SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.

Slides:



Advertisements
Similar presentations
SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
Advertisements

SG-Systems Working Group Charter: The SG-Systems Working Group defines requirements, policies, and services, based on utility industry standards such as.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
SG Communications Boot Camp November 19th, Agenda 3:30 – 3:40 – Welcome and Introductions 3:40 – 4:00 – Review scope and charter of SG Communications.
Knoxville, TN Oct. 19, 2009 AMI-Enterprise Systems Requirements Specification Overview.
ELTSS Alignment to Nationwide Interoperability Roadmap DRAFT: For Stakeholder Consideration in response to public comment.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
AMI Home Area Network Update SAG Meeting March 18, 2014.
OpenHAN Boot Camp July 19, OpenHAN TF Overview Chair Erich W. Gunther, EnerNex – Co-chair Mary Zientara, Reliant Energy -
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
For OpenSG Discussion: Preliminary SG-Enterprise Charter Greg Robinson, Co-Chair, SG-Enterprise Wayne Longcore, Chair, SG-Enterprise.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
OpenFMB Specification Development Plan
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
OpenFMB Specification Development Plan
1 ISO/RTO Council Wholesale Demand Response Projects & OpenADR David Forfia.
Jerry FitzPatrick, NIST Chair Wednesday, May 26. Introduction - IKB PAP8 PAP14 DEWG Charter What should the T&D DEWG be doing? T&D DEWG or T and D DEWGs?
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
Introduction & Overview April 11, 2011 Barry Haaser Managing Director.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, John Teeter for NIST, Kay Clinard UCAIug.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
Darren Highfill Chairing on behalf of Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Utility Industry.
1 OpenADR Taskforce Chair – Albert Chiu Co-chair – Ed Koch Technical Editors – Bruce Bartell, Gerald Gray.
OpenADE Knoxville Meeting February 27 – March 1, 2012 David Mollerstuen, OpenADE TF Chair Steve Van Ausdall, OpenADE TF Vice-Chair.
SG Communications Sessions Tuesday, October 20th, 2009.
Open Smart Grid Subcommittee Organization and Overview Erich W. Gunther UCAIug Board Member.
OpenADE: Roadmap, ITCA, Sample Implementation November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair.
OpenSG - SG Communications May 2010 Slide 1 SG Communications DC Meeting AM2 Session Tuesday 5/4/2010 Network Interoperability.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Bootcamp – Network Interoperability] Date Submitted: [February.
OpenSG Closing Plenary Oct 22 nd, Agenda SG Conformity SG Communications SG Systems SG Security Feedback Next Meeting.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group Overview & Plans For further information, contact Wayne Longcore Chairman of AMI-Ent TF.
OpenSG Closing Plenary Knoxville February, UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
© 2005 Global Grid Forum The information contained herein is subject to change without notice Leading the pervasive adoption of grid computing for research.
National Information Exchange Model Update for the Global Advisory Committee Spring 2008 Meeting April 10, 2008 NIEM Technical Architecture Committee (NTAC)
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
AMI Enterprise Developing Interoperability for Distribution Systems January 2009 Terry Mohn, Technology Strategist SDG&E Vice Chairman, GridWise Alliance.
Today’s Agenda Agree on recurring meeting secretary
Service Definitions A Framework For Standard Interface Development.
# 1 Application Integration Architecture A Framework For Standard Interface Development Gerald R. Gray, Consumers EnergyJune 23, 2008.
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
Boot Camp - Conformity July 19, 2010 Detroit, USA.
OpenHAN TF Meeting Where do we go next? Erich W. Gunther.
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
OpenADE November 17, 2011 PM2 David Mollerstuen, OpenADE TF Chair Steve Van Ausdall, OpenADE TF Vice-Chair.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
OpenHAN SRS v1.95 Overview June 8, OpenHAN SRS v Introduction  OpenHAN area of focus within the NIST conceptual model.
Managers Guide to AMI Enterprise. AMI Enterprise What it is Why you need to be involved How you get involved Who from your organization needs to be involved.
March 2011 Slide 1 Submission Title: OpenSG San Francisco OpenADE Boot Camp Source: OpenADE Task Force Abstract: SG Systems OpenADE Task Force Boot Camp.
Slide 1 EIM Charter Identify and articulate common EIM requirements: Use cases System Requirements Specification (SRS) Work with other OpenSG groups, particularly.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
OpenADR Taskforce. OpenADR and NIST Smart Grid Roadmap Conceptual Model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
Enabling Standards for Demand Side Management
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
EIM Charter Identify and articulate common EIM requirements:
“OpenADR” “Boot Camp” Overview
ETSI Standardization Activities on Smart Grids
Presentation transcript:

SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and services, based on utility industry standards such as the Common Information Model (CIM), required for information exchange from and to utility enterprise back office systems and between these back office systems and data acquisition and control servers (e.g., MDMS, AMI Head Ends, SCADA, OMS, GIS, CIS, work management, etc.). Task forces are established on an as needed basis to accomplish these goals for specific functional areas.

3 OpenHAN Status: Hibernating Charter: Updates System Requirements Specification (SRS) to Version 2.0: Define the system requirements for an open standard Home Area Network system Promote open standards-based HANs that are interoperable Provide the vendor community with a common set of principles and requirements around which to build products Ensure reliable and sustainable HAN platforms Support various energy policies in a variety of states, provinces, and countries Empower consumers to manage their electricity consumption by giving them the information and control they need to make decisions on their energy use Deliverables: SRS 2.0 (completed)

4 OpenHAN History 2008 August 2008 UtilityAMI 2008 HAN SRS v1.04 released 2007 OpenHAN TF is formed to develop system requirements for the HAN 2009 June 2009 Utility AMI 2008 HAN SRS v1.04 selected as a customer domain standard in the NIST Smart Grid Interoperability Standards Roadmap October 2009 OpenHAN 2.0 formed to develop the next version of the HAN SRS 2010 Jan – July 2010 OpenHAN 2.0 collaboration effort August 30, 2010 UCAIug HAN SRS v2.0 ratified and released

Service Definitions Team Status: Hibernating Charter: Assist SG-Systems Task Forces with the following process: Business process analysis Integration requirements detailed in sequence diagrams Service and operation pattern applied Service and information object identification and harmonization Data modeling and artifacts generation Artifacts validation and testing Artifacts version control and issue tracking Deliverables: Provided through task forces on an as needed basis

OpenADR Status: Hibernating Charter: The UCAIug OpenADR TF focuses on developing best practices, use cases and business requirements for DR from an application point of view and specifically on the interactions between the Utility and Facility. Deliverables: Task Force completed 1.0 SRS and SD in 2010 Phase 2 SRS (Addressed additional requirements for PEV, DER, FastDR, Security) completed and ratified Jan Develop and contributed Security profile to OpenADR Alliance in 2010

AMI-Ent TFSlide 7 AMI-Enterprise TF Status: Superceded by SG Enterprise (see subsequent slides) Charter: Defines requirements, policies, and services to support AMI related business processes and functions. Based on utility industry standards such as the Common Information Model (CIM) and best practices. Required for information exchange and control between the MDMS or MDUS and enterprise back office systems. Deliverables (all completed) System Requirements Specification (SRS) Use Cases Service Definitions

SG Enterprise Status: New - Face-to-face meetings and weekly conference calls Charter: The scope of SG-ENTERPRISE is the systems and/or applications within and around the utility enterprise and the inter-systems related business functions and stops at the boundaries of applications and the edge of utility enterprise. The focus is on how these systems are to be integrated and composed to support AMI related business processes and functions. SG-ENTERPRISE 2.0 charter will leverage available and applicable industry best practices and standards for this work, and to tie the required pieces together to support the implementation of AMI related processes, applications, and infrastructure technologies. SG-Enterprise 2.0 will provide specific requirements and supporting artifacts that support the implementation of AMI profile (i.e. strongly typed profiles).

SG Enterprise - continued Deliverables: Updated System Requirements Specification (SRS) Based on existing AMI-Enterprise SRS Corrected versions of existing AMI-Enterprise use cases based on feedback from SDOs Development of new use cases and artifacts where gaps exist

OpenADE Status: Active – Face-to-face meetings and weekly conference calls. Charter: UCAIug OpenSG OpenADE shall promote interoperability for Green Button: Based on NAESB REQ.21 Energy Services Provider Interface (ESPI). Collect and refine changes and extensions to ESPI and related standards. Develop and manage Green Button conformance profiles including: Green Button Download My Data Green Button Connect My Data Additional profiles as needed Develop and manage technical artifacts of a Green Button certification program. Develop and manage test plans and conformance profiles. Ensure availability of testing software. Coordinate with and participate in UCAIug ITCA development. Collaborate with OpenESPI and other related efforts. Support UCAIug marketing group(s) in promoting the standard.

OpenADE - continued Deliverables All milestones targeted for November 2012 OpenSG meeting: Full ESPI test plan complete ITCA operational Ability to certify ready OpenADE / ESPI 1.1 requirements approved to submit to NAESB ESPI 1.1 complete?

Slide 12 Enterprise Information Management (EIM) Status: Active – Face-to-face meetings and biweekly conference calls. Charter: Identify and articulate common EIM requirements: Use cases Activity Diagrams EIM Requirements Specification Develop common EIM Framework that satisfies requirements, taking advantage of other relevant industry work as appropriate (e.g., vision, governance, processes, etc.) Develop requirements for an OpenSG generic semantic model to be used by members as a starting point for their enterprises. Collaborate with SGAC of the NIST SGIP Provide a forum for exchanging information so that all members can benefit from lessons learned. Collaborate with Standards Development Organizations (SDOs), NIST SGIP, and/or consortiums so that needed advancements are accomplished in the most appropriate organizations in the most efficient manner.

Slide 13 Enterprise Information Management (EIM) - continued Deliverables: – EIM Requirements Specification – Use Cases – Guidelines and recommendations for utilities to incorporate EIM into their existing SDLC processes – Enterprise Semantic Model Requirements and Guidelines

OpenMUG Status: New Charter: The purpose of the Open Meter Users Group (OpenMUG) is to provide a forum in which utility operators, meter manufacturers and interested third-party integrators can meet to discuss meter-related issues that could reasonably be solved by the group. Some hypothetical examples of such issue/solution pairs might be: Differing interpretations of a communication standard/recommendation to the standards organization Uncertainty about how to manage meter passwords/whitepaper describing recommended practice Desire for common electronic format of meter test data/proposal to standards organization To guide the group’s work, the first item to be produced is a document enumerating issues to be considered. After the issues are listed, subsequent meetings will evaluate possible solutions and prioritization. If the group finds itself with no further items, it is expected that it would either recharter or disband. The Open Meter Users Group shall follow the UCAIug guiding principles.

OpenMUG - continued Charter Scope: The activities of the Open Meter Users Group shall be limited in scope in order to support proper division of labor with respect to the other UCA groups. The focus will be on meter communications issues and system issues with regard to meters. It will not treat the topic of security or testing except as it relates directly to either meter communications or metering system issues. Head-end integration with other business applications is specifically out of scope. Deliverables: Document enumerating issues to be considered Others TBD

GIS Status: The task force has had one organizing meeting (at Cincinnati) and will meet at New Orleans to begin the process of defining requirements. Regularly scheduled teleconferences (probably biweekly) are expected to begin after the New Orleans meeting. Charter: The OpenSpatial task force was established to define requirements for a harmonization between geospatial information standards maintained by the Open Geospatial Consortium and asset-management and electric network connectivity modelling standards maintained by Technical Committee 57 of the International Electrotechnical Commission. The goal is to enable the two sets of standards to incorporate each other’s material by reference and without bringing their respective governance practices into conflict. Deliverables: Requirements specification