1.Messaging (Update) 2.ATDM Screening and Methodology Walkthrough 1.Primary 2.Secondary 3.Tertiary 3.Policy Issues for consideration 4.Next Steps 5.Questions.

Slides:



Advertisements
Similar presentations
Overview of a Timely Publication. Transportations importance has been recognized since colonial times National defense Economic vitality Quality of life.
Advertisements

General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Getting Started with Congestion Pricing A Workshop for Local Partners Federal Highway Administration Office of Operations.
I-80 Corridor System Management Plan Alameda County Transportation Commission ACTAC Meeting September 7, 2010.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
EX-1 Intersections & Interchanges Improved Traffic Signal Control Ramp metering Intersection Collision Avoidance Systems Automated Enforcement.
Inter Urban ITS ITS on the Trunk Road Network November 2006.
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
TRB Lianyu Chu *, K S Nesamani +, Hamed Benouar* Priority Based High Occupancy Vehicle Lanes Operation * California Center for Innovative Transportation.
Evaluation and Application of Active Traffic and Demand Management (ATDM) Strategies, including Managed Lanes for Urban Corridors in Ohio Naveen Juvva.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Jeffrey F. Paniati Executive Director Federal Highway Administration US Department of Transportation Washington, DC Reducing Congestion Tools of.
SafeZone Martin Baker Road Safety Team Leader Poole Borough Council Kevin Jones UK Product Sales Manager Siemens.
Operations in the 21st Century DOT Meeting Customers Needs and Expectations 1.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
ITS Sketch Planning Tool Webinar 2:00 – 4:00 PM January 8, 2009.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
Active Traffic Management: The Next Step in Congestion Management NTOC Webinar Presented by Jessie Yung, P.E. Office of Transportation Management April.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
Meeting Customers Needs And Expectations Operations in the 21 st Century DOT.
1 IntelliDrive SM Research, Development and Emerging Technologies National ITS Perspective Panel Joseph I. Peters, Ph.D. Federal Highway Administration.
Transportation leadership you can trust. presented to FHWA “Talking Freight” Seminar Series presented by Lance Neumann Cambridge Systematics, Inc. August.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
0 Christopher A. Pangilinan, P.E. Special Assistant to the Deputy Administrator Research and Innovative Technology Administration, ITS Joint Program Office.
November 15, 2005 Dr. Robert Bertini Dr. Sue Ahn Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Engaging State DOT’s Engaging State DOT’s 2008 ITS America State Chapters Council Annual Meeting and State Chapters Strengthening Workshop Bernie Arseneau,
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Mn/DOT Metro District 20- Year Highway Investment Plan Update: (Adopted: December 21, 2011) FHWA and Georgia Operations Summit and Planning for.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
Brian Kary Minnesota Department of Transportation.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Analysis of the IH 35 Corridor Through the Austin Metropolitan Area TRB Planning Applications Conference Jeff Shelton Karen Lorenzini Alex Valdez Tom Williams.
Analyzing the Mobility Impacts of TOD Level of Service in Transit Oriented Districts Service for Who?
Influencing Travel Behaviour Graham Riley Regional Programme Manager North of England Slide 1.
Centre for Transport Studies Imperial College 1 Congestion Mitigation Strategies: Which Produces the Most Environmental Benefit and/or the Least Environmental.
Operations in the 21 st Century DOT Meeting Customers Needs And Expectations.
A case–driven comparison of Freeway Performance Measurement Systems by Shailesh Deshpande.
Transportation Systems Management and Operations: Why It Matters Presenter Name Date AGENCY LOGO Photo: © Shutterstock.com/iofoto ( )
2007 Urban Mobility Report Principal Speaking Points.
1 National Governors Association Roundtable Presentation April 2, 2001 Dr. Christine Johnson Director, ITS Joint Program Office Program Manager, FHWA Operations.
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
Garden State Parkway HOT Lanes By Matt Lawson October 14, 2010.
ATDM Analytical Methods for Urban Streets Urban Streets Subcommittee Meeting January 10, 2016 David Hale.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Monica Bansal Department of Transportation Planning Presentation to the TPB CAC November 13, 2008 Progress on “CLRP Aspirations” & “What Would it Take?”
EasyWay - conclusion.
Chelan County Transportation Element Update
MODULE 2: TSMO Strategies
HERO UNIT Training Module
MODULE 2: TSMO Strategies
Presentation transcript:

1.Messaging (Update) 2.ATDM Screening and Methodology Walkthrough 1.Primary 2.Secondary 3.Tertiary 3.Policy Issues for consideration 4.Next Steps 5.Questions Agenda

Overarching Message Congestion can stifle Ohio’s economy and ruin your day. ODOT is looking at creative solutions to reduce traffic delays and improve safety. Recent studies show that congestion costs Ohio more than $3 billion a year. It is critical that we get people to work on time and that truckers and other commercial delivery drivers can travel our state efficiently via our road network. This is why ODOT is exploring Active Traffic and Demand Management (ATDM) strategies. These strategies may include managed lane techniques such as using shoulders to carry traffic during peak periods, displaying variable speed limits to keep vehicles moving through congestion and adding traffic signals to freeway entrance ramps (ramp metering). ATDM strategies have successfully increased travel time reliability on roads in other states. ODOT is currently evaluating where in Ohio active traffic and demand management strategies may be applicable, if at all, to benefit motorists, truckers, and the economy in a time of tight budgets.

ResourcesSource Capacity addition and/or resurfacingODOT TRAC/Transportation Plan From INRIX Bottleneck Report for OhioODOT Congestion and Safety Lists and DatabasesODOT Travel Time Reliability Index from ODOT - Top 10 per regionODOT Inside or outside shoulder widthODOT Basic Road Inventory Time savings to be worth the change in behavior or costModeling Commuting trips are longer rather than shorterModeling Relatively high percentage of through tripsModeling TIMS Right-of-way, Volumes, Speed, etc.ODOT Public support appears likelySurveys, Reports, Prior Project Public Meetings, News Papers, Ratio of travel time in peak period/travel time in free-flow2012 TTI Mobility Report by region Existing/Under Constr/Planned Managed Lanes/HOT LanesFHWA

The activity during the secondary screening will involve use of the ODOT model to quantify the benchmarks previously described. The modeling phase will look at the interplay between benchmarks, to explore how separate projects in the same area may affect each other, Competitively (i.e., their interplay may depress their efficacy, according to the criteria used) Cooperatively (i.e., their interplay may lead to further improvement of their efficacy, according to the criterion used)

Hard Shoulder Running Contra Flow Lanes High Occupancy Vehicle Lanes Bus Only Lanes Priced Lanes TMC Improvements Incident Response Integrated Corridor Management Truck Only Lanes Speed Harmonization Dynamic Message Signs providing real-time traffic information Dynamic Route Planning Ramp Metering Dynamic Lane Assignment Queue Warning

Develop a Preliminary B/C ratio Sketch level costs (and cost offsets) Traditional monetized benefits Traditional benefits may include (based on travel demand model outputs) Travel time savings (truck/auto) Travel time reliability (truck/auto) Emissions (reduced truck/auto VMT) Travel cost savings (reduced truck/auto VMT) Safety (reduced truck/auto VMT; crash reduction/increase with ATM/TDM) Identify opportunities for other benefits Qualitative More advanced monetized benefits (e.g. productivity/agglomeration gains, investments avoided, inventory savings)

Dynamically manage recurrent and non- recurrent congestion Maximize effectiveness / efficiency Increase throughput and safety Integrated systems with new technology Automated dynamic deployment

Individual Lanes Dedicated Shoulder Lanes Dynamic Shoulder Lanes All Traffic HOV Dynamic Shoulder Lanes Priced Dynamic Shoulder Lanes Junction Control All Lanes Speed Harmonization Queue Warning Dynamic Re-routing

● Congestion is an imbalance between ● Supply (highway lanes) ● Demand (highway travel) Equilibrium where Supply and Demand are in balance Equilibrium where Supply and Demand are in balance

● Congestion is an imbalance between ● Supply (highway lanes) ● Demand (highway travel) ● Unlimited demand yields overconsumption of supply ● Demand limited by fuel consumption, not location and time of use ● Outcome is economic scarcity

Limited Capacity Limited Capacity Unlimited Demand Unlimited Demand Increase Capacity Increase Capacity Reduce Demand Reduce Demand Manage Access Manage Access 3 Options for Dealing with Scarcity

Practice shows congestion relief is temporary Does not fix the fundamental imbalance Cost to widen existing highways very expensive Build More Lanes Combination of rationing and trip avoidance Requires viable alternatives to travel Potentially impedes economic productivity Reduce Demand Does not accommodate significant travel growth Shifts economic burden to travelers Manage Existing Lanes

Application Expands capacity Shifts demand Meters traffic Outcome Restored travel speeds Improved safety Travel time reliability Long term Return on Investment

Land Use Employment

Corridor Performance Average throughput increase: 3 - 7% Overall capacity increase: % Decrease in primary accidents: % Decrease in secondary accidents: 40 – 50% System Use Benefits Overall smoothing of speeds during congestion Decreased headways and more uniform driver behavior Increase in trip reliability Delays the onset of freeway breakdown.

Typical uses: Add general purpose capacity (most) Add HOV capacity Limited use for auxiliary lanes, merge zones, lane balancing, uniform lane widths Most prominent in… California Texas Virginia Washington

Typical Segment Dedicated SL Segment

I-35, Minneapolis, Minnesota

Implemented with speed harmonization Lane control signals for use of shoulder Refuge areas and call boxes also available Germany

Combines HOT Lane with Dynamic Shoulder Lanes Adapts to traffic via multiple operational conditions Germany

Applied at entrance ramps or merge points Main lane closed to provide priority to entering traffic

Delays onset of stop-and-go conditions Monitors conditions and deploys speed changes Reduces number of collisions

Complements existing DMS for incident management and travel time information Oriented towards informing of upcoming queues

Dynamic message signs Rotational prism signs Partnerships with information providers

Dynamic guidance signage

Top 12 ATDM Policies

12. ATDM strategies shall be selected and prioritized based on a structured and ODOT approved methodology. 11. ATDM strategies shall be considered as a component of selected corridor improvement projects as part of the NEPA process. 10. ATDM strategies shall consider improving the reliability of transit operations and freight movement as well as vehicular traffic.  to 52

9. ATDM strategies shall support broader level ITS policies in terms of consistent incident, emergency and weather management systems. 8. The ODOT TMC shall be reconfigured to monitor and control ATDM technologies along selected corridors throughout the state. 7. ATDM strategies shall provide system connectivity with other modes and adjacent signal systems.  to 53

6. Managed lanes shall maintain a minimum travel speed of 50 mph for 90 percent of the time over a consecutive six-month duration during weekday peak periods. 5. ATDM strategies shall promote the improvement of person throughput within selected corridors throughout the state. 4. ATDM strategies shall reduce the probability of primary and secondary crashes within selected corridors throughout the state. 54

3. ATDM strategies shall reduce traveler delays within selected corridors throughout the state. 2. ATDM strategies shall develop, monitor and report performance measures to gauge their effectiveness. 1. ATDM projects shall require development of a Concept of Operations, inclusive of realistic O&M budgets with funding commitments. 55