M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
February 2009 Summary of Chamonix 09 Steve Myers.
1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
R.Schmidt, HC 28/5/ Access to underground areas during powering Risk: accidental massive helium release (as on 19 September) when superconducting.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
For more info:
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
Recent cross-wiring issue and implication for circuits protection Bozhidar Panev TE-MPE-CP
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
MP3 List of main Issues during March 2010 MP3 - Team.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
MPE activities within MP3 Arjan Verweij A. Verweij, MPE review, 2 June 2015 The questions: 1. Define the scope of work for your activity 2. Structure of.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
MP3- MIC-C S1-2 A22R1- 19/08/2009 G.D’Angelo on behalf of Elqa team MP3 MIC-C test campaign in S1-2 Special guest: A22R1 (MB2413)  MIC-C in the ARC results.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
CERN TE-MPE-EP, RD, 09-April Quench Protection Systems (QPS) for the LHC R. Denz, TE-MPE-EP Acknowledgements: K. Dahlerup-Petersen, A. Siemko, J.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Quench behavior of the main dipole magnets in the LHC By Gerard Willering, TE-MSC On behalf of the MP3-CCC team Acknowledgements TE-MSC, MP3, BE-OP, TE-MPE,
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
(Access system for HWC)
Feasibility and implication of installation of the string test in SM18 with a slope M. Bajko WP16.
Ideas and design concepts, and challenges
The LHC - Status Is COLD Is almost fully commissioned
Powering the LHC Magnets
MPE main activities planned for LS2
Powering from short circuit tests up to nominal
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
ACS news Circulator TCU: control tests in progress All cavity racks
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
Power cut 18kV cable for EMD404/E9 is heating
(damaged board on RQD/F)
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
Review of hardware commissioning
Other arguments to train two sectors to 7 TeV
Presentation transcript:

M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK C RYOGENICS MASTER PLAN N & w-e 7/24

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK F UNDAMENTAL DATES Starting from w.6 (Feb.6) the machine shall be patrolled From Feb.6, start of ElQA on sector 67 (the day after on S23) From Feb.8, start of powering tests (Phase II directly), after cable connection and PC unlocking Shifts proposal (experts in CCC [EPC-QPS-MP3]/OP) – A shift (17:00-23:00) for the first two weeks (till Feb.19), w-e excluded / A – 2 shifts (M+A – 7:00-15:00-23:00) for the first 2 w-e / M+A – 2 shifts starting from w.8 (Feb.23) / 7/24 – PIC on call A M+AM+A A M+AM+A A+NA+N 7/24 Chamonix

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK P OWERING PARAMETERS

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK S TRATEGY FOR E L QA

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK S TRATEGY FOR E L QA No specific ElQA test will be done in the tunnel as the boards will be singularly tested and transported in a safe envelope. Coherency check done by CRYO during cool-down!

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK T HE BASELINE ( T. B. C. IN C HAMONIX ) IS 4 T E V Reconfiguration of PCs (HW and SW limits) Main circuits (6770 A required for RB; commissioned up to 6850 A) – No extra powering tests / no pyramids – No need for reconfiguration of energy extraction – needed for 5 TeV – Inductance coefficients recalculation (1 ramp at least) – No quench issue till ~5 TeV (RB.A78 had a training quench below!) – RB.A78 - ElQA tested up to 1.6 kV instead of 1.9 kV due to bad insulation on magnet B30.R7 (NC ) --> ok for 4 TeV, veto to be lifted for higher energies 2011 baseline

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK T HE BASELINE ( T. B. C. IN C HAMONIX ) IS 4 T E V IPQ/Ds – No extra powering tests (change of I_nom) – No issue to go to 4 TeV (weakest magnet is RD2.R8, which is limited to 6.8 TeV) IT – Normally commissioned to 5 TeV – IT.R1 - weak electrical insulation of QH YT1121 to coil and/or ground (NC ) --> performance of a new high capacitance PS under evaluation; verification if the energy deposited by the new DQHDS is also enough for 4 TeV ongoing (K.Dahlerup-Petersen) Correctors – All yearly commissioned to at least 5 TeV – Some limitations on a few 120 A correctors (not for 4 TeV) – Cooling problems on the 120 A correctors of ITs (agreement with ABP to commission them for use in MDs, but not needed even below 1 m  *) EDMS doc. No

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK P ROPOSED PARAMETERS

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK P ROPOSED PARAMETERS

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK M AIN CHANGES

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK S OFTWARE AND TOOLS Kajetan and Michael are working on a new GUI for follow-up, but also execution of tests. Debugging ongoing…

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK E XOTIC STUFF : QPS ACTIONS RQTD/F threshold increase done RQ9/10 threshold has been changed but a controller upgrade still has to be done R2E related upgrade: – Automatic power cycle option in 8 units in the machine not yet done – Splice detection firmware upgrade (in units located in high radiation areas) is still an option – New IPQ cards for radiation upgrade to be done once we have the cards (maybe on the first technical stop) – no specific test more than the normal campaign is needed to validate the change – Crate controller upgrade in cell 8/9 still to be done (Reiner commented that it’s anyway possible to run without it) A procedure on the heaters firing at 200 V is being prepared (Knud). Markus underlined that the java program to fire the heaters will have to be tested as soon as possible. No IPQs IPDs and ITs heater will be fired during IST (it’s done during the commissioning step of PIC2) During the PIC2 tests, for most circuits the QPS trip signal is given by the sequencer, for some circuits this is being done by a QPS expert. Can this be done by an operator or MP3 member? F3/F4 circuit breaker: half of the machine done, still to be decided whether the other half will also be done (Reiner and Knud think we better do it) Installation of new signal cabling for the magnet and busbar voltage to the DQQDI detectors on all RQ8/9/10 circuits: a meeting will be held this afternoon to discuss it Undulator test will be organized on the spare in SM18. Special tests of the undulator in LHC: not clear, check with A.Siemko EE system of A circuits has been changed (PNO.b1 has to be done) – list will be provided by Knud The campaign to change the switches of the QHPS will be finished before the HW commissioning campaign, then Knud stressed that heaters discharge procedure is important

1/24/ R E - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK P OSSIBLE IMPACT OF RF RE - COMMISSIONING ( FROM P. B AUDRENGHIEN ) Planning: – The RF should have a first sector cold on Feb 20, and the second on Feb – P. Maesen would start conditioning around Feb 22 – By Feb 27 th we would have a few cavities conditioned and we start the setting-up of the RF loops. This will last till March 7 th Modifications during shutdown: – Replacement of 8 drivers (out of 16) – Replacement of 4 klystrons (out of 16) – Replacement of ALL SMC cables in the UX45 faraday cage Consequences: – We will find problems when we start setting-up the RF between Feb 27 th and March 7 th. That will call for access in UX45 (not tunnel). Access is possible only if the magnets are at injection energy. So we will need to share time between powering tests and RF access