GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7 April Status 04-27-04 Gunther.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller Elex Overview-Management V6 1 GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S September Status
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller Elex System Engineering V7 1 GLAST Large Area Telescope: Electronics,
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller Monitoring V6 1 GLAST Large Area Telescope: Electronics, Data.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectOct DAQ & FSWV3 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Analysis of cPCI Backplane.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 2, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 1, Version 3 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, DAQ & FSWV8 1 GLAST Large Area Telescope: Gunther Haller SLAC LAT Chief Electronics.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 6 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 3, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectPDU/GASU MRR, February 4, DAQ & FSWV3 1 GLAST Large Area Telescope: B. Estey, G. Haller, D. Marsh SLAC
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller Electronics V5 1 GLAST Large Area Telescope: Electronics, Data.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project4.1.7 G. Haller V31 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectGLAST Flight Software, 7 February 2003 FSW Development Plan 1 GLAST Large Area Telescope: Instrument Flight Software Development Plan.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: Gunther Haller SLAC (650)
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope:
EPU load – same as SIU load except…
GLAST Large Area Telescope: I & T Peer Review EGSE/Online System
GLAST Large Area Telescope:
GLAST Large Area Telescope: TEM/TPS MRR
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther Haller, JJ Russell (650) Gamma-ray Large Area Space Telescope

GLAST LAT Project4.1.7 G. Haller V2 2 Last Month’s Accomplishment, PDU Function of Power Distribution Unit –Switches power to TEM’s, GASU, EPU crates –Digitizes temperatures to be used for thermal control Accomplishment/Status –Fabricated updated PDU board with flight foot-prints –Loaded 2 boards –Assembled new box with those two boards (primary & redundant) –In test, will replace previous version in testbed –Testbox: assembled test boards (simulated loads, sensors, etc) –Updating flight parts-list and need to order some more components (some resistor and capacitor values have changed) Concern –no technical concern, schedule looks ok, driven by need for test- bed and ISIS delivery, not LAT flight hardware delivery

GLAST LAT Project4.1.7 G. Haller V2 3 Last Month’s Accomplishment, GASU Function: –global trigger, event builder, command-response unit, ACD control/monitoring/data-readout Accomplishment/Status: –Completed update of schematic having flight foot-prints and one- time programmable FPGA’s (previous version had JTEG programmable FPGAs) –Completed layout, fabricated 4 boards –Loaded 1 board, debugged board –Loaded 3 more boards –2 board were assembled into GASU enclosure –In test Concern: –Schedule, not for flight, but for test-bed, ISIS, and ACD EGSE test- setup delivery –Need to investigate failure in G3 -> see EGSE

GLAST LAT Project4.1.7 G. Haller V2 4 Last Month’s Accomplishment, GASU Power Supply Function: Generate power for GASU DAQ board and ACD front- end electronics from 28V Accomplishment/Status –No news –Need to make more boards for EGSE GASU’s Concern: none

GLAST LAT Project4.1.7 G. Haller V2 5 Last Month’s Accomplishment, TEM Function of Tower Electronics Module –control/readout/monitoring of TKR and CAL sub-system Accomplishements/Status: No change in board Working on performance test/thermal cycle/vibration/TV test procedure documents Concern: Schedule for flight: –Enclosure contract awarded –PCB fab contract awarded –Assembly contract in RFP stage –4 capacitors were apparently not ordered (were stuck in purchasing). 10 weeks delivery, is problem for qual unit availability (for testing).

GLAST LAT Project4.1.7 G. Haller V2 6 Last Month’s Accomplishment, DAQ ASICs TEM Tracker Cable Controller ASIC (GTCC1) TEM Calorimeter Cable Controller ASIC (GCCC1) GLAST LVDS Translator Chip ASIC (GLTC2) Accomplishment/Status –Burn-in Boards for screening fabricated, are in test –Software for screening performance test in progress Concern: flaw might be detected while more testing is going on

GLAST LAT Project4.1.7 G. Haller V2 7 Last Month’s Accomplishment, TPS Function of Tower Power Supply –Supply voltages to TKR, CAL sub-system and to TEM from 28V Accomplishment/Status: One resistor value was changed (3 weeks delivery) Working on performance test/thermal cycle/vibration/TV test procedure documents Concern: Schedule for flight: –RFP’s out for fab and assembly –Same caps as on TEM: 4 capacitors were apparently not ordered (were stuck in purchasing). 10 weeks delivery, is problem for qual unit availability (for testing).

GLAST LAT Project4.1.7 G. Haller V2 8 Last Month’s Accomplishment, SIU/EPU (1) EPU and SIU cCPI crate the same except –RAD750 boot code different –Storage Interface Card loaded different –Status combined cCPI crate contains –Enclosure –Backplane –Lat Communication Board (LCB) –Storage Interface Board (SIB) –Crate Power Supply Board (CPS)

GLAST LAT Project4.1.7 G. Haller V2 9 Last Month’s Accomplishment, SIU/EPU (2) Enclosure (cPCI crate) –Received two additional crates (will be used for test-bed) Custom Backplane –No change LCB (Control/event interface from processor to LAT) & SIB (Storage Interface Board, MIL1553 interface to Spacecraft, EEPROM storage for code, control circuit for VCHP heaters) –Fabriated more boards (for test bed use) –Need more documentation

GLAST LAT Project4.1.7 G. Haller V2 10 Last Month’s Accomplishment, SIU/EPU (3) CPS (Generate crate supplies (5V/3.3V) from 28V –Debugged module, tested with backplane and LCB, all ok –No news CPU –BAE 750 boards boots in crate –Need more boards for test-bed, trying to order but BAE is still working on deciding what bus-bridge to provide.

GLAST LAT Project4.1.7 G. Haller V2 11 Last Month’s Accomplishment, Misc Point-to-point cables (“Harness”) –DAQ cables to ACD were approved –All other drawings are still out being reviewed Heater Control Box –No news, still have first prototype to be tested

GLAST LAT Project4.1.7 G. Haller V2 12 Last Month’s Accomplishment, Simulator Function of Front-End Simulator (FES) –Simulates TKR and/or Calorimeter front-end electronics on test-bed, connects to TEM like subsystem and to PC (later for downloading data-patterns) Accomplishment/Status –Fabricated, loaded, and tested 45 boards –Mounted on test-bed –Connect on test-bed incrementally with installed TEM’s (as available)

GLAST LAT Project4.1.7 G. Haller V2 13 Last Month’s Accomplishment, EGSE Function: –Provides test-setups for CAL, TKR, DAQ HW & SW effort Accomplishments/Status: –Had shipped 1 test-stand to TKR (UCSC), 1 test-stand to CAL (NRL) –Since no complaints: shipped two test-stands to TKR (Italy), will ship two CAL to NRL next week. Should CAL test-stands include flight ARF461 common mode filter for EMI test purposes? Need to decide this week.

GLAST LAT Project4.1.7 G. Haller V2 14 EGSE (2) Shipped G3 test-stand to ACD (GSFC) with several software people –Connected primary GASU to BEA, all worked –Connected redundant GASU to BEA, all worked –Ran available ACD scripts

GLAST LAT Project4.1.7 G. Haller V2 15 EGSE (3) Problem when connecting BEA to prime and redundant simultaneously Apparently drew more current than expected (and measured at SLAC). There are guesses that something was damaged in shipping, but we don’t go for that yet. Some experiments were done to investigate why there is more current –Connect primary GASU to BEA via standard cable, connected redundant GASU to BEA using break-out box. Only connected one pin, 28V (used for HV), on break-out box. That broke redundant GASU. Guess is that power- switch on GASU smoked and something got damaged. However that can/should only happen if power is shorted, but does not look like it was, so mystery for now. –Decided to stop debugging redundant GASU at GSFC since we did not want to risk primary GASU (GASU engineer is at SLAC) –Much more important to have primary GASU working with BEA so that all the test-scripts/software can be written and tested –Only part which can not be tested for now is fail-over Plan to replace/fix GASU in the next 2 weeks Best is to ship new generation of GASU in 2 weeks, get old back later to investigate occurrence.

GLAST LAT Project4.1.7 G. Haller V2 16

GLAST LAT Project4.1.7 G. Haller V2 17 Schedule/Budget Total budget: $20,443 Work Scheduled up to date: $13,168 Work Performed: $12,606 Actuals: $12,794 Schedule Variance $561k (ahead) –A few flight parts came in earlier than expected Cost Variance: -$188k (over budget) –Change requests submitted, not approved yet (amount of CR’s is higher since cost variance is higher than it appears due to flight parts which were delivered & credit taken but not paid yet).