Guide to the Identification of Safety-Critical Hardware Items for RLV Developers COMSTAC RLV Working Group Meeting Washington D.C. 25 May 2005.

Slides:



Advertisements
Similar presentations
ANSI/ASQ E Overview Gary L. Johnson U.S. EPA
Advertisements

Experimental Permits for Reusable Suborbital Rockets Guidelines Randy Repcheck May 25, 2005 Federal Aviation Administration.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
RLV Working Group Presentation to the COMSTAC Michael S. Kelly 26 May 2005.
Federal Aviation Administration On-Orbit Debris Mitigation Methods for Upper Stages COMSTAC: Space Transportation Operations Working Group and Risk Management.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 7 – Medical Guidance for Crew & Spaceflight.
| Astronautics Research Group, Faculty of Engineering and the Environment University of Southampton,
Supply Chain Management Handbook (SCMH) Foreign Object Debris (FOD) Guidance Material Overview October
Overview Historical Database Tasking Status Findings to date
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
Page 0 COMSTAC RLV Task Force on Training RLV TASK FORCE ON TRAINING May 15, 2008 Maurice Kennedy.
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
Industry Session – Mixed Criticality and Multi-Core David Corman Program Director, Cyber Physical Systems National Science Foundation 1.
I) Bob Ettinger Flight Test Manager Northrop Grumman Aerospace Systems El Segundo, CA An Approach to Flight Readiness and Executive Readiness Reviews The.
International Strategy FAA Office of Commercial Space Transportation
Effects of Minimal Regulations on Commercial Human Spaceflight and Public Risk Acceptance Results of Nov 2011 Public Opinion Poll Presented to COMSTAC.
Building Internally Consistent Compensation Systems
Historical Growth of Space Debris Global Security Program Union of Concerned Scientists.
IAEA International Atomic Energy Agency Roger Seitz Addressing Future Human Actions for Safety Assessment Summary from CSM on Human Action And Intrusion.
2009 DEPARTMENT OF ENERGY ISM CONFERENCE KNOXVILLE, TENNESSEE AUGUST 26, 2009 Cecil Gibb Manager-Operations C Gibb Consultants.
RLV Working Group Reusable Launch Vehicles Working Group Presentation to the COMSTAC 11 October 2007 Michael S. Kelly, Chairman.
T. Dawson, TASC 9/11/13 Use of a Technical Reference in NASA IV&V.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level Concept of Operations for Commercial.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 5 – Aborts and Abort Systems. December.
Federal Aviation Administration Federal Aviation Administration Presented to: COMSTAC By: Bretton Alexander, RLV Working Group Chair Date: May 21, 2009.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 8 – Communications and Commanding Best.
Office of Commercial Space Transportation FAA/AST NASA Insurance Task Report Pam Underwood Technical Advisor Kennedy Space Center Operations Office May.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
Assessment of Alternate Methodologies for Establishing Equivalent Satisfaction of the Ec Criterion for Launch Licensing Terry Hardy AST-300/Systems Engineering.
AST Research and Development Activities COMSTAC Launch Operations and Support Working Group Chuck Larsen October 24, 2006 Federal Aviation Administration.
Communications During a Clinical Trial. Overview This session will cover how to: Announce your trial Maintain good communications Communicate with key.
1 COMSTAC RLV Working Group Meeting Report Presentation to the COMSTAC Michael S. Kelly Chairman 20 May 2004.
Presented to: COMSTAC RLV Working Group By: Ken Wong, Licensing and Safety Division Manager Date: May 15, 2008 Federal Aviation Administration Federal.
Federal Aviation Administration Federal Aviation Administration International Outreach Update FAA Office of Commercial Space Transportation COMSTAC RLV.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Federal Aviation Administration Federal Aviation Administration Presented to: COMSTAC By: Jim Muncy on behalf of Jeff Greason, RLV Working Group Deputy.
Industry Comments to Commercial Space Transportation Reusable Launch Vehicle Operations & Maintenance Guidelines Presented to the COMSTAC RLV Working Group.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon #3 – Types of Requirements and Guidance.
COMSTAC STOWG Commercial Aerospaceports Licensing and Development.
TGDC Meeting, July 2010 Report of the UOCAVA Working Group John Wack National Institute of Standards and Technology DRAFT.
Commercial Space Transportation Research and Development Program COMSTAC RLV Working Group Chuck Larsen October 10, 2007 Federal Aviation Administration.
1 Identify Preferred Alternative and Finalize Plan Planning Steps 7 & 8.
RLV Working Group Reusable Launch Vehicles Working Group Presentation to the COMSTAC 18 May 2007 Michael S. Kelly, Chairman.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Reusable Launch Vehicle Working Group Commercial Space Transportation Advisory Committee Presented to COMSTAC Meeting George Whitesides, RLVWG Chairman.
AST Research & Development Activities 26 October 2004 COMSTAC RLV WG Presentation by Shelia Helton-Ingram.
Presented to: By: Date: Federal Aviation Administration Office of Commercial Space Transportation Human Spaceflight Guidelines Update COMSTAC, Systems.
COMSTAC STOWG Commercial Spaceport Licensing Review: Survey Results, White Paper Summary, and Recommendations May 10, 2012.
Probabilistic Risk Assessment and Conceptual Design Bryan C Fuqua – SAIC Diana DeMott – SAIC
IAEA International Atomic Energy Agency TM Technical Meeting to Discuss Human Intrusion and Future Human Actions in relation to Disposal of Radioactive.
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
NPC Study on Prudent Development of North American Oil and Gas Resources Resources and Supply Task Group - Framing Questions Oil & Gas Resources: What.
Federal Aviation Administration Federal Aviation Administration Presented to: COMSTAC By: Bretton Alexander, RLV Working Group Chair Date: May 11, 2011.
Federal Aviation Administration Federal Aviation Administration Presented to: COMSTAC By: Debra Facktor Lepore, Acting Chair, Space Transportation Operations.
Mountain Risks: A Marie Curie Research & Training Network J. Corominas and the ‘Mountain-Risks’ research team Department of Geotechnical Engineering.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
FAA AST Office of Commercial Space Transportation Federal Aviation Administration Update on Commercial Human Spaceflight Telecons COMSTAC Systems Working.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Principal Investigator ESTCP Selection Meeting
Principal Investigator ESTCP Selection Meeting
Quantitative Risk Assessment
RST processes Session 5 Presentation 2.
Principal Investigator ESTCP Selection Meeting
Introduction: IAEA activities / Documents on human intrusion
Addressing Future Human Actions for Safety Assessment
Principal Investigator ESTCP Selection Meeting
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Guide to the Identification of Safety-Critical Hardware Items for RLV Developers COMSTAC RLV Working Group Meeting Washington D.C. 25 May 2005

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #2 Outline Project Overview WG Participation Current Status Document Overview -Depth of analysis -Safety-criticality guidelines -Identification process -List of potentially safety-critical items Future Work Observations Q & A

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #3 Project Overview Tasked by FAA/AST to form RLV industry working group in 2003 The working group was originally formed to: -define criteria for identifying potentially safety-critical systems for RLVs -develop a list of potentially safety-critical RLV items -to identify risks and develop risk mitigation/elimination controls for RLV operations

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #4 WG Participation The following organizations actively participated in the project for the past two years: -The Boeing Company -Kistler Aerospace -Lockheed Martin -TGV Rockets -XCOR Aerospace -FAA/AST

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #5 Current Status Document released on 1 May Brief announcement at Space Access meeting -Freely available at AST and AIAA websites uhttp://ast.faa.gov uhttp:// One example remains to be discussed by working group Document can be updated provided there is sufficient interest and involvement from affected parties

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #6 Document Contents Introductory material (foreword, scope, purpose, definitions) Hazard contributors Three-pronged approach to public safety Depth of analysis examples Risk assessment methodologies Guidelines and process for identifying safety-critical items List of potentially safety-critical hardware items Risk mitigation strategies for safety-critical hardware items

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #7 Depth of Analysis Examples Provides developers with characterization of level of effort associated with identifying safety-critical items for different mission scenarios Three scenarios presented -Sub-orbital launch in which dispersed IIP does not intersect populated area -Sub-orbital launch in which dispersed IIP intersects a small number of populated areas -Sub-orbital launch in which dispersed IIP intersects a large number of populated areas

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #8 Safety-Criticality Guidelines (1/3) In general, if BOTH of the following conditions are true for a particular item, the item is potentially safety-critical and may require further analysis. (1) If the vehicle is over/in a populated area, or may reach a populated area as a result of failure, and (2) the item could credibly fail, with the failure resulting in one or more of the five described hazard conditions

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #9 Safety-Criticality Guidelines (2/3) List of Hazard Conditions Failure causes vehicle breakup The vehicle is broken into fragments. Failure causes vehicle loss of control: The vehicle can no longer be controlled by the crew (may be onboard crew or ground crew) or by autonomous means. Failure causes uncontrolled debris: The failure leaves the vehicle intact and controllable, but debris is ejected, without any means of controlling where the debris will impact. For example, an engine failure leaves the vehicle intact and in control, but may cause a fan blade to be ejected from the vehicle; or a structural failure may lead to the separation of a aerodynamic control surface. The intentional jettison of a component (e.g. drop tank) during normal or emergency operations in a designated area is not considered a failure.

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #10 Safety-Criticality Guidelines (3/3) List of Hazard Conditions (continued) Failure causes uncontrolled discharge of hazardous material: The failure leaves the vehicle intact and controllable, but leads to the discharge of hazardous material (toxic, flammable, cryogenic, etc.). The controlled dumping of propellants in a designated area during an abort scenario is not considered a failure. Failure prohibits safe landing The failure leaves the vehicle intact and controllable in flight, but prohibits the vehicle from either reaching a designated landing location where the public is not endangered (e.g. a missile range), or prevents the vehicle from performing a controlled emergency landing without endangering the uninvolved public (e.g. at a public airport).

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #11 Identification Process (1/2)

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #12 Identification Process (2/2)

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #13 List of Safety-Critical Items (1/2)

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #14 List of Safety-Critical Items (2/2)

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #15 Future Work FY05: Incorporate fourth example into “Depth of Analysis” section Possible Follow-On Activities: Expand guidelines to cover hazard contributors other than hardware items Update and correct first version as necessary Any other suggested topics for gov’t/industry cooperation Any follow-on activities will depend on interest and involvement of affected parties

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #16 Observations (1/2) This effort established a neutral forum for industry/government to discuss safety concerns The document could be used for meeting RLV regulations on the identification of safety-critical items A considerable effort was made to ensure that this Guide will not place any undue regulatory burden on developers Guidelines and process defined should be applicable to a wide-range of vehicles A great deal of technical knowledge has been captured in this document

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #17 Observations (2/2) Model of industry/government working together seems to have been effective Other regulatory topics could possibly be addressed in a similar manner Reaching consensus between industry and government can be a struggle, but ultimately invaluable to both Any future efforts would benefit from greater industry participation to ensure as broad a consensus as possible

25 May 2005COMSTAC RLV Working Group Meeting - Washington D.C. Slide #18 Contact Information Craig Day AIAA Standards Program Manager American Institute of Aeronautics and Astronautics 1801 Alexander Bell Drive, Suite 500 Reston, VA Phone: