SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.

Slides:



Advertisements
Similar presentations
Babakin Space Center, Space Research Insitute, Makeev Rocket Design Bureau COSMOS ONE: THE FIRST SOLAR SAIL a project of The Planetary Society with Cosmos.
Advertisements

Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
Polar – THEMIS Collaboration Opportunities Spacecraft Locations post launch Magnetopause campaign? Conjugate studies with THEMIS Ground Stations C. T.
Constellation Orion Visible Light Constellation Orion Infrared Light.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
THEMIS FRRSC - 1 KSC, Feb 12, 2007 SPACECRAFT OVERVIEW/STATUS Peter R Harvey THEMIS Project Manager.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Attitude Determination and Control System (ADCS)
Brief introduction of YINGHUO-1 Micro-satellite for Mars environment exploration J. Wu, G. Zhu, H. Zhao, C. Wang, L. Lei, Y. Sun, W. Guo and S. Huang Center.
Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus – A Mission to Touch the Sun Rob Decker and Nicky Fox Johns Hopkins Applied Physics Laboratory.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
THEMIS : RESOLVING THE PHYSICS OF ONSET AND EVOLUTION OF SUBSTORMS OBJECTIVE: Study energy releases from Earth’s magnetosphere known as substorms (magnetic.
MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
MPSRAlignments - 1 UCB, Oct 26, 2006 THEMIS PROBE MISSION PRE-SHIP REVIEW Alignments Paul Turin LME University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
Magnetospheric MultiScale Mission (MMS) Overview
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
EGU General Assembly 2006, 2-7 April, 2006, Wien ST6 Multi-point measurements of solar-terrestrial plasma: results and future perspectives Scientific objectives.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
Lander Experiment ROMAP
THEMIS FDMO Review Propellant Budget Update − 1 October 5, 2004 PROPELLANT BUDGET UPDATE Vassilis Angelopoulos Covered in this presentation: Allocations.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
How ARTEMIS Contributes to Key NLSI Objectives C.T. Russell, J. Halekas, V. Angelopoulos, et al. NLSI Lunar Science Conference Ames Research Center Monday,
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
SPACECRAFT OVERVIEW/STATUS
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
THEMIS SOCScience Data Products − 1March 29, 2006 Science Data Products Timothy Quinn.
PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: Time History of Events.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
Lessons Learned Project Overview 1 Jan 29, 2008 THEMIS Introduction Jan 29, 2008.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
THEMIS SRR Mission Requirements - 1 UCB July MISSION REQUIREMENTS Ellen R. Taylor Mission Systems Engineer Space Science Laboratory University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
Pre-Ship IIRT Telecon EFI 1 Telecon, Dec. 5, 2006 THEMIS Pre-Ship IIRT Telecon EFI Preamp Current Consumption John Bonnell EFI Lead University of California.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
MISSION PRE-ENVIRONMENTAL REVIEW
Spacecraft Interface and I&T
Mission overview: two spacecraft that target key radiation belt regions with variable spacing
University of California - Berkeley
Solar Probe Plus FIELDS Instrument PSR - MEP Introduction
THEMIS program: an Overview
MISSION PRE-ENVIRONMENTAL REVIEW MASS PROPERTIES & SPIN BALANCE
THEMIS INSTRUMENT TRAINING
THEMIS MISSION PRE-SHIP REVIEW
THEMIS Introduction Nov 6, 2007.
Presentation transcript:

SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley

SWT Overview 2 UCB, Nov15/16, 2006 Mission Parameters Launch Vehicle:Delta II, Eastern Range Apogee:84191 km ± 9567 km Perigee:400 km ± 6 km Inclination:17.0 deg ± 0.5 deg Date:Feb 15, 2007 Space Segment Spacecraft:5 Spinning Probes with Fuel for Orbit & Attitude Adjust Instruments:3-Axis Electric Field, Magnetic Field 3-D Ion & Electron Particle Detectors Spin Rate:20 RPM Orbit Period(s):1, 2 and 4 days Orientation:Ecliptic Normal Ground Segment Observatories:20 Northern with All Sky Imagers and Magnetometers Control Facilities:Mission and Science Operations Centers Operations Phases:L&EO, Cruise, Ascent, Campaigns, De-orbit Lifetime:2.3 years Mission Summary

SWT Overview 3 UCB, Nov15/16, 2006 Instrument Configuration IDPU: Instrument Data Processor Unit SPB : Spin Plane Booms (4x) AXB : Axial Booms (2x) SST : Solid State Telescope (2x) ESA : Electrostatic Analyzer FGM : Fluxgate Magnetometer SCM : Search Coil Magnetometer

SWT Overview 4 UCB, Nov15/16, 2006 Fuel Tank ESA EFI SPB Thruster T1 EFI Axial Booms (2, Stowed) Battery BAU Repress Tank Miniature Sun Sensor Transponder Thruster T2 IDPU Fuel Tank Antenna EFI SPB Thruster A1 Thruster A2 AEB Gyros Probe Configuration

SWT Overview 5 UCB, Nov15/16, 2006 Standard Delta 10 ft. Fairing Static Envelope 3712 PAF Probe Carrier Assembly (PCA = 5 Probes + Probe Carrier) on L/V Probe Carrier Assembly (PCA = 5 Probes + Probe Carrier) on L/V THEMIS Launch Configuration Probe Carrier Assembly (PCA) on Delta 3 rd Stage Launch Configuration Dedicated launch accommodated within standard Delta vehicle configuration and services 10’ Composite Fairing required to accommodate five Probes on the Probe Carrier in the “Wedding Cake” configuration PC stays attached to Delta 3 rd stage after probe dispense Each probe dispense from the PCA is coordinated with but independent of the other probes No single probe anomaly precludes dispense of remaining probes Star 48 3 rd Stage

SWT Overview 6 UCB, Nov15/16, 2006 Probe & PC Status Probe Status Environmental Tests June Environmental Tests June

SWT Overview 7 UCB, Nov15/16, 2006 Probe & PC Status Probe Status Probes 1 to 5 LPTs PC & Mass Dummies July Probes 1 to 5 LPTs PC & Mass Dummies July

SWT Overview 8 UCB, Nov15/16, 2006 Probe & PC Status PCA Assembly and Test, July

SWT Overview 9 UCB, Nov15/16, 2006 Probe & PC Status PCA Vibration, July

SWT Overview 10 UCB, Nov15/16, 2006 Probe & PC Status Probe/PC Testing at JPL, July Probes 3 and 4 Prepare for Thermal VacuumProbe 2 and PC get boxed up Probes 1 and 5 are Spin-Balanced and Magnetically Tested

SWT Overview 11 UCB, Nov15/16, 2006 Probe & PC Status ProbeTesting at JPL, July 24-Aug Probes 3 and 4 Removal from TVProbes 3 and 4 Transport to SAF Probes 3 and 4 Arrive at SAFProbes 3 and 4 Mag Testing

SWT Overview 12 UCB, Nov15/16, 2006 Probe & PC Status Probe Testing at JPL, thru Aug Probes 1 and 5 Removal from TV Probes 1 and 5 Transport to SAF Probe 1 on Rollover Fixture for ESA \ Probes 1- 5 at Rest in SAFFinal Balance

SWT Overview 13 UCB, Nov15/16, 2006 Probe & PC Status Probe Testing at JPL, thru Aug Probes 1 and 5 Removal from TV Probes 1 and 5 Transport to SAF Probe 1 on Rollover Fixture for ESA \ Probes 1- 5 at Rest in SAF

SWT Overview 14 UCB, Nov15/16, 2006 Probe & PC Status EFI Preamp Current Issue (PFR181a)  Historic Current Variations in EFI Preamps 3-10mA  PreShip Review Team Requested More Tests  Extended Vacuum Testing on FM6 hit 20mA (red limit)  Determined Reversed Polarity Caps (on silkscreen)  Manufacturer Allows 10-15% reverse bias  EFI Preamps Use 20% reverse bias  Lifetime severely limited in reversed polarity.  Expected to fail prior to primary mission.  Replace all EFI Preamp Caps in proper orientation  Verify No Other Caps Reversed Probes 1- 5 at Rest in SAF

SWT Overview 15 UCB, Nov15/16, 2006 Probe & PC Status EFI Preamp Repair Plan UCB-NASA Meeting to Gain Concurrence Build/Qualify New Stands Remove Solar Arrays Remove SPBs Remove AXBs  Remove Preamps  Replace Caps with proper orientation  Preamp Electrical  Conformal Coat  Reassemble SPB and AXB  SPB and AXB Electrical Functional  SPB and AXB Vibration Tests  EFI Functional using FM6 IDPU  Install AXBs  Install SPBs  EFI Functional (Probe Level)  Install Solar Arrays  Probe Functional Probe 1 on Rollover Fixture for ESA \ Probes 1- 5 at Rest in SAF

SWT Overview 16 UCB, Nov15/16, 2006 Probe & PC Status EFI Preamp Repair – Removal of SPBs and AXBs Probe 1 on Rollover Fixture for ESA \ Probes 1- 5 at Rest in SAF

SWT Overview 17 UCB, Nov15/16, 2006 Milestones Ahead

SWT Overview 18 UCB, Nov15/16, 2006 Reviews Ahead