Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.

Slides:



Advertisements
Similar presentations
Application samples All rights reserved, property and © CAD Computer GmbH & Co. KG 2009.
Advertisements

Dmitrii Mausuzenko, Oleg Maev (PNPI)
March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
Workshop 5 Centrifugal Pump
Module 4: Analog programming blocks. Module Objectives Analyze a control task that uses analog inputs. Connect a potentiometer to LOGO! controller and.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
1 Gas processes in OTP straw  Questions: HV limit SQS mode Gas gain ??? Location- O:\Data\Osotr1\Presentation3.ppt and O:\Data\Osotr1\chargestudy.ps V.
PERFORMANCE OF THE DELPHI REFRACTOMETER IN MONITORING THE RICH RADIATORS A. Filippas 1, E. Fokitis 1, S. Maltezos 1, K. Patrinos 1, and M. Davenport 2.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Plans for the Muon Gas and Cooling Systems LHCb infrastructure workshop February Burkhard Schmidt, with important input from Roberto Guida and Beatrice.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
Speed of Sound Experiment Pre-CDR Team BalloonWorks.
1 Alhussein Abuhoza, S. Biswas, U. Frankenfeld, J. Hehner, Ch. Schmidt GSI, Darmstadt, Germany and H.R. Schmidt University of Tübingen, Germany Study of.
OPC Data Logger Start Up Instructions. OPC Data Logger For most experiments run in DPCL, data is analyzed from graphs. All process variables shown on.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
Design of a Computer Controlled Test System for Micro-Electro-Mechanical-Resonator (MEMR) Based Gas Sensor Presenter: Joshua Ward Co-Author: Robert MacKinnon.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Function-Builder 1.1 Fact-Function- Builder Manipulating the Equilib results.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
LHCb F. Murtas Servizio elettronica G. Corradi D.Tagnani P.Ciambrone HV_GEM per LHCB M1R1 HV power supply Introduction Introduction HV_GEM Technical specification.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Summer Updates- Summer Student Report Emine Altuntas Stephen Fee Supervisors: Mar Capeans, Ivan Glushkov, Roberto Guida Gamma Irradiation Facility.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Systematic studies on the rate capability of MWPC operated in Xe/CO 2 D. Gonzalez-Diaz for the CBM-TRD group March, 2008.
Simulating the Effects of Wire Sag in ATLAS’s Monitored Drift Tubes Ashley Thrall, Vassar College ‘04 Dan Levin, Mentor REU Presentations August 5, 2004.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
This study has been performed with an apparatus consisting of two identical standard MWPCs, a clean gas system, an outgasing box, a Copper X-ray generator.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Report on the Commissioning Task Force activity Global and sub-detector views on ECS Histogram handling : – histogram handling and PVSS – the ALEPH and.
C++ Basics C++ is a high-level, general purpose, object-oriented programming language.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Status of Mineral Oil R&D 2 nd LSc R&D Group Meeting 2006/07/27 Adil, KNU.
Inventory of radioactive sources present in the cavern at pit 8 Gloria Corti Experimental Area Meeting 05 August 2008.
1 Econometrics (NA1031) Lecture 1 Introduction. 2 ”How much” type questions oBy how much a unit change in income affects consumption? oBy how much should.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
High rate studies of TRD at GSI (update) D. Gonzalez-Diaz, GSI
30 October 2003V.Souvorov / B.Schmidt - MWPC PRR CERN site1 MWPC Aging Studies Outline: Overview of aging tests done Results in terms of gain variations.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
15/6/2006Gaia Lanfranchi - LNF-INFN1 Why do we have to measure efficiencies in the Muon Detector? Muon Software Meeting, June 15th G. Lanfranchi LNF-INFN.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
19/10/11FV 1 Behavior of generic HV channel. Mail’s survey: appeal for general policy VF2 19/10/11 Patrizia: “Based on the running experience of NA48,
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
Long-term environmental effects on the ARGO-YBJ RPC array studied with the Detector Control System P. CAMARRI 1, R. CARDARELLI 1, L. PALUMMO 1, C. VIGORITO.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
1 Alhussein Abuhoza, S. Biswas, U. Frankenfeld, J. Hehner, C. Schmidt GSI, Darmstadt, Germany and H.R. Schmidt University of Tübingen, Germany Construction.
Same geometry, but different size of the rim
Alhussain Abuhozaa,b, S. Biswasb, U. Frankenfeldb, J. Hehnerb, C. J
Design of a Computer Controlled Test System for
Sector 29 PS Systems Stability Tests for LCLS
The IFR Online Detector Control at the BaBar experiment at SLAC
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
Project 1: Brake System Modelling & Control
PecConfig March 17th, 2015 Cathy Ding
Presentation transcript:

Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009

Summary 23/02/2009Gas Quality Checks2 1. Introduction 2. Experimental setup 3. The procedure 4. The software 5. Temperature and Pressure 6. Next steps

Introduction 23/02/2009Gas Quality Checks3  The LHCb muon system is composed of five detection stations with are equipped with Multi-Wire-Proportional- Chambers (MWPC).  The MWPC performances are heavily dependent on the gas gain.  Our purpose was to develop a software that could help us compare the gas gain results from different measurements.

Experimental setup 23/02/2009Gas Quality Checks4 The experimental setup was installed in the UXA zone. The experiment consists in comparing signals from the MWPC produced by a 241 Am source in two configurations, both with the CO 2 /Ar 60/40 gas mixture: 1. the chamber is flushed with gas from the supply line. 2. the chamber is flushed with gas from the return line. The chamber is held inside a wooden box to stabilize the ambient conditions, such as temperature and pressure.

Experimental setup 23/02/2009Gas Quality Checks5  Gas lines and panel The chamber inside the box and de 241 Am source

The procedure 23/02/2009Gas Quality Checks6 CAEN to monitor the high voltage applied on the chamber. Current produced by the radioactive source measured with an OPERA current meter (~1 nA precision). Controlled ambient conditions (temperature and pressure measured). Nine measurements are taken. Two minutes of data are acquired for each value of HV. High Voltage (V) 241 Am Source 2800No 2800Yes 2750Yes 2700Yes 2650Yes 2600Yes 2550Yes 2800Yes 2800No

The procedure 23/02/2009Gas Quality Checks7 Two options for the procedure: 1. From 2550 V up to 2800 V

The procedure 23/02/2009Gas Quality Checks8  From 2800 V down to 2550 V

The software 23/02/2009Gas Quality Checks9  The software for the gas quality checks was written in C++ language and runs in the root.  It is installed in the LHCb control room, which makes possible to acquire the data in UXA zone e analyze it in the control room.  Its inputs are the text files with the data corresponding to the current and voltage plus the text file corresponding to the temperature and pressure.

The software 23/02/2009Gas Quality Checks10  The plots:

The software 23/02/2009Gas Quality Checks11  The output file:

Temperature and Pressure 23/02/2009Gas Quality Checks12  The gain depends on the gas density and therefore on the gas temperature and pressure.  According Diethorn’s formula, for small temperature and pressure variations, the gain variation is: Where α is a constant parameter that depends on the chamber geometrical parameters and on the gas mixture.

The software 23/02/2009Gas Quality Checks13  Checking the points:

Next steps 23/02/2009Gas Quality Checks14  Continue the study of the temperature and pressure variations and how they effect the gas gain.  Make changes in the high voltage values accordingly to the variation of temperature and pressure in order to keep the gas gain constant.