April 4 & April 11, 2007 1 Reliability Standards Compliance April, 2007 Steve Wallace.

Slides:



Advertisements
Similar presentations
Reliability in the International Arena Alberta Perspective
Advertisements

2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
WECC Interchange Authority Michelle Mizumori Joint Guidance Committee May 5-6, 2009.
CIP Cyber Security – Security Management Controls
COM Operating Personnel Communications Protocols
Gcpud1 CRITICAL INFRASTRUCTURE PROTECTION NERC 1200 CIP CRITICAL INFRASTRUCTURE PROTECTION NERC 1200 CIP
Configuration Management Managing Change. Points to Ponder Which is more important?  stability  progress Why is change potentially dangerous?
NERC Functional Model AND HOW IT RELATES TO THE ERCOT REGION
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
Pertemuan 5-6 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
First Practice - Information Security Management System Implementation and ISO Certification.
Date Texas RE Board Update to TAC November 5, 2009 Susan Vincent Director, Legal Affairs.
Software Configuration Management
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Conducting the IT Audit
Mandatory Reliability Rules Implementing the Electric Reliability Organization David W. Hilt Vice President & Director of Compliance APPA Reliability Symposium.
1 FRCC Compliance Organization and Entity Registration 2008 FRCC Compliance Workshop.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
1 Texas Regional Entity Report December Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial.
An EDI Testing Strategy Rosemary B. Abell Director, National HIPAA Practice Keane, Inc. HIPAA Summit IV April 24-26, 2002.
Texas Regional Entity Compliance Report TAC July 9, 2009.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
Software Quality Assurance Lecture #2 By: Faraz Ahmed.
NERC Compliance Program Overview FRCC 2007 Compliance Workshop April 4 and 11, 2007.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Compliance Monitoring and Enforcement Audit Program Background Information.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
How To Build a Testing Project 1 Onyx Gabriel Rodriguez.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
April 14, A Watershed Date in HIPAA Privacy Compliance: Where Should You Be in HIPAA Security Compliance and How to Get There… John Parmigiani National.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Building Capability.  In order to successfully operate an architecture function within an enterprise, it is necessary to put in place appropriate organization.
Overview of WECC and Regulatory Structure
Software Project Management
Status Report for Critical Infrastructure Protection Advisory Group
“NERC Hot Topics” Marc Butts May 9, 2008 Marc Butts May 9, 2008.
CMM Level 2: Repeatable Copyright, 2000 © Jerzy R. Nawrocki Quality Management.
International Symposium on the changing role of Parliament in the budget process: Experiences from PUIC Countries and EU Member States Cooperation between.
PUBLIC POWER UTILITIES IN IDAHO Presented to Legislative Generation Sub-Committee by Idaho Energy Authority (IDEA) and Idaho Consumer Owned Utilities Association.
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
Project – Alignment of Terms WECC Joint Meeting July 15, 2015.
Standing Up The New Electric Reliability Organization Ellen P. Vancko North American Electric Reliability Council.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Chapter 3 Audit Planning, Types of Audit Tests, and Materiality McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Congestion Management in a Market Environment David Nevius Senior Vice President North American Electric Reliability Council.
Standards Review Subcommittee Update August 17, 2010.
Texas Regional Entity Report Mark Henry June 6, 2008.
Electric Reliability Organization and Issues in Texas Technical Advisory Committee January 4, 2006 Jess Totten Director, Electric Industry Oversight Division.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
Date Meeting Title (optional) Texas Reliability Entity Update Don Jones Manager, Reliability Standards.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Copyright © 2007 Pearson Education Canada 9-1 Chapter 9: Internal Controls and Control Risk.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #4 June 18 – July 15.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
The Electric Reliability Organization NERC’s Proposal for a Strong and Effective ERO FRCC System Operator Seminar Spring 2006.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
WECC-0118 Removal of Interchange Authority
The Electric Reliability Organization: Getting from here to there.
Standard Review Subcommittee Update
Overview of WECC and Regulatory Structure
Financial Control Measures
Presentation transcript:

April 4 & April 11, Reliability Standards Compliance April, 2007 Steve Wallace

April 4 & April 11, About Seminole Electric Cooperative Generation & Transmission Cooperative – Wholesale All-Requirements Power Provider for 10 Member Rural Electric Distribution Cooperatives “Joint Registration Organization” Member Systems – Member-Consumer Owned – Independently Managed and Operated Central Florida Electric Cooperative Clay Electric Cooperative Glades Electric Cooperative Lee County Electric Cooperative Peace River Electric Cooperative Sumter County Electric Cooperative Suwannee Valley Electric Cooperative Talquin Electric Cooperative Tri-County Electric Cooperative Withlacoochee River Electric Cooperative

April 4 & April 11, Seminole Functions Planning Authority Balancing Auth. Resource Planner Trans. Operator Interchange Authority Trans. Planner Trans. Svc. Provider Trans. Owner Generator Operator Generator Owner Purchasing-Selling Entity LSE Distribution Provider

April 4 & April 11, ERO Reliability Standards Compliance Program Past / Present – Primarily System Operations – Transmission Services Currently Assessing Organization Needs – Seminole Individually As “JRO” Including Member Role

April 4 & April 11, Reliability Compliance Program Preliminary Assessment Seminole – Designated ERO Compliance Program Manager Required – ERO Compliance Management System / Software Needed Responsibility Assignment / Accountability Compliance Status Tracking Audit Trail (documentation, documentation, and more documentation) Audit Preparation – All ERO Standards, 3 Year(?) cycle – Member Agreements Needed For Auditable Seminole Compliance – Formal Compliance Plan Needed For Each Standard Membership Role – Uncertain Standards Applicability – Still Identifying Member Expectations / Scope – Comprehensive Delegation Agreement Required Scope (Exactly who does what) Responsibilities Mutually Acceptable Liability Accountability – Seminole Organization Impact

April 4 & April 11, Formal ERO Compliance Program Implementation May, Detailed Implementation Plan July, Membership Role / Agreement August, 2007 Resource / cost Identification 2008 – Organization – Resource / Tool Acquisition – Formal Program Operational

April 4 & April 11, Questions???