Southern Coal Fields Outburst Seminar

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Final Competence Assessment Assessment Documents Assessment strategy (SummitSkills) Assessment methodology (SQA) Assessment guidelines (SQA)
Health & Safety Induction Health & Safety e-learning: Health & Safety Induction Course.
NO LIVE AMMUNITION IN THE CLASSROOM!
The Post-Blast Inspection
Better together... we deliver SASOL CHEMICALS BASE CHEMICALS (EXPLOSIVES) MOSH - "Day of Learning" 2014.
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
Positioning a shotfiring shelter
Welding, Cutting, and Brazing
San Bernard Electric Cooperative, Inc. Arc Flash Assessment.
The Hidden Hazards in Non-Coal Mining Nick Hardie C.Eng. EUCOSH workshop , Beijing.
A view on mechanisation Declan Vogt “Day of Learning” on “Value Added Drilling and Blasting Practices”
Explosives and Explosions
Safe Working Procedure – Confined Spaces
OUTBURST SEMINAR Work Force Perspective Management of Outburst Potential Southern District.
An Emergency Response Training Program for the DG Transport Industry
Blasting Fundamentals ©Dr. B. C. Paul 2000 Note – The slides that follow present the author’s summary of knowledge commonly held by people well studied.
Permit Required Confined Space Entry Permit Required Confined Space Entry.
Permit to Work Procedure Document Number: KOC.SA.004
COMPETENCY CERTIFICATION WITHIN THE INDUSTRY Hazardous Area Standardisation - A case study from Australia 3 What is Competency Competency comprises the.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
Tools, Fire Extinguishers and Explosives Section E of the Forest Activities Code.
Process Safety Management
Characteristics Of an Explosion.
Blasting Regulations Regulatory Requirements for Blasting Operations.
1 HAZARDOUS MATERIAL IDENTIFICATION SYSTEM. 2 A TRAINING PRESENTATION OF THE BRUNSWICK HILLS POLICE DEPARTMENT.
Final Rule SEALS April 18, Overview § Seal Strengths, Design Applications, and Installation § Seal Strengths, Design Applications,
Safe Operation of Storage Tanks: Decommissioning and Repair
RISK ASSESSMENT AND MANAGEMENT
Blasting in Underground Bituminous Coal Mines Pennsylvania Bureau of Deep Mine Safety.
Mobile Audio/Video Recording Equipment Policy and Procedure Number PP
Practical Use of the IECEx System & Schemes John Francis Waudby Senior Inspector of Electrical Engineering Mine Safety Operations.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
AMERICAN COAL MINE SAFETY
Specific inspection issues in the non-coal mining sector Peter Roedel WORKSHOP ON WORK SAFETY RESPONSIBILITY SYSTEMS WITHIN OSH INSPECTION SYSTEMS 15 –
Designing Basic Blasting Shots Part II ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Laboratory Laboratory (29 CFR ) (29 CFR ) Standard Hygiene Hygiene.
MNM Fatal Explosives Accident Explosives Accident September 7, 2011 (Alaska) September 7, 2011 (Alaska) Gold Mine Gold Mine Miner Miner 30 years.
FLYROCK Flyrock is the propelling rock from the blast area. Leading cause of fatalities and equipment damage.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Grady L. Hunt Locklear, Jacobs, Hunt & Brooks (910) The information contained in this presentation is intended for general.
Danger Zone Control and the Duties of Sentries Guidance on how to ensure control of the danger zone and what is expected from sentries. Quarries Working.
Russell Thomas Gas Drainage Coordinator – Appin Colliery November 2014
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Grunching Through Potential Outburst Zones Jack Borg – Tahmoor Underground Colliery.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
The two types of electricity used in mining are: “AC” or alternating current and “DC” or direct current.
MNM Fatal Explosives Explosives December 4, 2013 (Kansas) December 4, 2013 (Kansas) Crushed Stone Mine Crushed Stone Mine Lead Man Lead Man 63.
Electronic Detonators
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Working Safely Near Power Lines NOVA SCOTIA ASPHALT USER PRODUCER ASSOCIATION.
Health and Safety Executive Health and Safety Executive The Regulatory Framework for UCG– HSE’s perspective Tony Almond Redacted Health and Safety Policy.
The School of Mechanical and Mining Engineering All of School OH&S Meeting October 2014.
Excavation & Trenching Awareness Plus
CALL/WHATSAPP
CONTROL OF HAZARDOUS ENERGIES (LOCKOUT / TAGOUT)
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Characteristics Of an Explosion.
Regulatory Requirements for Blasting Operations
Explosives Items of Interest
Most Frequently Cited Serious Violations
Changes to DSR Procedures 2018/1
F&S.
Oleh : Ir. Sjaifuddin Thahir, MSc.
Regulatory Requirements for Blasting Operations
Emergency Action Plans
Drilling and Blasting Toolbox Talk : 07 Updated Oct 2015
Target Audience Shotfirers and Explosives Supervisors.
Target Audience Shotfirers and Explosive Supervisors.
Presentation transcript:

Southern Coal Fields Outburst Seminar Shotfiring Training Alan Phillips

Agenda Background on shotfiring, grunching and explosives in underground Coal Mines Shotfiring Legislation including Licencing Shotfiring training for Deputy & Undermanager candidates Practical exercises using a Shotfiring training Model in the class room environment.

Shotfiring in the Southern District Coal mining has a long history of mining coal with explosives particularly prior to mechanization during the 1940’s. All Mines in the Bulli seam carry out a considerable amount of shotfiring, mainly in stone - excavating for overcasts, conveyors, workshops and Intrusions

Grunching The term used for mining a roadway in coal with the use of explosives by blasting of the solid, ie no slot or undercut (Only one free face ) It is a method of mining coal remotely which is a mandatory requirement if above threshold coal is to be mined where gas drainage has not drained in an area effectively using traditional methods. Structures Tight coal

Why is training important? Shotfiring like any process in underground mines can be hazardous. Safe operating procedures, safe and fit for purpose equipment and competent well trained personnel ensure that hazards and risks from shotfiring are well managed and conducted safely. A proper designed, drilled, loaded and fired round results in very little risk

Explosives – What are they? They are chemical compounds initiated by shock, heat or impact. They transform rapidly, releasing heat and (mainly) high pressure gases They create a stress wave and exert pressure. Deflagrating (notably black powder) High (permitted and non-permitted) Initiating (notably PETN and ASA)

Senatel 1000 Sentatel 1000 explosives are widely used in underground coal mines a P1 explosive only approved for use in stone Cartridge emulsion high explosive VOD – 4200 metres /second Very safe and stable compared with the old nitro glycerin based explosives – low sensitivity but very high energy Low explosives <2000 metres per second High explosives >2000 metres per second Initiating explosives = 5000m to 7500m

Detonating an explosive Carrick II Detonators are low incendive, short delay detonators approved for use in underground coal mines. They are an electric delay detonator, containing a sleeved fusehead, a delay element (except for 0 delay), a priming composition and a Tetryl base charge inside a cylindrical copper shell. They have very high sensitivity to impact.

Carrick Detonators How many milliseconds in a second?

Approval Process – P1 in coal Risk Assessment - MDG1010 Independent review Risk assessment and Control measures 2 weeks notice - Chief Inspector or Delegate Safety file containing risk assessment, review document, vent plan and other details

Shotfiring Training 2 Units of Competency Support Shotfiring – minimum pre-requisite OR Conduct Shotfiring – required for Blasting Explosives User Licence (BEUL) – Shotfirer Certificate IV in Underground Coal Operations (Deputy) Dip of Underground Coal Mining Management (Undermanager) Adv Dip of Underground Coal Mining Management (Manager)

Shot Firing Training The main difference between the units of competency is that Conduct shotfiring has: more information of Blast hole patterns and designs requires log book evidence of assisting in the firing of at least 3 shots Both units will contain information on grunching

Shotfiring Training Course Class room environment A lot of good information A lot of PowerPoint slides Videos, but all are hard rock blasting and open cut Learners receive the class room presentations, a copy of the notes, a study guide and are given a assessment to complete and return for marking

Key learning points Identifying hazards and risks Shotfiring operations – Explosives Management Plan Shotfiring procedures Ensure the area is thoroughly stonedusted Maintain housekeeping and standards Ensure Holes are drilled to the authorised plan Flush, clean and test holes Loading and stemming

How do we do this in the classroom? Practical Exercises Test a blast cable Test for breaks in shot holes Make up primers Load and stem Test the circuit Deal with issues

Testing a blasting cable Open circuit test Closed circuit test

Examine Blastholes A shothole shall not be charged unless it has been tested with an approved break detector and found to be free of breaks.

Components Training detonators and primer

Training Detonators – Contains No Explosives

Making up the Primers Primers must not be made up until immediately before charging commences.

Making up the primers

Version 1 of the Shotfiring Model

In the workplace – Face drill ready to fire

Shotfiring Plan for Training Model

Drilling Plan for Training Model

Working out the Wedge for the model

Under construction - to scale

Installing the shotholes

Training Model 1 metre = 5 meters 600 millimetres = 3 meters

Conclusion - Practical Training With the Model, PowerPoints, Learner Guide and the whiteboard the trainees can better learn the processes including Loading and stemming the round. Testing the round. Dealing with problems Understand the process 3 ways, Seeing Reading Doing Before exposure in the workplace

Any Questions ? Thank you