17/03/2003 Referee Meeting M. Beretta 1 MDT Barrel - Complete LV-HV rack 6U 1U 4U 2U 45U 19” Tangential Fan High Voltage Crate Low Voltage Crate Heat Exchanger.

Slides:



Advertisements
Similar presentations
Alice LV PS Workshop June 26, 2001 Salvatore De Pasquale INFN Bologna 1 Status of the TOF Low Voltage System Salvatore de Pasquale INFN Bologna.
Advertisements

Zone Control Air System Why? 1.Provides room by room comfort control. 2.Reduces equipment run time. 3.Eliminates hot/cold rooms. 4.Works with conventional.
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
ZPAS Solutions for Data Center ZPAS GROUP ZPAS Solutions for DATA CENTER.
Geothermal Heating & Cooling System Harnesses the free renewable energy in your own backyard to heat and cool your home. Economical - Can save you up.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
September 26, 2013 xTCA work group Evaluation results from AC/DC converters for xTCA Collaboration (CERN PH-ESE-BE) Vincent Bobillier, Matteo Di Cosmo,
Rack Mounted Network Equipment Patch Panels Network Switch Router Rack Servers HDD Arrays UPS System Provides circuit protection and an uninterruptable.
ZTF Interconnecting Scheme Stephen Kaye
Not Quite the Apollo 13 Rescue, but Some of the Same Ideas! David E. Clark & Associates And Sally M. Woliver & Associates One home, two businesses and.
2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Air Flow.
Marketing Plan Mechatronics identified target markets and focus products as part of a marketing strategy initiated in 2006 An overview of these.
Amp air conditioning limited tel: fax: AMP – MHI SAF Heater Kits DescriptionPart NumberList Price SAF Heater.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Cloze #36 Hot Air Balloon. This is h_ _ air balloon. This is hot air balloon. It is f _ _ _ _ _ with hot air. It is filled with hot air.
It is locally Pakistan manufacture air cooler. It has two motors one is used to move fan and other is used to throw water on dry grass. In the reverse.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
+2.5 V 30 A +5.8 V 3 A -3.6 V 25 A +4 V 100 A +4 V 100 A Controller TGC1 subrack organization +4 V 65 A Controller First 84 HP (19”) subrack Controller:
Interactive Control in Engineering Projects Electronics and Control.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Introduction of New Wall Mounted AVS 18-24URCSBBA Commercial Air Conditioning Dept
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
27/11/02Paul Baillon wach Paris1 Heat transfer study in M0’ using the thermistors on the APD’s and on the boards.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
Date of download: 5/28/2016 Copyright © ASME. All rights reserved. From: Numerical Simulation and Parametric Study of Heat-Driven Self-Cooling of Electronic.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
Date of download: 7/6/2016 Copyright © ASME. All rights reserved. From: Performance Analysis of a Combination System of Concentrating Photovoltaic/Thermal.
PARTS 4 analog ports (AMBZ,IONG, 2 others): back 3 ports for MFC (IONF1, IONM1,DIL): back 4 round ports (FT, INTERLOCK, CALT, AMBZ): back 2 bottom round.
ATLAS ATCA cooling evaluation project Claudio Bortolin (EP-ADO-PO) Michal Kalinowski (EP-ADO-PO) Lukasz Zwalinski (EP-DT-FS) ATLAS cooling team – 2016.
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Thermal Analysis of the SKA Electronics Cabinets
T-simulation OUTLINE Inputs to the T-simulation: chips, boards, crate mechanics and fan T-simulation performed into two steps: On large scale: simple AM.
Rack Design Proposal as of 01/03/2013
PID meeting SNATS to SCATS New front end design
POWER AMPLIFIERS C 48:4 LAB.GRUPPEN NAME MODEL 제조사 General
Electronic Components
Date of download: 12/25/2017 Copyright © ASME. All rights reserved.
Section 1.0 — Fundamentals and General
Heating of ALFA detectors
SCT/Pixel Draft Rack Layout rcj
Pierluigi Paolucci - I.N.F.N. Naples
ATLAS USA15 - Rack 52U with 9U crates, remote PS
Главни развод (MC) главна тачка концентрације
Структурно каблирање Систематски приступ каблирању
Overview of HVAC control panel
HV-LV-DCS Status NEWS DCS Endcap Integration
Dr. Pierluigi Paolucci - INFN di Napoli
AN EXPANDING SITUATION
High-Power GPU Rack: Hybrid Cooling
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
Dr. Pierluigi Paolucci - INFN di Napoli
Future Focus on HX Roadmap
Generating Light from Darkness
Presentation transcript:

17/03/2003 Referee Meeting M. Beretta 1 MDT Barrel - Complete LV-HV rack 6U 1U 4U 2U 45U 19” Tangential Fan High Voltage Crate Low Voltage Crate Heat Exchanger Deflectors HOT AIR COLD AIR

17/03/2003 Referee Meeting M. Beretta 2 TGC1 - Complete LV-HV rack Available and the market: 34 U minirack 1582 x 553 x 400 mm 3 (H x W x T) 29U Patch panel 9U9U 6U 6U6U 2U 19” 4U4U 2U High Pt trigger and Star Switch electronics

17/03/2003 Referee Meeting M. Beretta 3 TGC2 and TGC3 - Subrack Solution 1 – Horizontal boards cooled by tangential fans. Not enough space to host all distributors in the available space 48 TE max 44 TE 1 TE max Solution 2 – An air deflector is added to the bottom of the subrack, and air ventilation is provided by a tangential fan. Maximum heigh of deflector should be 1 U