2010 Briefing to Industry Tony Delicati Director of Contracts.
Brief to Defense Acquisition University Symposium Sean F. Crean
Page 1 Business Architecture – From Business Strategy to the Alignment of IT Rich Waller An Insurance Industry Case Study April 15, 2009.
National Contract Management Association How to Improve Acquisition Outcomes through the Defense Acquisition Workforce May 18, 2011.
Recommendation of Texas Test Plan Team to RMS July 17, 2003.
The Role of ECX in the Ethiopian Coffee Industry By Anteneh Assefa.
Guiding principles for the Federal acquisition system
Enterprise and Industry A better functioning food supply chain in the EU? The interplay between the food industry and the primary production. Can the right.
1 COMBAT VEHICLES SUPPORT INITIATIVE (CVSI) Industry Day Briefing Defense Supply Center Columbus 16 Oct 2007.
Best Practice Investor Relations What it takes to develop an effective Investor Relations strategy Claire Fargeot.
Shared Services Workshop Break-out Session Summaries July 7, 2015.
1 Vicki Cutcliffe Chief 2012 Bureau of Law Enforcement.
1102 Contract Specialist as a Business Manager Debbie Bartlett Defense Acquisition University.
LONG TERM STRATEGIC PLANNING January STRATEGIC INITIATIVES 1. Approach Food Safety as an imperative. 2. Develop and maintain Operational Standards.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Mr. Ric Sylvester Deputy Director, Acquisition Workforce and Career Management Defense Procurement and Acquisition Policy; OUSD(AT&L) Human Capital Strategic.
2015 Safety Action Plan & Regulatory Strategy California Public Utilities Commission January 29, 2015.
MEMORANDUM TO: The Defense Industrial Base FROM: Brett B. Lambert, Director, Industrial Policy July 13, 2010 “The Department is committed to working with.
0 Achieving Dominant Capabilities through Technical Excellence and Innovation Better Buying Power 3.0.
Stuart A. Hazlett Deputy Director, OUSD(AT&L) Defense Pricing Defense Procurement and Acquisition Policy A Presentation to NCMA Pentagon 8 September 2011.
IRIS - International Railway Industry Standard The Quality Standard for the Railway Industry ACRI Prague, 2nd April 2008 Angela de Heymer Manager Quality.
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
ARA Conference March 28, 2012 | 1DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 27 March SR case # 12-S-1515 applies Nicholas.
International Harmonization of Cooperative Systems Standards and the IntelliDrive SM Program ITS-JPO Standards Program Update Brian Cronin Team Leader,
DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 11 April 2011; SR Case # 11-S-2072 applies 1 Mr. Skip Hawthorne OUSD(AT&L) DPAP/CCAP Reducing.
R 0 G125 B 177 R 78 G 47 B 145 R 185 G 50 B 147 R 245 G132 B 107 R 255 G234 B 83 R 123 G193 B 67 R149 G169 B 202 Introduction to Performance Management.
Product Support Assessment Team (PSAT) Tom Simcik Performance Learning Director – Acquisition Logistics LCL FIPT 14 Nov 08.
0 17 Nov 2010, V2.1 Bill Parker Director for Acquisition & Program management Better Buying Power: Guidance for Obtaining Greater Efficiency and Productivity.
D R A F T Senior Steering Committee (SSC) Briefing CPI Baseline Assessment and DoD CPI/LSS Program Office Standup 18 May 2007.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
HEALTH WORKFORCE HEALTH SYSTEM TRANSFORMATION Oklahoma State Innovation Model.
1 NASA Office of Procurement NASA Procurement Tenets April 15, 2008 SMC Brief Bill McNally Assistant Administrator for Procurement.
NSDI Strategic Plan Update January 14, NSDI Strategic Plan High-level Timeline 2 Timeframe Activity Dec - Feb Project Start-up – COMPLETED Feb -
Diploma Implementation Advisory Task Force September 26, 2006.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
UID Program Plans.  Template Released after last JACG 14 October  Comments Rec’d from the Air Force and the Army Plans need to address: Cost, schedule.
Hot Topics 18 March 2016 DoD Instruction : Defense Acquisition of Services 1.
Freight Forum RTC Washoe March 31 st, The reliable, cost effective, and safe movement of goods and products across the State of Nevada and.
Open Architecture Business Innovation Initiative (OA-BII) Nick Guertin Director for Transformation DASN RDT&E 20 September 2012.
BBP Mar 13 Better Buying Power 2.0 Achieve Affordable Programs Mandate affordability as a requirement Institute a system of investment planning to derive.
Senior Steering Committee (SSC) Briefing
NATIONAL e-STRATEGY Presentation to the Portfolio Committee on Telecommunications & Postal Services DG: ROBERT NKUNA AUGUST 2017 Building a better life.
Commercial Item Acquisitions: A Brief Update
Defense industry Adjustment and Economic Development U. S
[Product Name] Marketing Plan
MEMORANDUM FOR ACQUISITION PROFESSIONALS
Better Buying Power 3.0 Continue Strengthening Our Culture of:
Changing Landscape…… What was once performed by uniformed military may now be provided by contractors Contractors perform vital services in support of.
9/18/2018 8:07 PM Leadership, Productivity and Value Musings from forty years of experiences in the Defense Industry, OSD and the Navy … including some.
Professional & Scientific Council Update
Getting to an Inclusive, Regional Economic Development Strategy
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Industrial Base Analysis and Sustainment (IBAS) Program Overview
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Port Back Data Collection & Transition
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Updating the National Vaccine Plan: A roadmap for the next decade A National, not Federal, Plan December 11, 2009.
Presentation transcript:

Guidance Roadmap Target Affordability and Control Cost Growth -Mandate affordability as a requirement -Implement “should cost” based management -* AT&L memo 24 Aug 2011 – Should –Cost and Affordability * AT&L memo 22 Apr 2011 – Will Cost/Should Cost * USA SAAL_ZR memo 10 June – Army Implementation of USD (AT&L Affordability Initiatives * USAF memo 15 June 2011 – Implementation of Will-Cost and Should Cost Management * SECNAV ASN-RDA memo 19 July2011 – Implementation of Should Cost Management -Eliminate redundancy within warfighter portfolios -Achieve Stable and economical production rates -Manage program timelines Incentivize Productivity & Innovation in Industry -Reward contractors for successful supply chain and indirect expense management -Increase Use of FPIF contract type -Capitalize on progress payment structures * DPAP memo 27 April 2011 – Cash Flow Models -Institute a superior supplier incentive program -Reinvigorate industry’s independent research and development Updated 16 Sept 2011 Promote Real Competition -Emphasize competitive strategy at each program milestone -Remove obstacles to competition Allow reasonable time to bid *DPAP memo 27 April 2011/24 Nov 2010 –Improving Competition Require non-certified cost and pricing data on single offers Enforce open system architectures and set rules for acquisition of technical data rights -Increase small business role and opportunities *DPAP memo 14 Jul y 2011 Use Government –wide Acquisition Contracts Set Aside Exclusively for Small Business *DPAP memo 27 June 2011 Increase Dynamic Business Roles in the Defense Marketplace Improve Tradecraft in Acquisition of Services -Assign senior managers for acquisition of services *Senior Manager’s appointed by SAEs (Dec 2010/Jan 2011) -Adopt uniform services market segmentation (taxonomy) * DPAP memo 23 Nov 2010 – Taxonomy for Acquisition of Services -Address causes of poor tradecraft Define requirements and prevent creep Conduct market research -Increase small business participation * DPAP memo 14 Jul y 2011 Use Government –wide Acquisition Contracts Set Aside Exclusively for Small Business Reduce Non-Productive Processes and Bureaucracy *PDUSD AT&L memo 14 Sept 2011 – Document Streamlining-Life-cycle Sustainment Plan * PDUSD AT&L memo 18 July 2011 – Document Streamlining-Program Protection Plan * PDUSD AT&L memo 23 June 2011 – Improving Milestone Process Effectiveness * PDUSD AT&L memo 20 April 2011 – Document Streamlining-Program Strategies and SEP -Reduce frequency of OSD level reviews * AT&L memo 11 May 2011 – Improving Technology Readiness Assessment Effectiveness -Work with Congress to eliminate low value added statutory requirements -Reduce the volume and cost of Congressional Reports -Reduce non-value added requirements imposed on industry -Align DCMA and DCAA processes to ensure work is complementary * DPAP memo 4 Jan 2010 – Align DCMA and DCAA -Increase use of Forward Pricing Rate Recommendations (FPRRs) to reduce administrative costs * DPAP memo 4 Jan 2010 – Align DCMA and DCAA Related Memos/DTMs: PDUSD AT&L memo 19 July 2011– Roles & Responsibilities of the OSD OIPT Leaders, Teams and Team members AT&L memo 23 June2011– DTM – Acquisition Policy for Defense Business Systems AT&L memo 21 March 2011– DTM – Reliability Analysis, Planning, Tracking and Reporting PDUSD AT&L memo 24 Feb 2011– Expected Business Practice: Post Critical Design Review Reports and Assessments OMB memo 2 Feb 2011 – “Myth Busting”; Addressing Misconceptions to Improve Communications with Industry during the Acquisition Process