5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov.5.2007.

Slides:



Advertisements
Similar presentations
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Advertisements

SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
What’s been Achieved and What’s to be Done K. Yokoya ILC Annual Meeting 2012/12/20 ILC Annual, Yokoya1.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
Operations, Test facilities, CF&S Tom Himel SLAC.
TILC08/Sendai, W. Namkung, March 3, 2008 Message from Asian Linear Collider Steering Committee (ALCSC) Tohoku University Sendai, Japan March 3, 2008 Won.
11 June 07 Fermilab Steering Group 1 ILC Baseline Schedule, Milestones, and Decision points Tom Himel.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Lutz Lilje DESY -MPY- SCRF Infrastructure at CERN? Electron Accelerator R&D for the Energy Frontier Lutz Lilje DESY –MPY-
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
26 Apr. 07 ILCSC-MAC, FNAL Global Design Effort 1 Asian R&D Activity and Resources K. Yokoya KEK ATF/ATF2, STF KEK budget Korea, China, India.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Operation Status of the RF Systems and Taiwan Photon Source
ILC10 Beijing Global Design Effort
ILC-Americas Regional Team Review
Chris Adolphsen Sergei Nagaitsev
S0 Status report from KEK
Oversea collaborators
S1-G Webex meeting Global Design Effort
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Progress in Asia Hitoshi Hayano,KEK,
Status of ATF/ATF2 and machine schedule in this fall
Junji Urakawa ( for collaborators ) March KEK at LNF
IHEP Cryomodule Status
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Presentation transcript:

5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov

5 Nov. 07 CCAST, IHEP Global Design Effort 2 ILC-Related Facilities at KEK ATF/ATF2 Cavity R&D Stand STF #4 building

5 Nov. 07 CCAST, IHEP Global Design Effort 3 ATF Built in 1993, international MoU in 2005 Continue to be a good test bench for ILC-DR Collaboration meeting twice a year Z(May, December) Beam source for ATF2

5 Nov. 07 CCAST, IHEP Global Design Effort 4 ATF Now and Past –Fast kicker development (KEK, LLNL, SLAC, DESY) –Laser wire (RHUL) –Improvement of DR BPM resolution (SLAC, FNAL) –Digital IP feedback system (Oxford, etc) –nm resolution BPM (SLAC, KEK) –Laser-Compton scattering for positron production (ILC ACD) –Fast-ion instability study –CSR measurements Future –Bunch by bunch extraction for ATF2 –1nm vertical emittance Stay here for 2 more days for ATF/ATF2 details

5 Nov. 07 CCAST, IHEP Global Design Effort 5 ATF2 >100 participants from ~25 institutions Miniature of ILC BDS ~35nm beam size, a few nm stabilization Will be one of the BDS Work Packages

5 Nov. 07 CCAST, IHEP Global Design Effort 6 ATF2 Optics Same optics as ILC

5 Nov. 07 CCAST, IHEP Global Design Effort 7 Overseas Contribution Q magnets(28)IHEP, SLAC QBPM(39)PAL, SLAC Power SystemSLAC IPBPMKNU S-band BPMKNU Laser WireRHUL, Oxford Fast feedbackOxford, Daresbury OpticsSLAC, IHEP, KNU, Daresbury Active stabilizationCERN, DESY Not to be complete

5 Nov. 07 CCAST, IHEP Global Design Effort 8 ATF2 Schedule Construction budget peaked in this year Floor refurbishment Jun-Sep this year First beam in fall-winter 2008

5 Nov. 07 CCAST, IHEP Global Design Effort 9 ATF2 Floor Refurbishment Started in June Finished end of Sept. As in the schedule Sep.26 Sep.5 Aug.27

5 Nov. 07 CCAST, IHEP Global Design Effort 10 STF In 3 steps: –STF0.5 : 2 cryostats (4-cavity length) with 1 TESLA-like and 1 LL cavity) –STF1 : Original plan was 4 cavities each. –STF2 : ILC 1-unit STF0.5 –started in Apr. –Original plan to finish in July. –Vacuum leak detected in both TESLA-like side and LL side –A Good lesson

5 Nov. 07 CCAST, IHEP Global Design Effort 11 STF0.5, Now 2 cryostats separated TESLA-like side repaired and being cooled. Under high power test. Leak has not yet identified in LL side Decision in last week –Complete STF0.5 for LL within JFY2007 –Install 4 TESLA-like cavities in parallel Valve box after repair(8/15) LL module separated and moved to surface(8/29)

5 Nov. 07 CCAST, IHEP Global Design Effort 12 S0 S0 cavity exchange program –Plan : 2-3 cavities KEK(LL)  US and DESY  KEK Delay due to –Contamination problem of HPR pump (old system) –STF0.5 too busy –Delay of new EP/VT system 1 LL cavity sent KEK  JLab (September) – 1 st VT done with good results (41MV/m, 2x10^10) Other S0 exchange presumably from Apr.2008 S0 with KEK and foreign cavities is the 1 st priority in JPY2008

5 Nov. 07 CCAST, IHEP Global Design Effort 13 New SC Infrastructure Clean room : already in use UPW (Ultra-Pure Water system): already in use HPR (High Pressure Rinsing system) : completed EP (Electro-Polishing system) : under test. operation from Jan.2008 CP (Chemical Polishing system) : JFY2008. VT (Vertcal Test Stand) : in operation from Jan.2008 EP bed for ILC Clean room HPR UPW(Ultra-pure Water)CP

5 Nov. 07 CCAST, IHEP Global Design Effort 14 Asian Works at STF Cryomudule designIHEP Coupler designIHEP 9-cell cavity fabricationPAL LL single cellIHEP Cold-BPM development PNU Cavity design/processingKNU, PNU

5 Nov. 07 CCAST, IHEP Global Design Effort 15 Next Step : STF1, STF2 STF1 –4 cavities in a module (same cryostat as STF0.5) –Spring- early summer 2008 STF2 : 1 RF unit (as close as ILC design) –1 modulator (can be Marx if in time) –1 klystron (horizontal) –3 cryostats (close to type-4) –Beam (full intensity)

5 Nov. 07 CCAST, IHEP Global Design Effort 16 STF2 (continued) Timeline –Design in JFY2008 essential part of the cryomodule design by summer Schedule may slight depend on STF1 –Construction in JFY Need to select the cavity shape for STF2 –Well before construction (high pressure vessel regulation) –around Mar.2008

5 Nov. 07 CCAST, IHEP Global Design Effort 17 KEK Lab Situation Change foreseen in JFY2009 (Apr.2009-Mar.2010) –KEKB will (nearly) reach its target of integrated luminosity 1 ab -1 in the end of JFY2008 –J-PARC will shift construction period  operation period in ~JFY2009 A New 5-year Plan (Roadmap, ) being formed among KEK directorate, including ILC R&D, KEKB upgrade, ERL(1 st step), Detector development, etc. –STF2 will be the first half of this plan –Hopefully, STF3 in the second half

5 Nov. 07 CCAST, IHEP Global Design Effort 18 STF3 Needed for –Technology transfer to industries –Establish mass production technology Should be based on ILC final design Finish before the ILC mass production start The scale is still to be discussed 3 ILC RF units in the present consideration Requires an extension of the tunnel (downstream of STF2)

5 Nov. 07 CCAST, IHEP Global Design Effort 19 Asian Visitors Statistics Visitors to KEK in JFY2007 (person-day) (incl. plans but those by KEK budget only) –Korea 591 –China 329 –India 180 –Taiwan 90 –Other than Asia 31 More visitors are welcome. We still have visitor budget for ~400 person- day for JFY2007 (till Mar.2007)

5 Nov. 07 CCAST, IHEP Global Design Effort 20 Summary ATF2 going well. Floor done. 1 st beam will be in fall-winter next year. STF0.5 still going on with some delay. To be completed by Mar STF1 to follow. New EP facility & VT will be ready early 2008 STF2 being planned (construction ) KEK is drafting 5yr plan More Asian visitors welcome