Ledyard Wastewater Facilities Management Plan A Presentation to the Ledyard Town Council/ Water Pollution Control Authority By Maguire Group Inc. January.

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

Fayette County Wastewater Management Plan October 6, 2005.
Princeton Wastewater Servicing Study
Welcome to Shawnee #2 Wastewater Treatment Plant.
Finally! – A Process that Looks at Environmental Risk Early J. S. Irving Environmental Compliance Idaho National Laboratory.
LEACHATE MANAGEMENT AND TREATMENT
Anne Arundel County Department of Public Works
Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.
GENERATION OF ADDITIONAL REVENUE FROM PRODUCTS OF
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
LIS Quiz 1 Review. What are the steps of Hypoxia? 1.Excess fertilizer is sprayed on hundreds of residential lawns. 2.Rain or runoff (CSO) brings nitrogen.
Design and Implementation of Title 5 Systems and Small Package Treatment Plants Presented by: John B. McAllister, P.E. Norfolk Ram Group, LLC One Roberts.
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
Presented to the Connecticut Association of Water Pollution Control Authorities | April 26, 2013 Community Systems 101 Presented by Thom Knowlton, P.E.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
0 Scoring Community Development Block (CDBG)Grants Water/Sewer Apps April 8, 2013 SEIRPC CDBG Scoring Committee.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Promoting Smart Growth with Wastewater Management Optimizing Conservation and Growth with Wastewater Management Strategies.
Hospital Mercury Reduction Gary Goodman Environmental Specialist Sacramento County Department of Water Quality.
GALENA WASTEWATER TREATMENT UPGRADES Informational Presentation for the Sassafras River Association Presented by Ryan J. Rangel, PE April 23, 2015.
A Review of State-of-the-Practice Equipment at the Plum Creek WWTP By Tim Grotheer Plum Creek Wastewater Authority & Dave Oerke RTW Professional Engineers.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Water Purification and Sewage Treatment
Connecticut Department of Energy and Environmental Protection.
Building A Better Biosolids Future. A Brief History Sewage Treatment in Detroit  “ The Grand Sewer” 1836  The Fairview Sewer 1913  The Detroit WWTP.
Smart Growth / Smart Energy Toolkit Wastewater and Higher Densities Achieving Higher Density Development In Areas Without Sewer/Water Service Smart Growth.
Moving Bed Biofilm Reactor Retrofit for Ammonia and Nitrate Removal
OutlineBackground Conventional on-site systems Advanced treatment systems.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
We are a coastal community. We have beaches and marinas. We have salt marshes and tidal inlets. We have parks with fantastic water views. “ Where the.
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
MWRA Massachusetts Water Resources Authority Water Treatment History.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Project History Town of Newport Population: 550 Vermillion County Seat.
STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005.
Rapid Assessment Process Project Strategic Plan City of Marfa Water and Wastewater System Improvements Marfa, Texas Presented to: Stakeholders and Project.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
Source Control Planning for Municipal Wastewater System Permit Compliance Environmental Trade Fair & Conference Austin, TX. May 6, 2015 David James Santiago.
Connecticut Department of Energy and Environmental Protection.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
Missoula County Commissioners and City Council formed the Missoula Valley Water Quality District (MVWQD) Missoula County Commissioners.
Public Information Meeting Wastewater Treatment January 26, 2016.
Report of the NPDES Subcommittee October, August 19 Conference Call Mercury Discharges from Power Plants Proposed Ammonia Criterion Temperature.
Presented by: David S. Prinzhorn, P.E. Town Engineer/Public Works Director/Utilities Manager Town of Cave Creek.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study.
Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Welcome to the Key Largo Wastewater Treatment Plant.
What is wastewater and why should we treat it (clean it)? Wastewater is a term that is used to describe waste material that includes sewage waste (poop,
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
WATER – WASTEWATER TREATMENT EXPERIENCE
Decentralized Wastewater Treatment in Jordan Challenge or Opportunity?
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Biosolids Public Workshop March 22, 2016
Wastewater Treatment.
Sewage Treatment.
IMPACT ON WATER March 14, 2018 Andrea G. Green
Wastewater Facilities Upgrade Project
Indiana Department of Environmental Management Office of Water Quality
The Wausau Wastewater Treatment Facility
Presentation transcript:

Ledyard Wastewater Facilities Management Plan A Presentation to the Ledyard Town Council/ Water Pollution Control Authority By Maguire Group Inc. January 11, 2011

Facilities Management Plan   Required by CT DEP   Phased approach Phase I – Analysis of needs in outlying areas Data gathering and mapping Needs analysis Preliminary alternatives analysis Preliminary treatment plant review Approved by CT DEP   Phase II – To be completed Detailed alternatives analysis

Phase I – Data Gathering & Mapping   Reviewed files at LLHD Dimensional variances History of well contamination History of illegal discharges   Interviewed staff at LLHD   Environmental mapping evaluation   Future Development

File Review

Environmental Conditions

State C&D Plan – Consistency

Needs Analysis  Areas of Concern  Aljen Heights  Avery Hill  Christy Hill  Gales Ferry  Growth on Route 12

Preliminary Alternatives Analysis  Repair/replace existing on-site systems  New community treatment/disposal systems within Ledyard  Connect to neighboring towns (Preston and Groton)  Connect to Town of Ledyard WWTF

Study Areas

Ohio Avenue 10-inch sewer main LEDYARD GROTON Connection to Town of Groton

Preliminary Treatment Plant Review  Flows – Reduce infiltration/inflow (I/I) to plant  Effluent – In compliance with permit  Plant Processes – In need of upgrades to be considered in Phase II  Preliminary Recommendations  Spare effluent pump  Spare bulbs and controller for UV system

Next Step – Phase II Future growth and impact on Ledyard WWTP Alternatives proposed by DEP  Evaluate a small treatment facility on Thames River servicing Aljen Heights and Avery Hill  Evaluate costs of interconnection with Norwich State Hospital to service Aljen Heights and Avery Hill  Evaluate reuse of wastewater discharges from Avery Hill and Aljen Height at large nursery on Route 2A

Next Step – Phase II  Treatment Plant Upgrade Considerations Headworks Bar screen, grit pit, influent pump controls  Sequencing Batch Reactors (SBRs) Chemical addition expansion Replace decanters Additional SBR tank for future flows (if required)  High-Speed Turbo Blowers Including dissolved oxygen controls  Backup Ultraviolet Disinfection

Next Step – Phase II  Treatment Plant Upgrade Considerations (cont.) Effluent Dosing Chamber Improvements  Instruments and Controls Upgrade SCADA system from Windows 95 Additional SCADA controls and monitoring Upgrade autodialer  Seepage Beds Limitations  Demolish Old Plant

Funding Options  Clean Water Fund Planning Assistance Reserve DEP reimburses 55% of eligible costs  Town can apply for Phase I & II funding  Funding available on a first-come/first-serve basis  Clean Water Fund Priority List  Ranked 131 out of 168 for I/I Rehab ($200K)  Small Town Economic Assistance Program (STEAP)  Working with Developers