6.11 Case: Wadi Labka – What to Do When Traditional System Becomes Unsustainable.

Slides:



Advertisements
Similar presentations
1) Explain how each method works … 2) give good points & bad points of each strategy 3) Give viewpoints of different groups of people 4) Consider whether.
Advertisements

6.5 River Stability and Bank Protection John Ratsey
6.3 Sediment management options
6.6 Canals and Command Area Structures. (1) Canals in Spate Schemes  traditional systems are diverted to short, steep canals in the upstream areas (with.
1.3Economic Costs and Benefits. Spate irrigated areas are often among the poorest areas in a country and therefore require special attention.
Objective 1: Explain soil erosion.
The long profile of a river
Parts of a River Eric Angat Teacher. A watershed is at the highest points on the landscape, it supplies water to the river. 1. What is a watershed?
CASE STUDY OF WADI LABA AND WADI MAI ULE (ELWDP – ERITREA) Lesson 5
BANK PROTECTION AND WADI TRAINING Lesson 2
New Orleans’ Levee Failures Chalston Layacan Elizabeth Lenker Jamie Mellies.
Module 1 : Understanding the Wadis John Ratsey
Interest Approach Where have you seen erosion?
G.C.S.E Controlled Assessment An investigation of river erosion along a chosen stretch of river.
6.4 Improving Diversion Works
SPATE ENGINEERING GASH RIVER - SUDAN Lesson 4
Sediment transport in wadi systems
SOCIAL AND ENVIRONMENTAL BENEFITS OF SPATE IRRIGATION DEVELOPMENT 1.5.
CASE STUDY: SHEEB FARMERS ASSOCIATION, ERITREA 2.3.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Sediment Transport in Wadi Systems Part 1: Overview
Sediment transport in wadi systems Part 3 - Sediment management structures and canal design
Module 2 (part 1) Improving Diversion Works John Ratsey
CASE: HADRAMAWT IMPROVED TRADITIONAL ENGINEERING 6.6.
1.6 Experience and challenges of spate irrigation projects in Tigray (By Demisew Abate)
Key Questions for Understanding Surface Water Section 9.1.
SPATE IRRIGATION IN PAKISTAN
Section 13.1 Streams and Rivers
Longitudinal profile Fluvial/River- Areas The path the river follows from its source to mouth is known as the river's course. When studying rivers we.
6.7 Improved Traditional Systems
Landforms Jeopardy ErosionMap-reading Skills Stream TablesBodies of WaterMystery Round
2.2 Spate water rights and distribution rules. This is Anambar Weir, Balochistan (Pakistan) What happened here?
3.1 Participatory Design. WHY PARTICIPATORY DESIGN?  To understand and agree priorities and make the best design for the system accordingly  To tap.
Let’s Find Out!. Erosion is the process by which the surface of the Earth gets worn down. Erosion can be caused by natural elements such as wind, rain,
Three Gorges Dam China By: zach russell.
6.12a DESIGN APPROACH ON BILILO SPATE IRRIGATION PROJECT Presented by Eyob Yehayis.
4.3 Groundwater management in Spate Irrigation Systems.
SPATE IRRIGATION GLOBAL TRENDS 1.1. Spate irrigation – globally In addition there is small spate irrigation in Ethiopia, Kenya and West Africa Spate irrigation.
UNIT 4 CANAL IRRIGATION. DEFINITION canal usually draw their supplies from rivers.they are not provided with any headwork for diverson of river water.
Unit 1.3B_4 River Landforms. Now you know a bout the processes that enable the river to change What does the river look like?
Chapter 2: The Flow of Freshwater. Draw the water cycle diagram in your daybook and label it in your own words. p.41 in your text.
Soil Erosion. Objective 1: Explain soil erosion.  What is soil erosion?  I. Soil erosion is the process by which soil is moved.  As soil is eroded,
River Characteristics
6.9 Case: Hadramawt Improved Traditional Engineering
1.2 Typology of spate irrigation systems
CASE: SOIL BUNDS IN PAKISTAN
INVESTIGATING RIVERS.
6.12b Belilo Spate Irrigation System
Improving Diversion Works
CASE STUDY: SHEEB FARMERS ASSOCIATION دراسة حالة: جمعية مزارعي شيب
Soil Conservation.
6.2 Sedimentation Issues: Overview
6.1 BASIC ENGINEERING New ‘modernised’ diversion structures have promoted larger inequity in the distribution of irrigation water between upstream and.
The Work of Streams.
UNIT 8 CANAL HEAD WORKS SANDEEP LECTURER IN CIVIL ENGG. GP MEHAM.
Gradient The land surrounding the river channel. Valley The middle section of the river. Upper Course The steepness of the river. Mid Course The part of.
1ST YEAR OF ESO RIVERS PROFESOR TIERNO GALVÁN SECONDARY SCHOOL.
Earth and Space Science
ECONOMIC COST AND BENEFITS
The Flow of Freshwater.
6.8 Case - ‘River Engineering Approach’ Wadi Labka – Gabion/ Soil Diversion Spurs.
2.2 Spate water rights and distribution rules
GROUNDWATER MANAGEMENT IN SPATE IRRIGATION SYSTEMS
IMPROVED TRADITIONAL SYSTEMS
BASIC SEDIMENT TRANSPORT AND RIVER MORPHOLOGY
SPATE WATER RIGHTS AND DISTRIBUTION RULES
Field water distribution
What is soil erosion? Soil erosion is the process by which soil is moved. When soil is eroded, it may become pollution in the water or air. The land where.
FIELD WATER DISTRIBUTION
Presentation transcript:

6.11 Case: Wadi Labka – What to Do When Traditional System Becomes Unsustainable

Wadi Labka (En-River), Eritrea Wadi Labka Gorge

Flow is divided in the riverbed  Scan of Map Riverbed downstream of gorge Three main command areas Flow

Traditional method of diversion Combination of earthen bunds protected with acacia brushwood and natural vegetative bunds (tamarisk)

Vegetative bunds not always protected

Increasingly difficult to find acacia shrubs for the traditional bunds Haulage may take more than three days

What to do in this area?  The traditional system is becoming gradually non-sustainable.....  There is a gorge yet the river widens out considerably  There are command areas on either bank of the river

Discussion in groups...

In the end..  An ‘improved traditional system approach’ was followed - in this case focussing on river engineering rather than the development of a headworks>>>>>>

Construction of agims with bulldozer and gabions  Replacement of upper section of the traditional agims with soil bunds and gabions  Gabions at section where flood channel hits the diversion bund  Flood protection on left bank to prevent further movement of Wadi Labka to the left Agim = Traditional diversion bund

Construction of agims with bulldozer and gabions

Labor for gabion filling provided by farmers without charge

Wall of gabion baskets with earthen protection Another layer of gabions will be added and the earth bund will be increased Use of geotextile will reduce wash out of fine material at the bottom and prevent collapse

Scope of work  1200 meter gabion works  120 days of bulldozer use  Total costs USD 430,000  Total cost/ ha USD 110

This may be compared with a civil engineering approach that was considered earlier Headworks (incl. breaching bund) Single off-take Link canal and culvert, estimated at USD 7,000,000 (or USD 1800/ha) for the same system

River engineering versus headworks approach  This ‘river engineering’ approach taken is lower cost. The headworks option in fact was dropped earlier as being too costly  In this case the river engineering approach was also more appropriate than the headworks approach:  It follows the traditional system of diverting flood flows, based on splitting the flow in smaller proportions to make its management easier  It follows the existing water rights and does not interfere with it  Very large floods will wash out part of the structures but will also ensure that the floods remains in the river bed and does not enter the command area, causing erosion