Lunar Exploration Transportation System (LETS) MAE 491 / 492 2008 IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.

Slides:



Advertisements
Similar presentations
Space Exploration Mars Rovers, Apollo program, Voyager satellites, and SETI All Presented by the Peter C Period: 2 (two) As in 1+1=2 Or 2x1=2 ®
Advertisements

LETS Phase 3 Review 4/29/08. Agenda Team Introduction Daedalus Concept Concept of Operations Subsystem Overview Daedalus Performance Daedalus Vision Public.
Mars Pathfinder Mission Breakthrough on the Surface of Mars.
Jose Castellano, Daniel McNeel Dr. Paul Higbie, Dr. Boris Kiefer Department of Physics i160.photobucket.com/.../shs_moonWater-1.jpg.
Modern Exploration Global Surveyor.  Objectives:  High resolution imaging of the surface  Study the topography and gravity  Study the role of water.
The Lunar Reconnaissance Orbiter NASA’s Next First Step To The Moon Noah E. Petro NASA Goddard Space Flight Center May 12 th, 2009.
Payload Site One Upon landing, the LOW prepares for single-site goals and multi-site goals. A drop-box is prepared for single-site goals utilizing various.
A Polar Volatiles Laboratory A. Smith, R. A. Gowen, I. A. Crawford Shackleton Crater ESA Smart-1.
MAE 491/492 Integrated Product Team Design Examples Bringing the Real World into the classroom.
The Lunar Reconnaissance Orbiter (LRO) is the first mission in NASA's Vision for Space Exploration, a plan to return to the moon and then to travel to.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
Project X pedition Spacecraft Senior Design – Spring 2009
Settlement Site Selection and Exploration Through Hierarchical Roving Gregory Konesky SGK Nanostructures, Inc. Rutgers Symposium on Lunar Settlements Rutgers.
Autonomous Landing Hazard Avoidance Technology (ALHAT) Page 1 March 2008 Go for Lunar Landing Real-Time Imaging Technology for the Return to the Moon Dr.
Mars Exploration By Jacob Stinar. Water on Mars.
Mysteries of Earth and Mars Mars Facts and Exploration.
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
LCROSS Our next mission to the surface of the Moon. Developed and managed by NASA Ames Research Center in partnership with Northrop Grumman. Goal: to.
National Aeronautics and Space Administration Introduction to Lunar Excavator Senior Design Project Mission Objective: Design a excavator to dig lunar.
Alternatives Concepts White Paper IPT 02E. Project Management The University of Alabama Huntsville Team LeaderEddie Kiessling StructuresNathan Coffee.
Engineering Means having to deal with failure Missions to Mars as an example of try, try, try again…
LETS Phase 3 Review 4/29/08. Agenda Team Introduction Daedalus Concept Concept of Operations Subsystem Overview Daedalus Performance Daedalus Vision Public.
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
Mars Exploration Rovers. SpiritOpportunity Mars Exploration Rovers  Launch: June 10, 2003  Landed on Mars: January 4  Location: Gusev Crater  Planned.
1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08.
Lunar Drilling and Driving Carnegie Mellon December 2007 Red Whittaker.
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
Alternatives Concepts White Paper IPT 02E. Project Management The University of Alabama Huntsville Team LeaderEddie Kiessling StructuresNathan Coffee.
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
Final Report on LOW Design Maximizing Science While Minimizing Single Point Failure.
LETS Phase 3 Review 4/29/08. Agenda Team Introduction Daedalus Concept Concept of Operations Subsystem Overview Daedalus Performance Daedalus Vision Questions.
RASC-AL 2010 Topics. TECHNOLOGY-ENABLED HUMAN MARS MISSION NASA is interested in eventual human mission to the Martian surface. Current Mars design reference.
What happened to the Mars Climate Explorer in September 1999? By Leslie Palomino.
USGS DIGITAL TERRAIN MODELS AND MOSAICS FOR LMMP M. R. Rosiek, E. M. Lee, E. T. Howington-Kraus, R. L. Fergason, L. A. Weller, D. M. Galuszka, B. L. Redding,
Juno Mission To Jupiter NASA New Frontiers Program Launch Date: Aug. 5, 11:34 a.m. EDT Launch Period: Aug. 5 – 26 (~60 min window) Launch Vehicle: Atlas.
Lunar Exploration Transportation System (LETS) Customer Briefing LETS go to the Moon!
Mars Exploration Rover Science Goals Determine whether Life ever arose on Mars Characterize the Climate of Mars Characterize the Geology of Mars Prepare.
Turin. ALTEC. DESCENT MODULE AND SURFACE PLATFORM ExoMars Science Working Team
Interlude  Viking mission operations ended in the early 1980s  Viking missions gave scientists the most complete picture of Mars to date. What does this.
LETS Phase 3 Review 4/29/08. Agenda Team Introduction Daedalus Concept Concept of Operations Subsystem Overview Daedalus Performance Daedalus Vision Questions.
Spacecraft Dimensions 1.06 meters (3.5 feet) tall by 3.6 meters (12 feet) wide. Spacecraft Weight Total: 576 kg (1,270 pounds) Lander: 290 kg (639 pounds)
LuNet Integrated Network Architecture for Sustained Human and Robotic Exploration Gary Noreen Telecommunications Architect Communications Architecture.
PTAR Presentation Jonathan DeLaRosa, Jessica Nelson, Ivan Morin, JJ Rodenburg, & Tim Stelly Team Cronus.
By: Ashley Baer. Basic info  Name: mars rover  Date: left December 4 th 1996  Landed July 4 th 1997  It landed on mars with airbags.
LETS Phase 2 Review 3/6/08. Agenda Team Introduction Overview of Design Process Initial Mass and Power Budgets Trade Tree and Trade Study Concept Overviews.
Lunar Exploration Transportation System (LETS) Team Frankenstein Phase 2 Presentation 3/6/08.
Wayfarer Ryan Stelzer Dr. David Gaylor April 16 th, 2016 Arizona Space Grant Symposium.
Is there Ice on the Moon? Presentation to the Haggerty School March 29 th, 2005 Source: aerospacescholars.jsc.nasa.gov.
Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein.
Mission: Moon!. What is it like on the Moon? Length of Day Atmosphere Temperature Water Radiation Gravity Landscape.
Ice At the Moon - How the Moon Mineralogy Mapper on Chandrayaan-1 Will Help Noah E. Petro NASA Goddard Space Flight Center March 4 th, 2009.
Mars and Curiosity Rover
Early Exploration Mariner 3 & 4
LETS Phase 3 Review 4/29/08.
Lunar Exploration Transportation System (LETS)
Payload and Mobility Measure 15 samples in the dark and 5 samples in light. The Viking Lander did not move, but it used an SSRA with a boom, collector.
Daedalous Payload Basic Requirements for Single Site Science Box:
Lunar Exploration Transportation System (LETS)
Lunar Reconnaissance Orbiter Camera
Modern Exploration Mars Odyssey
LETS Phase 3 Review 4/29/08.
Lunar Descent Trajectory
Structure and Atmosphere
Hayabusa 2 Arrives at Ryugu
Lunar Exploration Transportation System (LETS)
ISO View Stereo Imaging Belly Cam GN&C
Final Report on LOW Design
Communications Rover Penetrators Parabolic Dish Reflector
Chang’e 5 Mission Chinese Lunar Exploration Program (CLEP)
Presentation transcript:

Lunar Exploration Transportation System (LETS) MAE 491 / IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein Final Review Presentation 4/29/08

Team Disciplines The University of Alabama in Huntsville –Team Leader: Matt Isbell –Structures: Matthew Pinkston and Robert Baltz –Power: Tyler Smith –Systems Engineering: Kevin Dean –GN&C: Joseph Woodall –Thermal: Thomas Talty –Payload / Communications: Chris Brunton –Operations: Audra Ribordy Southern University –Mobility: Chase Nelson and Eddie Miller ESTACA –Sample Return: Kim Nguyen and Vincent Tolomio

Agenda Project Office Systems Engineering The Need The Requirements The Solution Performance Operations Structures GN&C Communications Payload Power Thermal Risk Management Conclusions Closing Thoughts Questions

Project Office

Systems Engineering

The Need Only 6% of lunar surface explored – Apollo missions Only orbital visits since Apollo –Galileo 1990, 1992, Clementine 1994 Lunar Topography & multispectral imaging of surface – water at poles –Lunar Prospector 1998 – 1999 Global surface contents– hydrogen at poles Lunar geochemistry – iron, thorium, and other elements An in-situ, mobile, lunar laboratory with return capabilities is vital to the exploration and understanding of the lunar surface The lunar surface is an unexploited record of the history of the solar system Need to sample polar sites and crater floors

The Requirements Launch vehicle - Atlas V – 401 EPF –Landed mass 997.4kg Launch Date September 12, 2012 Propulsion –159.5 kg of hydrazine (N2H4) propellant 2 Spherical tanks 0.55m in diameter –2.0 kg of helium 2 Spherical tanks 0.4m in diameter –2 MR-80B monopropellant liquid rocket engines –12 MR-106 monopropellant thrusters Survivability –Temperature range -153°C to 107°C –Launch g-loads –Radiation –Micrometeoroid flux Surface Operations –15 permanently dark sites, 500m apart –5 lighted sites, 500m apart –Land on 12° slope –must land within 100m ± 3 sigma of intended landing site –Control starts 5km from lunar surface

The Solution

Performance

Operations

Launch - September 30, 2012 Arrive at moon - October 6, 2012 Operations start 5km from lunar surface October 8, 2012 –Decent Shoot 15 penatrators into Shackleton Crater for dark region sampling –Landing Drop off “single site box” to accomplish single site goals October 9, 2012 –Rove to rim of Shackleton Crater October , 2012 –Receive all data from penatrators October 19, 2012 –Relay all data from penatrators to LRO for transmission to Mission Control 5 orbits needed

Operations October 22, 2012 – March 4, 2013 –Rove to, collect and relay data from 29 lighted sites March 5 – March 7, 2013 –Rove to, collect sample, and launch SRV March 8 – July 22 –Rove to, collect and relay data from Lighted sites July 23 – 25 –Rove to rim of Shackleton crater July 26 – September 27 –Rove to, collect and relay data from Dark Sites (if penatrators fail) September 30, 2013 –System Shut Down

Operations Cyclops Penetrators 2.5km.325km 1.6km

Structures

GN&C Decent/Landing –A LIDAR system will be used to control, navigate, and stabilize while in descent Post Landing –An operator at mission control will manually navigate lander/rover A Surface Stereo Imager (SSI) periscopic, panoramic camera will be used to survey the lunar surface, provide range maps in support of sampling operations, and to make lunar dust cloud measurements

GN&C Descent Imaging –A Mars Descent Imager (MARDI) will be used to view the both the penetrator dispersion and the landing/descent of the Cyclops Processor –A BAE RAD750 will be used for all controls processing

Communications Rover –Parabolic Dish Reflector Antenna (PDRA) T-712 Transmitter –Communication Bandwidth : X-band –Data Transmission Rate: 150 Mbps Data Storage Capacity: 10 Gb Penetrators –Omnidirectional Antenna Communication Bandwidth: S-band Data Transmission Rate: 8 Kbps Data Storage Capacity: 300 Mb

Communications/Payload Single Site Box (SSB) –Determines lighting conditions every 2 hours for one year, micrometeorite flux, and assess electrostatic dust levitation –Omnidirectional Antenna Communication Bandwidth: S-band Data Transmission Rate: 8 Kbps Data Storage Capacity: 1Gb –Surface Stereo Imager (SSI) –Mass: 10 Kg –Dimensions: 155x68.5x35.5 cm –Power: Solar Panel

Payload Gas Chromatograph Mass Spectrometer (GCMS) –Performs atmospheric and organic analysis of the lunar surface –Mass: 6 Kg –Dimensions: 10x10x8 cm –Power: Rover Surface Sampler Assembly (SSA) –Purpose is to acquire, process and distribute samples from the moon’s surface to the GCMS –Mass: 15.5 Kg –Dimensions: 110X10X10 cm –Power: Rover

Payload Penetrators (Deep Space 2 ) –Mission’s main source of data acquisition in the permanent dark regions –Mass (15 Penetrators): Kg –Dimensions: 13.6Dx10L cm –Power: 2 Lithium Ion Batteries Ea. Miniature Thermal Emission Spectrometer (Mini-TES) –Objective to provide measurements of minerals and thermo physical properties on the moon –Mass: 2.4 Kg –Dimensions: 23.5x16.3x15.5 cm –Power: Rover

Power RTG –TRL9 –Constant power supply –Thermal output can be utilized for thermal systems Lithium-Ion Batteries –Commercially available –Easily customizable –Rechargeable Solar –Used for Single Site Box –Conventional –Increasingly efficient in well light areas POWER SUBSYSTEM Type (solar, battery, RTG)Solar, Lithium-ion, RTG Total mass47.63 kg Total power required W Number of solar arrays1 Solar array mass/solar array1.13 kg Solar array area/solar array0.12 square meter Number of batteries2 Battery mass/battery3.25 kg Number of RTGs1 RTG Mass/RTG40 kg

Power Power Analysis ComponentSubcomponentsConsumption (W) Mobility SRV 25 GN&C Payload 34.6 Communications 70.8 Thermal 55 Operations 0 Power Supply 865 RTG400 Li-ion Battery455 Solar Cell10 (Not in Total) Minimum Totals Contingency Supply33% Total 855 Total Power Required – W Peak Power –Mobility W –Data Collection/Transfer W –Single Sight Box 7.8 W RTG –400 W Lithium-Ion Batteries –455 W for both Solar Cells –10 W (SSB - Not included in Total) 33% Contingency Power Total Power Supplied to Lander –855 W

Thermal

Conclusions

Risk Management

Closing Thoughts We would like to thank you for this great learning opportunity. IPT introduced a real-world, working environment for us to learn and work as a team to meet a customer's requirements which is something that can not be taught in the classroom. We appreciate your contribution in our education and enthusiasm to instruct us on how to become more productive engineers.

Questions