LAT ISOCISOC Review, 15 February 2006 1 GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.

Slides:



Advertisements
Similar presentations
Operations Testing in the ISOC Service Challenges are a successor and extension to the successful Data Challenge model Broader set of objectives Continue.
Advertisements

GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 71 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Instrument Science.
GLAST LAT Project I&T Weekly Meeting 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope Procedure Format Lori Bator LAT ISOC Chief Engineer.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ISOCMonthly Status Review - ISOC, 1 August GLAST Large Area Telescope Instrument Science Operations Center Monthly Status Review 1 August.
GLAST LAT ProjectLAT Operations Planning, 23 March GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT ISOCMonthly Status Review - ISOC, 2 May GLAST Large Area Telescope Instrument Science Operations Center Monthly Status Review 2 May 2007.
GLAST Large Area Telescope ISOC Review 15 February 2006 FSW Activities, Organization, and Resource Needs Jana Thayer Stanford Linear Accelerator Center.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
RFA 18 – Automation of Operations Software Specific Request –Specify plans and requirements for automation of operations software, and describe the software.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ISOCMonthly Status Review - ISOC, 6 June GLAST Large Area Telescope Instrument Science Operations Center Monthly Status Review 6 June.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
LAT ISOCDOE Status Review, 12 Oct GLAST Large Area Telescope LAT Instrument Science Operations Center Rob Cameron Stanford Linear Accelerator Center.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 NRL-SLAC Networking LAT Environmental.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center ISOC Staffing and Costs Rob Cameron Stanford Linear.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Introduction to GLAST and the LAT ISOC Rob Cameron.
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
1 Getting Involved with GLAST Workshop, CFA, 06/21/ C. Shrader, NASA/GSFC GLAST Data & Software Release plans + Science Support Center Services C.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
GLAST LAT ProjectIDT Face-to-Face Agenda S. Williams 1 Face to Face Meeting Session Topic: LAT Operating Modes Date: March 19 Time: 13:30 Convener: Scott.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 51 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
I&T&C Organization Chart
GLAST Large Area Telescope:
Current SOC-Ground System Integration Schedule (Jan )
GLAST Large Area Telescope
GLAST Large Area Telescope:
RFA 8 – Command & Control System Definition
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
Launch and On-orbit Checkout
LAT Operations Scenario Subsystem Meetings
GLAST Large Area Telescope
Integration and Test Organization Chart
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
Presentation transcript:

LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford Linear Accelerator Center ISOC Manager Gamma-ray Large Area Space Telescope

LAT ISOCISOC Review, 15 February Outline  Overview of CHS  GLAST ground system test support  Development activities  CHS software releases  Operating Procedure Development  Operations Networks and Security  CHS resource requirements –Staffing –Operations Facility –M&S

LAT ISOCISOC Review, 15 February Commanding, Health and Safety  The Commanding, Health and Safety (CHS) team is responsible for: –LAT mission planning support –generation and validation of LAT commands –passing LAT commands to the GSSC –verifying commands were correctly executed –receiving Level 0 data from the MOC –logging and archiving of all commands and Level 0 data –monitoring the health and safety of the instrument –continuous knowledge of the configuration of the LAT

LAT ISOCISOC Review, 15 February CHS Activities - Breakdown

LAT ISOCISOC Review, 15 February GLAST Ground System Test Support  Participation in 5 Ground Readiness Tests –Test of Individual interfaces and products between GS elements –June 2005 – Dec 2006 –2 GRTs successfully completed to date  Participation in 6 End-to-End Tests –Complete GS system exercises with GLAST Observatory –Dec 2006 – Aug 2007  Mission Simulations –Team training using Observatory+Instrument simulators –Start in Sept 2006

LAT ISOCISOC Review, 15 February Simulation and Mission Test Schedule RF Compat Test #2 11/29-12/4 ETE Test #2 3/6-7 ETE Test #5 7/1-2 ETE Test #4 6/8-11 ETE Test #3 5/9-11 ETE Test #6 8/11-12 ETE Test #1 12/4-5/06 RF Compat Test #1 9/20-28

LAT ISOCISOC Review, 15 February CHS Development Activities  CHS Software development tied to GS testing schedule –Software release schedule driven by GRT and ETE schedule  ISOC Operations Data Products tested/debugged during GRTs  LAT Operating Procedures –NASA requires Narrative Procedures in prescribed format –66 NPs identified to date –ISOC/CHS is working with NASA Instrument Operations Engineer to develop and test STOL PROCs from Narrative Procedures  CHS Participation in LAT I&T at SLAC –ISOC/CHS provides transport and archiving of data from SLAC cleanroom FASTcopy-based transport Provides experience with LAT data formats Exercises ISOC Level0 data handling Offloads effort from I&T  CHS Participation in LAT I&T at NRL –Data transport and archiving, similar to SLAC  Observatory I&T at GD/Spectrum Astro Space Systems –ISOC provided EGSE h/w and s/w –Performs telemetry data filtering and format conversion to support ITAR restrictions  Pre-launch activity at Titusville/KSC –TBD, probably similar to ISOC-provided EGSE support at GD/SASS

LAT ISOCISOC Review, 15 February CHS Software Releases Driven by GS Tests

LAT ISOCISOC Review, 15 February ISOC Operations Data Products  From MOC (GLAST-GS-ICD-0002) Level 0 (science, HK, diagnostic & alerts) Real-time data Integrated Observatory Timeline –As-Flown Timeline TDRSS Ephemerides GLAST Ephemerides Requested TDRSS Contact Schedule –TDRSS Forecast Schedule LAT South Atlantic Anomaly Report Eclipse Entry and Exit Report Project Database –ToO Notification MOC Command Log –MOC File Transfer Log –Anomaly Report –MOC Status Report –Trending Tool Access –Remote Real-Time Telemetry Monitoring File Retransmission Request  From GSSC (GLAST-GS-ICD-0002) Preliminary Science Timeline File Retransmission Request  From LISOC (GLAST-GS-ICD-0002) LAT Science Timeline Instrument Flight Software Load PROC Request –South Atlantic Anomaly Definition Update –Anomaly Report –Instrument Procedures Project Database Update –Status Report –Data Retransmission Request File Retransmission Request

LAT ISOCISOC Review, 15 February Operating Procedure Development ProceduresNeed Date Conduct physics observationsETE1 Dwell telemetry, configure task messaging, configure command confirmationETE1 File upload and file managementETE2 Calibration data collection runETE2 SIU and EPU memory dump/writeETE2 ToO observationETE3 LAT turn on/offETE3 Set bias voltagesETE4 Configure LHK, mode control settingsETE4 Enable and disable science countersETE4 Thermal Control commandingETE4 Contingency file uploadETE5 CPU rebootETE5 Miscellaneous contingency operationsETE5

LAT ISOCISOC Review, 15 February Document Status Document TitleLATDocs #Last UpdateComment LAT Performance Specification – Level II(B)LAT-SS /10/01 LAT IOC Performance Specification – Level II(B)LAT-SS /15/04 LAT ISOC Operations PlanLAT-SS /14/04Update in work LAT ISOC Management PlanLAT-MD /8/04 LAT ISOC Verification and Validation PlanLAT-SS-02513Draft ISOC Configuration Management PlanLAT-MD-04835Draft LAT Science Verification and Calibration PlanLAT-MD /20/04 LAT SAS Level III RequirementsLAT-SS /7/02 LAT ISOC Level III RequirementsLAT-SS /3/04Update in work LAT Instrument Operations HandbookLAT-TD-07944Draft ISOC Test PlanLAT-MD-05150Draft Flight Software User GuideLAT-TD /5/06 FSW-ISOC ICDLAT-SS /31/05Update in work ISOC Software ArchitectureLAT-TD-04778Draft

LAT ISOCISOC Review, 15 February LAT Operations Facility at SLAC

LAT ISOCISOC Review, 15 February ISOC Operations Network at SLAC

LAT ISOCISOC Review, 15 February Operations Security  Implementing subnet for ISOC operations facility  Locked door physical security for operations facility  ISOC FASTcopy on secure servers in SCCS  ISOC at GD/SASS –ISOC will support filtering of GLAST test data on –Only pass LAT data off GD/SASS I&T LAN  ISOC at NASA/GSFC MOC –Access to ITOS computers on open IONET –LAT-provided computers on CNE network  ITAR considerations –LAT is in public domain –Spacecraft information is ITAR-restricted –Only LAT-related data comes to SLAC –GLAST GS elements use ITOS (ITAR-restricted) operations platform –Controlled access to ITAR-restricted items

LAT ISOCISOC Review, 15 February ISOC Workstations at GD/SASS

LAT ISOCISOC Review, 15 February CHS Resource Requirements Summary  Current Staffing –5 FTEs: 3 SLAC term staff + 2 contractors 1 Operations Engineer 1 Test lead test support 2.5 Software developers  Future steady-state staffing plan (post-launch) –5 FTEs: SLAC staff with NASA/space experience Operations Lead/Engineer Operations support scientist (alternate lead) Software developer 2 Operators (can multi-task, for s/w support or sysadmin) 0.5 network support / sysadmin –Objective is to have 2 people capable of supporting any operations task  Interim Computer room –1 office for placement of ITOS workstations (ITAR restricted s/w), until Ops facility available  Computer hardware, software –Operations control-room buildout scheduled for workstations + local sub-network support Other control room hardware: printers, copier, fax, UPS, A/V, etc. Furniture provided in SLAC Infrastructure project COTS software: SatTrack for mission planning support –2 workstations for GD/SASS I&T –Laptops/desktops for L&EO, placed MOC on NASA CNE network  Telecom: cellphone/PDAs for essential ops staff  Travel –2006: I&T support at NRL –2006: ITOS workstation setup and support at GD/SASS –2006/2007: Mission Simulations support at NASA/GSFC –2006/2007: Face-to-face operations TIMs