ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.

Slides:



Advertisements
Similar presentations
ENGINEERING DESIGN OF RF STRUCTURES
Advertisements

COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
ABSTRACT We report on the suppression of long-range wakefields in the main linacs of the CLIC collider. This structure operates with 2π/3 phase advance.
ENGINEERING DESIGN AND PRODUCTION OF X-BAND RF COMPONENTS Germana Riddone, CERN, Geneva, Switzerland Maria Filippova, I. Syratchev, Anastasiya Solodko,
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
Richard F Boyce Injector UpdateL0-1 Accelerator 3 November L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Structure stacking alignment tolerances CLIC Workshop January 2015 CERN Anastasiya Solodko, on behalf of the CLIC study team.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
2 nd collaboration meeting on X-band Accelerator Structure Design and Test-Program Structure fabrication Comparative analysis of disk and quadrant manufacture.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
First TBL PETS prototype tank development D. Carrillo, E. Rodríguez, F. Toral, CIEMAT N. Chritin, S. Doebert, I. Syratchev, CERN CERN, 24/01/2008 Courtesy.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Investigation threads on fabrication technologies for the CLIC X-band Accelerating Structures C. Rossi on behalf of the CLIC X-band Activity Thanks for.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
An Overview of the CLIC Testing Program W. Wuensch CLIC ACE
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
10/2007 M.Taborelli, TS-MME Structure Manufacturing, Achievements and Challenges M.Taborelli -Technology -Shape accuracy -Surface quality -Assembly accuracy.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
1.3GHz Input Coupler for ILC
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
5 th CLIC-ACE Structure production in laboratories and industries G. Riddone, 02/02/2010 (contribution from KEK/SLAC colleagues) 1.
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
WP 9.2 DDS Status, R.M. Jones, 25 th Oct 2010, WebEx Phone-in, Geneva 1 WP 9.2: DDS Status Roger M. Jones Cockcroft Institute and The University of Manchester.
TBTS Test Program & Schedule G. Riddone
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Ports: purpose –vacuum, rf location –accelerating cavity, coupling cavity dimensions … Already discussed, but some points need to be double checked …
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
WFM electronics Alexandra Andersson. F. Peauger – CTF3 committee – 11/02/10  Wakefield Monitors implemented in two accelerating structures TD24 (tank.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 CEA SACLAY CLIC R&D Activities F. Peauger, A. Hamdi, M. Desmons, W. Farabolini, P. Girardot.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Structure Wakefields and Tolerances R. Zennaro. Parameters of the CLIC structure “CLIC G” (from A. Grudiev) StructureCLIC_G Frequency: f [GHz]12 Average.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Status of CIEMAT work on PETS
Test Accelerating Structures Designs, Objectives and Critical Issues
LCWS11 WG4 Fully featured accelerating structure engineering design
Wake-fields simulations and Test Structure
Franck Peauger, Riccardo Zennaro
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Task 2: High-gradient normal-conducting technology development
Update of CLIC accelerating structure design
Presentation transcript:

ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures must be aligned to an accuracy of 5 µm [1] with respect to the beam trajectory. Position detectors called Wakefield Monitors (WFM) are integrated to the structure for a beam based alignment. For the adaption of WFM the accelerating structure TD24 12GHz, based on CERN design, is used. The WFM is integrated to the structure, without modifying its accelerating and damping properties. This paper reports engineering design of a prototype accelerating structure with WFM. Precise machining of disks with a tolerance of ± 2.5 µm and a surface roughness of 25 nm is demonstrated. The fabrication status of three complete accelerating structures with WFM is finally presented for a feasibility demonstration with beam in CTF3 at CERN. A. Solodko, A. Samoshkin, D. Gudkov, JINR, Dubna, Russia, G. Riddone, A. Andersson, Geneva, Switzerland, F. Peauger, P. Girardot, CEA Saclay, France, R. Zennaro, PSI, Villigen, Switzerland TM LIKE MODE TE LIKE MODE SiC LOAD Wakefield monitor RF design - 26 cells with damping waveguides - 2 couplers - 4 special regions for monitoring wakefields WFM WAVEGUIDE COOLING TUBE COOLING BLOCK ACCELERATING STRUCTURE THREADED ROD STRAP Accelerating structure with Wakefield Monitors (WFM) The design of presented AS is based on the Tapered Damped (TD)[2,3] type cell geometry. The high-precision copper disks are joint by means of diffusion bonding, forming the body of accelerating structure. The structure is equipped with four bent waveguide connected to the middle cell. Two RF pick-ups for both horizontal and transverse modes detection are implemented on the each waveguide. Mechanical design of RF disks MIDDLE CELL HOLES FOR PINS SPECIAL CELL HOLES FOR BOLTS REGULAR CELL - Cell iris shape accuracy mm - Cell waveguide shape accuracy 0.01 mm - Flatness accuracy mm - Cell shape roughness Ra μm Mechanical design of WFM waveguide TOP WAVEGUIDE - Waveguide shape accuracy 0.01 mm - Waveguide shape roughness Ra 0.1 μm BOTTOM WAVEGUIDE REFERENCES CONCLUSION A new wakefield monitor design has been presented. It is integrated to the CLIC main linac accelerating structure without any major change. The wakefield monitor allows to study two kinds of hybrid HEM modes at the same time. The mechanical design has taken into account the required high gradient fabrication technologies of normal conductive cavities as well as the integration constraints in the CTF3 environment. The disks are currently in fabrication at the French company Mecachrome. The manufacturing should be finished by the end of 2010 so that low level RF tests and installation in the vacuum tank will occur in spring In parallel, the electronic acquisition system under development at CERN will be installed and first tests with beam and high power RF from PETS will be performed in 2011/2012. ACKNOWLEDGMENT The positioning of WG with WFM relative to AS is realized by two pins. A good electrical contact, needed between the WG and AS, is provided by tightening of four bolts, used for fixing the WG on the AS body. One SiC absorber, needed for damping of high-order modes, is fixed in each WG by means of bracket. The coaxial connectors with screwed RF- pick-ups are fixed directly to the adapter. SiC LOAD MIDDLE CELL COUPLER REGULAR CELLS BRACKET Waveguide with WFM CONNECTION PLATE SPECIAL CELLS WFM WAVEGUIDE CONNECTER [4] ADAPTER TM LIKE MODE RF PICK-UP TE LIKE MODE RF PICK-UP BRAZING GROOVE PUSH-PULL Assembly procedure Pre-assembly of couplers - Diffusion bonding of high power couplers under H 2 - Re-machining of flat surface for the WR90 waveguide connection - Drilling special holes in the external butt Assembly - Diffusion bonding of high precision disk stack and prepared couplers under H 2 - Vacuum brazing of tuning studs - Fixation of WFM waveguides - Clamping of cooling blocks and cooling tubes FLAT SURFACE FOR WR90 WAVEGUIDE CONNECTION HOLE FOR INTEGRATION AS IN TEST ENVIROMENT TUNING STUDS Tuning system - Push-pull principle - 4 tuning studs inside each cell It is possible to increase or decrease the internal volume of each cell by deforming the thin wall. Integration of Accelerating structure to the testing environment in CTF3 The two accelerating structure with WFM will be finally installed for a feasibility demonstration in CTF3 (CLIC Test Facility 3) at CERN. The mechanical design of the structure has taken into account the dedicated surfaces for providing integration to the testing environment. ACCELERATING STRUCTURES WITH WFM FEEDTROUGH [5] INPUT WAVEGUIDES OUTPUT WAVEGUIDES VACUUM CONNECTION [1] The CLIC Study Team, “CLIC 2008 Parameters”, CLIC-Note-764. [2] M. Dehler, I. Wilson, W. Wuensch, “A Tapered Damped Accelerating Structure for CLIC”, LINAC’98, Chicago, August 1998 [3] A. Grudiev, W. Wuensch “Design of an X-band accelerating structure for the CLIC main linac”, THP062, LINAC08, Victoria, BC, Canada. [4] [5] [6] F. Peauger, W. Farabolini, P. Girardot, A. Andersson, G. Riddone, A. Samoshkin, A. Solodko, R. Zennaro, R. Ruber, “Wakefield monitor development for CLIC accelerating structure”, LINAC’10 The development described in this paper is the result of the international collaboration. The authors wish to thank all of the members of the collaboration for their valuable contribution.