Tribal Permitting Conference 2013 Steve Dunn, P.E., Construction Permit Team Leader; Bureau of Air Management (608) 267-0566;

Slides:



Advertisements
Similar presentations
Richard (Rick) Goertz, P. E
Advertisements

EPA’s Clean Power Plan Proposed Rules for Reducing GHG Emissions from Power Plants Presentation to ACPAC June 16,
Jan. EPA Final GHG Reporting Guidance (actually Dec ) Mar. 31stAnnual GHG Reporting AprilProposed HAPs or Mercury MACT July 1st Annual Toxic Release.
Tribal Permit Training Fond du Lac Reservation June 11, 2013.
1 Air Management Programs Legislative Audit Bureau May 2004.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
Michael Hopkins Assistant Chief, Permitting Ohio EPA Update on GHG Permitting in Region V.
April 15, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Kimberton, PA | Columbus, GA | Strategic Air Planning: Where Do We Grow From Here? Colin McCall |
Air Permitting Overview.
Air Construction Permitting Services Sarah Piziali, Construction Permit Section Supervisor.
NACAA Permitting Workshop, Chicago June 14, 2011 Raj Rao, NSR Group Leader OAQPS, EPA GHG Permitting – Regulatory Update.
December 4, Utility MACT Air & Waste Management Association/EPA Information Exchange December 4, 2002 William H. Maxwell Combustion Group/ESD.
Air Pollution Control Board October 1, 2008 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of Environmental Management We Protect.
Air Quality Beyond Ozone and PM2.5 Sheila Holman North Carolina Division of Air Quality 6 th Annual Unifour Air Quality Conference June 15, 2012.
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
Pinal County Air Quality Workshop Casa Grande – January 14, 2014 Kale Walch & Anu Jain – Permit Engineers.
Indiana Environmental Health Summit Indiana Department of Environmental Management (IDEM) June 6, 2011 Thomas W. Easterly, P.E., BCEE, QEP Commissioner,
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
PERMITTING ELECTRIC GENERATING UNITS Jim Linville & Erik Hendrickson Air Permits Division.
Tribal Minor New Source Review Registrations Kaushal Gupta, Environmental Engineer, Air Permits Section USEPA Region 5 Air & Radiation Division Tribal.
Analysis of Existing and Potential Regulatory Requirements and Emission Control Options for the Silver Lake Power Plant APPA Engineering & Operations Technical.
GROUP 3 Alyssa Boutang Whitney Gee Rachel LaMedica BJ Pringle.
Air Quality 101 Kansas Air Quality Program overview.
August 4, 2011 Heather Ceron US EPA Region 4 1. Greenhouse Gases 2.
Mississippi Air Update Mississippi Dept. of Environmental Quality September 12, 2012.
CANDACE CARRAWAY OFFICE OF AIR QUALITY PLANNING AND STANDARDS US EPA JUNE 2013 General Permits and Permits by Rule 1.
Air Quality Regulations – What’s New? (for Ethanol Plants) Shelley Schneider Air Quality Division Administrator.
Greenhouse Gas (GHG) Permit Training Region 4 – Atlanta, GA Dec , 2010.
Bill Harnett March 30, 2010 WESTAR Spring Meeting.
Kimberton, PA | Kennesaw, GA | Strategic Air Planning: Is the Time for a PAL Here? Mark Wenclawiak, CCM|
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
1. Carbon dioxide (CO 2 ) – Naturally occurring and man- made. 5,505.2 mmts emitted in 2009, GWP = 1 Methane (CH 4 ) - Naturally occurring and man-made.
An Overview of Environmental Issues Affecting the Energy Industry December 13, 2010 Thomas W. Easterly, P.E., BCEE, QEP Commissioner IN Department of Environmental.
GHG BACT Analysis Case Study Russell City Energy Center May 2010 Donald Neal Vice President, EHS.
Clean Air Act and New Source Review Permits EPA Office of Air Quality Planning and Standards Research Triangle Park NC March
ANPR: Transition to New or Revised PM NAAQS WESTAR Business Meeting March 2006.
National Ambient Air Quality Standards and Current Status of Air Quality Laura Boothe North Carolina Division of Air Quality MCIC Workshops March 2012.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Overview of Air Permitting Fees In Illinois
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
REGULATIONS & LEGISLATION BIG TEN ENVIRONMENTAL STEWARDSHIP GROUP STEVE MARUSZEWSKI – PENN STATE Greenhouse Gases.
Minor NSR Program and Highlights of the Proposed Tribal Major Nonattainment and Minor NSR Rules Jessica Montañez U.S. Environmental Protection Agency Office.
PSD/Nonattainment Review You can do this! Marc Sturdivant Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015.
New Source Review Rules Update Jessica Montanez U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Policy Division.
Brad Miller Anna Kelley. National Ambient Air Quality Standard Update New Sulfur Dioxide Non-Attainment Area – Effective October 4, 2013 Ozone Secondary.
Wingra Engineering, S.C.1 Evaluation of Gas Turbine Air Quality Impacts from a Community Perspective Steven Klafka, PE Wingra Engineering, S.C Electric.
NSR and Title V Activities WESTAR Business Meeting May 2005.
MassDEP Response to EPA GHG Initiatives SIP Steering Committee January 13, 2011 Marc Wolman.
Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
Greenhouse Gas Permitting Sean O’Brien Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
Resource Management Planning Air Quality Brock LeBaron Department of Environmental Quality Division of Air Quality
Air Pollution Challenges Kentucky Coal Association April 29, 2013 Thomas W. Easterly, P.E., BCEE Commissioner Indiana Department of Environmental Management.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
1 Nez Perce Reservation Presented by Mary Fauci Tribal NSR Training Temecula, CA 11/1/11.
1 Update on New Source Review (NSR) Activities and Priorities for Information Transfer and Program Integration Division April 7, 2004.
Regulatory background How these standards could impact the permitting process How is compliance with the standards assessed.
Jerry Beasley, Ph.D., P.E. Mississippi Dept. of Environmental Quality MMA Environmental & Safety Conference and Expo October 16, 2015.
MPCA Citizens’ Board Meeting: United States Steel Corporation-Keetac Air Emissions Permit Owen Seltz Industrial Division September 13, 2011.
New Source Review (NSR) Program Basics
Clean Air Act Glossary.
Bill Harnett WESTAR Spring Meeting April 8, 2009
Greenhouse Gas Permitting: One Year After the Tailoring Rule
Clean Air Act (CAA) Purpose
GHG Permitting: Regulatory Update
Best Available Control Technology for Greenhouse Gas Emissions Sources
Presentation transcript:

Tribal Permitting Conference 2013 Steve Dunn, P.E., Construction Permit Team Leader; Bureau of Air Management (608) ;

Air Pollution Control Permits What do Air Permits do? –Identify applicable legal requirements –Delineate how the facility will comply with those requirements –Give authority to facility to emit at regulated levels –Assure air quality standards can be met Protect human health and welfare

Air Pollution Control Permits What is WI’s Program –Construction permits for new sources (SIP approved since late 1990’s for PSD/NSR) –Operation permits for major, FESOP and minor sources –Registration operation permits for sources with less than 25 tpy actual emissions –General operation and construction permits for printers, crushers and asphalt plants

Air Pollution Control Permits What is WI’s Program –Complete approx. 90 construction permits per year. Fee funded –Over 400 Title V sources on 5-year renewal schedule –Permits is a decentralized activity with permit writers throughout the State –PSD/NSR major source review is a mostly centralized activity

Air Pollution Control Permits What is WI’s Program –Generally, construction permits issued separately from operation permits –Construction permit terms included at next revision or permit renewal –Terms of construction permits, except authority to construct, are permanent

Air Pollution Control Permits What is WI’s Program –Non-attainment areas is SE WI for PM2.5 and ozone –One Tribal Class I area in NW WI –Partnering with Tribe on implementing Class I requirements and MOU between the State and the Tribe

Topics in Permitting Greenhouse gas regulationGreenhouse gas regulation Sand miningSand mining NO2, SO2 modeling and complianceNO2, SO2 modeling and compliance Single source determinationsSingle source determinations Biogas and agricultureBiogas and agriculture SIP’sSIP’s PM2.5PM2.5 StreamliningStreamlining Working with you!Working with you! Questions?Questions?

Greenhouse Gas regulation History of GHG regulationHistory of GHG regulation –January 2011: New GHG air permitting began for facilities that would have to go through air permitting for non-GHG pollutants anyway. –January 2011: EPA proposed a three-year deferral of GHG permitting for facilities that use biomass. –July 2011: New GHG permitting began for new facilities that would emit more than 100,000 tons of CO2e per year and for facilities that will undergo major modification that would increase emissions by 75,000 tons of CO2e per year. –July 2011: EPA finalized a three-year deferral of GHG permitting for facilities that use biomass (not available in Wisconsin).

Greenhouse Gas Regulation WI PermittingWI Permitting –50 MW biofuel boiler –1200 MMBTU nat gas boilers (four combined) –Other nat gas boilers –nat gas/landfill gas fired simple cycle combustion turbines –Large utility coal boiler –Limits based on output –requires a level of useful energy production per unit of fuel energy consumed

Greenhouse Gas Regulation All permitteesAll permittees –Need to include GHG emissions in all permit (operation and construction) applications –Biogenic 3-year waiver not (yet) available in WI. June 20, 2013 is SIP approval

“Frac” sand mining Numerous sand mining and processing operations operating or under construction Primarily in western WI Primary emissions are fugitive particulate and emissions from coating or drying, if applicable

“Frac” sand mining Issues: –Fugitive dust control Fugitive dust plans being required as part of construction permit application Biggest source of complaints and concerns from neighbors of operating facilities or proposed facilities

“Frac” sand mining Issues: –Single source for operation separated by distance (up to 20 miles) –Many construction permit waiver requests due to short term delivery commitments –Generally minor (non Title V) sources

Air Quality Analysis What is recent –1-hour standard for NO2 and SO2 being evaluated for PSD projects; for minor projects in 2 years or so (maybe, depends on rulemaking) –Shorter term standards make for new permit issues –Compliance averaging time for these pollutants is now much more important

SO2 and NO2 SO2 –Generally fuel based emissions –Can be accurately predicted from fuel sulfur content and fuel sampling (coal, oil, nat gas) –Short-term emissions more problematic for some processes such as foundry cupolas (fuel based and process related emissions) –Generally manageable for short term emission limitations

SO2 and NO2 NO2 –Often 30 day rolling average emission limitations –Not necessarily protective of the ambient standard –Generally combustion related –Cannot be accurately predicted on a short term basis from fuel type –Short-term emissions can be quite variable (startup/shutdown/unsteady state operation)

SO2 and NO2 NO2 –What averaging time for limitations is appropriate? –How can compliance with short-term emission limitations be demonstrated –What are realistic operating scenarios and maximum hourly emissions

Single source detemrinations Part 70 and PSD (NSR) rules establish criteria for what is a facility/source –Same two-digit SIC classification –Located on contiguous or adjacent property –Under common control

Single source detemrinations –Same SIC Classification Two digits are the major group classification (exs. Mining, utility,…) Who decides the SIC of facilities? Classification by primary purpose of the facility –Exs: wwtp at industrial facility, boilers at an industrial facility,…_ –Support facility – operation that is primary for supporting the production of the primary produce –Origin in 1980 PSD rule preamble

Single source detemrinations –Same SIC Classification –More complicated Sand coating and sand mining Co-located digesters

Emission Limit applicability Important to know limit form and applicability to demonstrate compliance –What is the basis of the limit? Modeling? BACT? Adm. Code? MACT? –Does the limit have an averaging period? Can it have an averaging period? –Does the limit apply at all times or are the exceptions? Are these exceptions clear in the permit? –How is compliance demonstrated? Does this actually demonstrate compliance?

Permits in 2012 –Guidance on when a construction change is a revision of the active construction permit or a new modification –Permit guidance from petition workgroup –Evaluating potential for additional ROP’s or GOP’s –GHG biogenic deferral –Continue to try and improve efficiency and the permit documents