FP7-Infra-2011-2.1.1 : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.

Slides:



Advertisements
Similar presentations
European Reanalysis and Observations for Monitoring All partners have contributed to Year-3 work All deliverables submitted except for M36.
Advertisements

Speaker I Organism I adresse mail , June 18/19th I UPMC I Paris JERICO MID TERM REVIEW Wp 11 Management.
One year into multidisciplinary observations Sofia Alexiou, Project Manager National Oceanography Centre, Southampton FixO³ First Year – EuroGOOS 2014,
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Wilhelm PetersenI HZGI 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW WP 3 Harmonizing technological.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
1 23/05/2015 Networking Research Infrastructure NCPs National Hellenic Research Foundation (EKT/NHRF) Project Monitoring & Coordination Unit EuroRIs-NET.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
CLARIS NCT1 Management, coordination and dissemination activities J-P Boulanger (CNRS) and Carlos Ereño (UBA) (CNRS, CONICET, UBA, UR) k To manage the.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
Work Package 6 Interface with policy and intergovernmental bodies Peter M Haugan, Geophysical Institute, University of Bergen.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
Marina Signore e- Frame Project Coordinator Division "Metadata, Quality and R&D Projects", Chief Istat e-Frame “European Framework for Measuring Progress.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
The MyOcean Concept P.Bahurel, project coordinator.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
Pierre Testor LOCEAN, CNRS, Paris, France EuroGOOS Joint ROOS-WG-TT, 04 March 2015, Brussels, Belgium 1km ~2-5km Data Centers Land Station users A “glider”
EPOCA – 11. June EPOCAConsortiumOrganisation.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
S 1 Annual Meeting 2013 Core theme 5 Status and updates Chiara Bearzotti NACLIM project manager.
TIARA kickoff R. Aleksan February TIARA 1.WP2 objectives 2.Deliverables 3.Who does what 4.Organization matters 5.Conclusion
1 ASTRONET Coordinating strategic planning for European Astronomy.
WP2 – Strategy, governance and liaisons EuroVO-ICE– First review – 26 October 2011 Françoise Genova, EuroVO-ICE coordinator,1 WP2 Strategy, governance.
Brainstorm: Ideas for sustainability after ICT-AGRI-2 Antoinette Jordan, Dr Raymond Kelly TEAGASC ICT-AGRI-2 Governing Board meeting, Athens 5-6 October.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
European COstal-shelf sea Operational observing and Forecasting system ECOOP 1. Annual Meeting Athens February 2008 Erik Buch Coordinator.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
A GEO Label: Status, Issues, Next Steps Hans-Peter Plag IEEE University of Nevada, Reno, Nevada, USA;
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
ASTERICS Kick-off meeting 26 May Collaboration Coordination Celebration Rob van der Meer, ASTRON, ASTERICS Project manager.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
WP6 – Monitoring and Evaluation GA Meeting 21/22 January 2016 Partners: UK and Canada.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
ICT Smartcities 2013 FP7-SMARTCITIES-2013 WP6 – Project Management OPTIMising the energy USe in cities with smart decision support system (OPTIMUS) Objective.
1 Internal Integration Strategy - WP8 Gunnar Sand and Ragnhild Rønneberg The University Centre in Svalbard Kick-off meeting GRD
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
AMICI WP1 – Management, coordination and dissemination
UNISEC Universal Influenza Vaccines Secured
INTAROS – Integrated Arctic Observation System
AVA Communication Magda Klimontowska University of Liverpool
WP1 - Consortium coordination and management
Support- IRDiRC Proposed Work Plan And Communication Strategy
FP7-Infra : Design studies for European Research Infrastrutures
Davor Kozmus, MHEST Steering Platform Meeting 29. October 2009, Zagreb
WP2 Governance Per Öster
Overview of working draft v. 29 January 2018
ERA-NET Plus Infravation
EUROPEAN COMMISSION JOINT RESEARCH CENTRE
AMICI WP1 – Management, coordination and dissemination
ANTICORRP ANTICORRP General Assembly Meeting Administrative update
WP 1 Management and Coordination
Presentation transcript:

FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month 18 – month 39) Grant Agreement No: ; Total budget : 3,5 M€ 19 partners from cy, de, fr, gr, it, no, es, uk “Gliders for Research, Ocean Observation and Management” General Assembly

WP1 Project Scientific and Technological coordination UPMC and all partners

WP1 Objectives Ensure the coordination of the project on scientific and technological aspects in conformity with the objectives, methods and quality standards described in the contract (task 1.1) Internal and external communication (task 1.2)

Objectives related to task 1.1 Scientific coordination and monitoring of work- packages The supervision of project progress milestones and project global direction Organize project meetings and internal reviews The scientific review of the work performed by the partners including scientific deliverables Research risk management The preparation of the scientific part of the reports to be submitted to the EC

Work progress task st General assembly: Kick-off meeting in Nov in Paris 4 formal Steering Committee meetings Several informal SC meeting during WPs workshops 1 st periodic scientific report (delayed end June 2013) Risk - contingency action registry established End of 1st reporting period, March First report accepted by the EC 2 nd General Assembly, Trieste, 04-05/06/13 4 formal Steering Committee meetings EGO/GROOM meeting, Kiel, Grant period extension required Detailed review for 4 key deliverables. Still to be done for D5.1 and the final report

Work progress task 1.2 Paper in "International Innovation": Helping marine science reach new depths (Oct. 2012) Editorial in "Sea Technology Magazine": Gliders Evolving to Enhance Ocean Observation (Dec. 2012) Special session at EGU2013 chaired by EGO/GROOM … Ocean Business 2013, Southampton, 09-11/04/13 GROOM at JCOMM-OCG, Silver Spring, USA, /09/13 GROOM at Workshop on Artic and Marine Research Infrastructures, Rome, 17/09/2013 GROOM at EuroGOOS, Brussels, 20/11/13 Special session "Autonomous platforms" at OSM co- chaired by GROOM, 23-28/02/14

Work progress task 1.2 GROOM at OI'14, London, 11-13/03/14 GROOM at 2 nd ICRI, Athens, 02-04/04/14 GROOM at "Landscape of the European Research Infrastructures for Environmental Sciences", Paris, 22/05/14 PLOCAN Glider School, Las Palmas, 14-19/07/14 GROOM at 6th IEEE/OES Baltic Symposium, Tallinn, 26/05/14 Glider demonstration and capacity building in Algeria, Sidi Fredj, 12-16/05/14 EGO/GROOM final meeting, Kiel, 16-17/06/14 and many others …  STRONG REMINDER: Fill "Dissemination activities" page on Vitamib

Work progress task 1.2: Brochure and "Gliderport booklet" Extensive distribution of the brochure by the coordinator (OI'14, ICRI, …) And by the partners (!)  STRONG REMINDER to all to continue  Be reactive to Daniel and Jelto's sollicitation for the booklet

Work progress task 1.2: OI'14 9m2 Booth. Animation by UEA, SAMS, UPMC/CNRS, … 2 (nice) GROOM videos displayed. Can be downloaded from GROOM website for further use More than 150 GROOM contacts with tracking. Several contacts with students and young people Participation to 2 OI'14 workshops with Oil&Gas stakeholders

Future Work and achievements Organize the internal and external review of last deliverables now. Final Scientific Report before 28/02/2015 ~~~ Continue GROOM participation to next ESFRI roadmap. Concretize relation between EGO/GROOM and EuroGOOS Technological proposal for a deep glider submitted to BG6/H2020 led by GROOM AtlantOS proposal submitted to BG6/H2020. Glider task led by CNRS JERICO+ proposal submitted to INFRAIA/H2020. TNA for gliders and technological task on sensors ENVRI+ proposal submitted to INFRADEV/H2020. Small contribution of GROOM

Advisory board Merged Advisory (scientific) Board and Policy Maker Board Two step consultation : 3 experts at the GA and review process for the final scientific report and executive summary by all ~~~~~ EuroGOOS : –Which institutional support from EuroGOOS ? –Which kind of concrete actions can be conducted to exploit EGO/GROOM momentum ? FIXO3 : –Concretize potential GROOM input to WP11 "Optimization of ocean observing capability" ? –Which kind of concrete actions can be conducted to exploit EGO/GROOM momentum ? EuroArgo and ESFRI : –Which concrete work with the EuroARGO ERIC ? –Present ESFRI trend toward a large Marine RI.