Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
1 Scintillating Fibre Tracker Simulation Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
MICE Tracker workshop, 06Nov Waveguides for Station5 H. Sakamoto / M. Yoshida.
Beam Position Monitors MICE CM Harbin January, 2009.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
KEK Beam Test Koji YOSHIMURA KEK MICE Collaboration Meeting Koji YOSHIMURA KEK MICE Collaboration Meeting
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Clear Fiber and Wave Guide Fab. Makoto YOSHIDA (Osaka Univ.) July MICE FT
1 Losses in the Cooling Channel Malcolm Ellis PID Meeting 1 st March 2005.
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009  Not enough time to go into detail, so just a quick summary of the status since CM22:
T. Matsushita 1 Station 5 as of 28 Nov 2006 All planes bundled All planes connectorised All planes glued Fibres potted Ready for cut/polishing Shift takers;
Phone meeting on PID Detectors 25 Jan 2006 Implementation of PID detectors in the general MICE layout By Wing Lau, Oxford.
1 Status of the MICE SciFi Tracker Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
9.8 Graph Coloring. Coloring Goal: Pick as few colors as possible so that two adjacent regions never have the same color. See handout.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
1M. Ellis - MICE Tracker PC - 19th October 2007 Station QA Analysis (G4MICE)  For details of software see my previous talk here: u
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
4th Station Waveguide Test Roger Hare & Aron Fish.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
Light Loss Tests Update Aron Fish 22/02/06 Mice Tracker Phone Conference.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
T. Matsushita 1 Waveguide length with 3D model Internal waveguides The shortest = 1.5 m The longest = 2.6 m Others depending on the spacing Front face.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
M. Takahashi, 21 January, 2016 Station Acceptance (SA)
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
MICE Phone Meeting 26 October Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
T. Matsushita 1 News Ribbons - i Inspection at IC All five ribbons have production date Two ribbons have mold ID + production ID (e.g. mold4#1) One ribbon.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber: Mice Collaboration Meeting 29 March Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Single Stage Design.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Midsegment Theorem and Coordinate Proofs
Aron Fish Imperial College Mice Video Conference 01/02/06
Decoding….
Scintillating Fiber/Clear Fiber QA and Ribbon Production
Hire Toyota Innova in Delhi for Outstation Tour
Tracker Station QA Acceptance Test Rig Status
Presentation transcript:

Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06

Final Tracker Connection Map Version 1 2 Station Layout for all Stations C14 C2 C3 C4 C5 C6 C7 C1 C13 C12 C11 C10 C9 C8 C15 C17 C29 C28 C27 C26 C25 C24 C30 C18 C19 C20 C21 C22 C23 C16 1 To To To To To To To To To To To To To To To To To To To To To To To To To To To To To To View ‘X’ 212 Channels View ‘W’ 214 Channels View ‘V’ 214 Channels View of the station onto the polished face of the connector Bulkhead Connector 1 Bulkhead Connector 3 Bulkhead Connector 4 Bulkhead Connector 2 Bulkhead Connector 5

Final Tracker Connection Map Version 1 3 Definition of Channel Numbers View from end of chuck looking at the connector end of the fibre ribbon Channel 640 Channel 427 Channel 533 Channel 534 Chuck with numbering for planes ‘W’ Mylar Centre Fibre Channel 426 Channel 215 Channel 320 Channel 321 Chuck with numbering for planes ‘X’ Mylar Centre Fibre Channel 214 Channel 1 Channel 107 Channel 108 Chuck with numbering for planes ‘V’ Mylar Centre Fibre Ch532 to 427 for Connector 21 to 25 Ch320 to 215 for Connector 11 to 15 Ch108 to 1 for Connector 1 to 5

Plane Order as Built Final Tracker Connection Map Version 1 4 ‘X’ Plane ‘W’ Plane ‘V’ Plane

Final Tracker Connection Map Version 1 5 Connector 1 View ‘V’ 20 Way Bundles 1 – 20 To Bulkhead Connectors 1, 6, 11, 16 & x x Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side.

Final Tracker Connection Map Version 1 6 Connector 2 View ‘V’ 22 Way Bundles 21 – 42 To Bulkhead Connectors 1, 6, 11, 16 & Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side.

Final Tracker Connection Map Version 1 7 Connector 3 View ‘V’ 22 Way Bundles 43 – 64 To Bulkhead Connectors 1, 6, 11, 16 & 21 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 8 Connector 4 View ‘V’ 22 Way Bundles 65 – 86 To Bulkhead Connectors 1, 6, 11, 16 & 21 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 9 Connector 5 View ‘V’ 22 Way Bundles 87 – 108 To Bulkhead Connectors 1, 6, 11, 16 & 21 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 10 Connector 6 View ‘V’ 20 Way Bundles 109 – 128 To Bulkhead Connectors 1, 6, 11, 16 & 21 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side x x

Final Tracker Connection Map Version 1 11 Connector 7 View ‘V’ 20 Way Bundles 129 – 148 To Bulkhead Connectors 2, 7, 12, 17 & 22 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side x x

Final Tracker Connection Map Version 1 12 Connector 8 View ‘V’ 22 Way Bundles 149 – 170 To Bulkhead Connectors 2, 7, 12, 17 & 22 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 13 Connector 9 View ‘V’ 22 Way Bundles 171 – 192 To Bulkhead Connectors 2, 7, 12, 17 & 22 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 14 Connector 10 View ‘V’ 22 Way Bundles 193 – 214 To Bulkhead Connectors 2, 7, 12, 17 & 22 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 15 Connector 11 View ‘X’ 22 Way Bundles 215 – 236 To Bulkhead Connectors 2, 7, 12, 17 & 22 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 16 Connector 12 View ‘X’ 20 Way Bundles 237 – 256 To Bulkhead Connectors 2, 7, 12, 17 & 22 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side x x

Final Tracker Connection Map Version 1 17 Connector 13 View ‘X’ 20 Way Bundles 257 – 276 To Bulkhead Connectors 3, 8, 13, 18 & 23 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side x x

Final Tracker Connection Map Version 1 18 Connector 14 View ‘X’ 22 Way Bundles 277 – 298 To Bulkhead Connectors 3, 8, 13, 18 & 23 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 19 Connector 15 View ‘X’ 22 Way Bundles 299 – 320 To Bulkhead Connectors 3, 8, 13, 18 & 23 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 20 Connector 16 View ‘X’ 22 Way Bundles 321 – 342 To Bulkhead Connectors 3, 8, 13, 18 & 23 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 21 Connector 17 View ‘X’ 22 Way Bundles 343 – 364 To Bulkhead Connectors 3, 8, 13, 18 & 23 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 22 Connector 18 View ‘X’ 20 Way Bundles 365 – 384 To Bulkhead Connectors 3, 8, 13, 18 & 23 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side x x

Final Tracker Connection Map Version 1 23 Connector 19 View ‘X’ 20 Way Bundles 385 – 404 To Bulkhead Connectors 4, 9, 14, 19 & 24 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side x x

Final Tracker Connection Map Version 1 24 Connector 20 View ‘X’ 22 Way Bundles 405 – 426 To Bulkhead Connectors 4, 9, 14, 19 & 24 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 25 Connector 21 View ‘W’ 22 Way Bundles 427 – 448 To Bulkhead Connectors 4, 9, 14, 19 & 24 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 26 Connector 22 View ‘W’ 22 Way Bundles 449 – 470 To Bulkhead Connectors 4, 9, 14, 19 & 24 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 27 Connector 23 View ‘W’ 22 Way Bundles 471 – 492 To Bulkhead Connectors 4, 9, 14, 19 & 24 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 28 Connector 24 View ‘W’ 20 Way Bundles 493 – 512 To Bulkhead Connectors 4, 9, 14, 19 & 24 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side x x

Final Tracker Connection Map Version 1 29 Connector 25 View ‘W’ 20 Way Bundles 513 – 532 To Bulkhead Connectors 5, 10, 15, 20 & 25 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side x x

Final Tracker Connection Map Version 1 30 Connector 26 View ‘W’ 22 Way Bundles 533 – 554 To Bulkhead Connectors 5, 10, 15, 20 & 25 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 31 Connector 27 View ‘W’ 22 Way Bundles 555 – 576 To Bulkhead Connectors 5, 10, 15, 20 & 25 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 32 Connector 28 View ‘W’ 22 Way Bundles 577 – 598 To Bulkhead Connectors 5, 10, 15, 20 & 25 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 33 Connector 29 View ‘W’ 22 Way Bundles 599 – 620 To Bulkhead Connectors 5, 10, 15, 20 & 25 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side

Final Tracker Connection Map Version 1 34 Connector 30 View ‘W’ 20 Way Bundles 621 – 640 To Bulkhead Connectors 5, 10, 15, 20 & 25 Station connector Viewed from the polished face. Internal light guide connector viewed from rear or fibre entry side x x

Final Tracker Connection Map Version 1 35 Internal Lightguides Station 1 C1 1 to 20 C2 21 to 42 C3 43 to 64 C4 65 to 86 C5 87 to 108 C6 109 to 128 C7 129 to 148 C8 149 to 170 C9 171 to 192 C to 214 C to 236 C to 256 C to 276 C to 298 C to 320 C to 342 C to 364 C to 384 Bulkhead 1 1 to 128 Bulkhead to 384 Bulkhead to 256 Length = XXXmm

Final Tracker Connection Map Version 1 36 Internal Lightguides Station 1 C to 404 C to 426 C to 448 C to 470 C to 492 C to 512 C to 532 C to 554 C to 576 C to 598 C to 620 C to 640 Bulkhead to 512 Bulkhead to 640 Length = XXXmm

Final Tracker Connection Map Version 1 37 Internal Lightguides Station 2 C1 1 to 20 C2 21 to 42 C3 43 to 64 C4 65 to 86 C5 87 to 108 C6 109 to 128 C7 129 to 148 C8 149 to 170 C9 171 to 192 C to 214 C to 236 C to 256 C to 276 C to 298 C to 320 C to 342 C to 364 C to 384 Bulkhead 6 1 to 128 Bulkhead to 384 Bulkhead to 256 Length = XXXmm

Final Tracker Connection Map Version 1 38 Internal Lightguides Station 2 C to 404 C to 426 C to 448 C to 470 C to 492 C to 512 C to 532 C to 554 C to 576 C to 598 C to 620 C to 640 Bulkhead to 512 Bulkhead to 640 Length = XXXmm

Final Tracker Connection Map Version 1 39 Internal Lightguides Station 3 C1 1 to 20 C2 21 to 42 C3 43 to 64 C4 65 to 86 C5 87 to 108 C6 109 to 128 C7 129 to 148 C8 149 to 170 C9 171 to 192 C to 214 C to 236 C to 256 C to 276 C to 298 C to 320 C to 342 C to 364 C to 384 Bulkhead 11 1 to 128 Bulkhead to 384 Bulkhead to 256 Length = XXXmm

Final Tracker Connection Map Version 1 40 Internal Lightguides Station 3 C to 404 C to 426 C to 448 C to 470 C to 492 C to 512 C to 532 C to 554 C to 576 C to 598 C to 620 C to 640 Bulkhead to 512 Bulkhead to 640 Length = XXXmm

Final Tracker Connection Map Version 1 41 Internal Lightguides Station 4 C1 1 to 20 C2 21 to 42 C3 43 to 64 C4 65 to 86 C5 87 to 108 C6 109 to 128 C7 129 to 148 C8 149 to 170 C9 171 to 192 C to 214 C to 236 C to 256 C to 276 C to 298 C to 320 C to 342 C to 364 C to 384 Bulkhead 16 1 to 128 Bulkhead to 384 Bulkhead to 256 Length = XXXmm

Final Tracker Connection Map Version 1 42 Internal Lightguides Station 4 C to 404 C to 426 C to 448 C to 470 C to 492 C to 512 C to 532 C to 554 C to 576 C to 598 C to 620 C to 640 Bulkhead to 512 Bulkhead to 640 Length = XXXmm

Final Tracker Connection Map Version 1 43 Internal Lightguides Station 5 C1 1 to 20 C2 21 to 42 C3 43 to 64 C4 65 to 86 C5 87 to 108 C6 109 to 128 C7 129 to 148 C8 149 to 170 C9 171 to 192 C to 214 C to 236 C to 256 C to 276 C to 298 C to 320 C to 342 C to 364 C to 384 Bulkhead 21 1 to 128 Bulkhead to 384 Bulkhead to 256 Length = XXXmm

Final Tracker Connection Map Version 1 44 Internal Lightguides Station 5 C to 404 C to 426 C to 448 C to 470 C to 492 C to 512 C to 532 C to 554 C to 576 C to 598 C to 620 C to 640 Bulkhead to 512 Bulkhead to 640 Length = XXXmm

Final Tracker Connection Map Version 1 45 External Lightguides These are one to one connections between the external tracker bulkhead connector and the VLPC 128 way connectors. Bulkhead connector VLPC connector

Final Tracker Connection Map Version 1 46

Final Tracker Connection Map Version 1 47

Final Tracker Connection Map Version 1 48

Final Tracker Connection Map Version 1 49

Final Tracker Connection Map Version 1 50