PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
Slide 1 MIPA Progress Presentation For SERENA Progress meeting, Santa Fee, May 2008 Prepared by Johan Svensson and Stas Barabash.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
PACS IBDR 27/28 Feb 2002 Herschel PACS SPU - IAC1 Herschel PACS - IBDR SIGNAL PROCESSING UNIT - SPU - HW Unit, Start-up SW and Low-level SW Drivers José.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
PACS IHDR 12/13 Nov 2003 PACS FPU Mirrors and Black Paint R. Graue, D. Kampf Kayser-Threde.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
Status of the SWAP instrument
Double Star: Experiment Activities
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Peer Review Agenda (Suggested).
GLAST Large Area Telescope
First Article Inspection
GLAST Large Area Telescope
PSS verification and validation
Presentation transcript:

PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher

PACS IBDR MPE 27/28 Feb 2002 System Engineering 2 Development Program Flight Instrument consists of 1 cryogenic FPU, 6 electronics boxes at ambient, 1 set of WIH Development program and verification of Units is taken care by the individual manufacturers For each Unit a dedicated Development and Test Plan (covering all AIV activities) is issued and enforced Qualification program is  On Unit level performed by the individual suppliers of the Unit  On Instrument level performed by MPE Delivery Reviews and Incoming Inspections will be held AIV on instrument level starts with delivery of Units

PACS IBDR MPE 27/28 Feb 2002 System Engineering 3 Instrument Verification 2 documents specify the now starting AIV activities on Instrument Level, they are considered as the in time extension of the basic DDVP PACS-ME-PL-002 Instrument Test Plan, covers all test activities and all test related AIV, shows the verification control matrix w.r.t. instrument models and instrument performance; PACS-ME-PL-012 iss.1 Instrument AIV Plan, describes general assembly organization, integration concept and integration sequences, but does not include the ILT related details; PACS-ME-PL-018 iss.1

PACS IBDR MPE 27/28 Feb 2002 System Engineering 4 Development Status Baseline Design of all Units is ready (results are topic of IBDR) Interface Control Documents issued and under configuration control FPU Thermal Mathematical Model available (results under separate agenda point) FPU Structural Analysis / Load Analysis performed, (results under separate agenda point) FPU contamination risk and degradation analysis done FPU manufacture has started

PACS IBDR MPE 27/28 Feb 2002 System Engineering 5 current IID-B status 15 CRs w.r.t. IID-B 2/0 incl. CR amendments were submitted to Project, more than 50% approved yet, in few cases further clarifications or add-ons required, then approval can be expected Further CRs identified, will be submitted soon or need input from Project before they can be specified (e.g., thermal budget) 1 RFW concerning application of notches during cryogenic vibration submitted, approval under way

PACS IBDR MPE 27/28 Feb 2002 System Engineering 6 Model Philosophy (deliverables to ESA are marked in blue)

PACS IBDR MPE 27/28 Feb 2002 System Engineering 7 Functional Properties of Units delivered to MPE UnitModelDelivery date FPU STM (mass, size, thermal, ext. alignm.) CQM (full repres. of FM, 50% Ge-arrays) PFM (full flight representative) ( ) DPU AVM (functional repres.of FM, FFF) FM (nom and red part) QM (functional repres.of FM) SPU AVM (functional repres.of FM) EM (functional repres.of FM) FM (2 identical boxes nom/red) TBC DECMEC AVM Simulator (supports electrical + S/W performance verification) EM (1MEC+2DEC) QM (1MEC+1DEC, upgrd. requ. for ILT FS) FM (2MEC+2DEC in 1 unit) BOLC/A BOLC Simulator (supports electr.+S/W ver.) QM1 (supports FPU performance verif.) QM2 (full QM) FM

PACS IBDR MPE 27/28 Feb 2002 System Engineering 8 Unit Configurations during ILT Phases

PACS IBDR MPE 27/28 Feb 2002 System Engineering 9 CQM Characteristics compared to PFM FPU CQM is nearly a fully flight representative FPU Unit  Complete optics, all mechanisms, all sensors  Blue spectrometer array: 12 modules of 25  Red spectrometer array: 12 modules of 25  Blue photometer array: 8 sub-arrays (2 near perfo.) of 8  Red photometer array: 2 sub-arrays (1 near perfo.) of 2 Full CQM characterization and calibration program can be executed in principle EMC tests on system level (EQM) quite informative AVM electronics built with commercial grade components, no redundancy, DECMEC, BOLC and SPU are at present not form fit

PACS IBDR MPE 27/28 Feb 2002 System Engineering 10 Pending activities Qualification program of black paint to be finished Qualification program of CERNOX temperature sensors to be performed with assistance from Project few NCRs on FPU issues to be closed Definition of details of test sequences, test steps and procedures for the different ILTs to be started now