Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA.

Slides:



Advertisements
Similar presentations
Industrialization of Electrical Contracting Supply Chain and Logistics Management Santa Clara University School of Engineering Department of Civil Engineering.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Construction Documents
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
D. Thomas Ruttura President Ruttura and Sons Construction Co. Inc.
Unit 2 The Building Trades
Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
Welcome.. Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
THE MITCHELL FRAMING SYSTEM A building system that encourages homeowners to have a direct involvement in driving building growth and expansio n Neal Mitchell.
Construction Project Management: Technology driven answers for schedule and budget savings.
Bethesda Triangle Brian Groark Construction Management Faculty Consultant: Dr. Messner.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Senior Thesis 2007 Construction Management Option.
601 New Jersey Avenue Alternative Materials Amber House Structural 601 New Jersey Avenue Washington, D.C. Alternative Construction Materials Amber L. House.
Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management © Elkus Manfredi Architects Franklin & Marshall College.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
2009/ 2010 Linus Wang MBA, MSc (Int’l Constr Mgmt), B Eng (Civil) Diploma in Construction Management Diploma in Quantity.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Project title : Typical design of community college Supervisors: 1-Prof.Dr.abdulmohsion W. Dhowain 2-Dr. Mohammad Jamal AL Shannag 3-Dr. Ibrahim Hamouda.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Computer Associates International, Regional Office
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Palomar Medical Center West: Segmented Review Process.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks Initial Selection of Building Industry Sectors.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Pearl Condominiums Philadelphia, PA
Redifer Commons Addition & Renovation Project
Council Rock High School South
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Daniel Suter Unknown Data Center Somewhere, USA
Offsite Applications for Rail Overbuild Part 1
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
Thesis Presentation Devin Learn Construction Management Dr. Messner
AMBRIDGE AREA HIGH SCHOOL
Justin Pennycoff AE Senior Thesis 2008 Construction Management
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Wellington Condominiums Project
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
Coppin State University
Michael Abbondante Dr. Horman Proposal November 29,2006.
Masonry Bearing Walls.
Presentation transcript:

Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA

General Building Information 1 st floor contains retail units, remaining 5 floors are apartments 111,641 sf $13.5 million Precast plank and structural steel framing Construction began May 2006 and scheduled to end July 2007

Critical Industry Issue: Using Building Information Modeling What are the benefits and drawbacks to utilizing BIM software at the beginning of a project and incorporating those into the as-built drawings? Research Steps: –Review literature on the subject matter –Interview owners, architects, and contractors as to their take on utilizing BIM’s on a project –Review software costs and training Expected Outcomes : BIM’s, when utilized at the beginning of a project can help to coordinate trades, help an owner to understand their finished product and therefore recognize changes they may desire early-on, and can also help to create a thorough set of as- builts. Also, BIM’s can take on a negative reaction in a project by occupying inexperienced contractors’ time.

Technical Analysis: Composite Metal Deck v. Precast Planks Currently the flooring system consists of a slab on grade, a slab on deck for the second floor, and the four remaining floors are precast planks. What are the cost and schedule impacts and how do they affect the project? Research Steps: –Analyze the schedule –Analyze the cost –Analyze resource allocation –Minor redesign –Interview both cast-in-place and precast concrete contractors Expected Outcomes: Precast may help to accelerate the schedule. Cost savings might come into play in both the material and in the resources for doing the upper floors as slab on deck.

Technical Analysis: Hydraulic v. Traction Elevators Currently, the design for the conveying system is Gen2 elevators from Otis Elevators. What are the cost impacts, as well as the space allocation and maintenance requirements, related to both conveying systems? Research Steps: –Analyze the cost –Analyze maintenance requirements –Minor re-design –Interview elevator suppliers Expected Outcomes: Traction elevators my have a higher first-cost, but there are benefits in they do not require as much maintenance and do not take up as much space as a traditional hydraulic elevator.

Technical Analysis: Prefabrication How does management ensure the timely fabrication and arrival of steel members onto construction site? Research Steps: –Analyze the schedule – both in the fabrication shop and the construction schedule –Analyze resource allocation –Interview steel manufacturers and contractors Expected Outcomes: Devise a plan to communicate between construction site and fabrication shop the needs of the two and how to resolve any scheduling issues that will result in the timely construction of structural steel on site.

Weight Matrix DescriptionResearch Value Engineering Constructability Review Schedule ReductionTOTAL Structural Conveying Prefrabrication BIM30 TOTAL 45%10%25%20% 100%