Production Planning and Control

Slides:



Advertisements
Similar presentations
ISEN 315 Spring 2011 Dr. Gary Gaukler. Hierarchy of Planning Forecast of aggregate demand over time horizon Aggregate Production Plan: determine aggregate.
Advertisements

Material Requirements Planning
ISEN 315 Spring 2011 Dr. Gary Gaukler. 1.Master production schedule 2.Bill of material (BOM) 3.Inventory availability 4.Purchase orders outstanding 5.Lead.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
1 Unit 4B - Logics and Calculation of Material Requirement Planning.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Material Requirements Planning Planned Orders Demand BOM Material Data Inputs Output.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
Materials Requirement Planning (MRP)
MRP: MRP: Material Requirements Planning Manufacturing Resource Planning.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
Manufacturing Production Control Systems Dr. Ron Tibben-Lembke SCM 461.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Material Requirements Planning
Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Product Structure Tree.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 14 Materials and Resource Requirements Planning McGraw-Hill/Irwin.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Aggregate Planning and Resource Planning Chapters 13 and 14.
Materials Requirements Planning
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
MRP Systems MRP – Material Requirements Planning Commonly used method in industry to coordinate the production scheduling of end items and their associated.
Chapter 16 Inventory Systems for Dependent Demand
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Master Production Scheduling Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.
Material Requirements Planning
© Wallace J. Hopp, Mark L. Spearman, 1996, Material Requirements Planning (MRP) Unlike many other approaches and.
3rd Session: Chapter 2: Inventory Control From EOQ to ROP continued Chapter 3:The MRP Crusade TM 663 Operations Planning September 19, 2011 Paula Jensen.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Aggregate Planning and Resource Planning Chapters 13 and 14.
CAPACITY MANAGEMENT Nyoman Pujawan.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Introduction to Materials Management Chapter 4 – Material Requirements Planning.
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
INVENTORY CONTROL OF MANUFACTURING SYSTEMS Prof. Dr. Orhan TORKUL Res. Assistant M. Raşit CESUR.
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
MATERIALS REQUIREMENT PLANNING (MRP) MRP IS A SYSTEM OF PLANNING AND SCHEDULING THE TIME- PHASED MATERIALS REQUIREMENT FOR PRODUCTION OPERATIONS. PROACTIVE.
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
COB 300C - The Operations Dimension Master Production Scheduling and Material Requirements Planning (bring class examples to class)
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
SISTEM INFORMASI ENTERPRISE
MATERIAL Requirements planning MRP
Facility Inventory Old Facilities Modern Facilities Classroom Size
BUAD306 MRP/ERP.
Chapter 16 Materials Requirements Planning
MRP and ERP.
CHAPTER 14 MRP and ERP.
MATERIAL Requirements planning MRP
Material Requirement Planning (MRP)
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Production Planning and Control Materials Requirement Planning Dr. Lotfi K. Gaafar Production Planning and Control- Materials Requirement Planning (1)

Production Planning and Control The Production Control System Demand forecasting Sales and order entry Customer Aggregate planning Materials requirement planning Shop-floor scheduling and control Shipping and receiving Production Inventory management Inventory Vendors Production Planning and Control- Materials Requirement Planning (2)

Material Requirements Planning Given a master schedule, what raw materials and components quantities are needed and when. Requires: Bill of material (Manufacturing tree) Inventory status Lead times Master Production Scheduling Bills of Material Material Requirements Planning Inventory Status Quantities and Order Times Production Planning and Control- Materials Requirement Planning (3)

Assumptions 1. Known deterministic demands. 2. Fixed, known production leadtimes. 3. Infinite capacity. Idea is to “back out” demand for components by using leadtimes and bills of material. Production Planning and Control- Materials Requirement Planning (4)

MRP Procedure 1. Netting: net requirements against projected inventory 2. Lot Sizing: planned order quantities 3. Time Phasing: planned orders backed out by leadtime 4. BOM Explosion: gross requirements for components Production Planning and Control- Materials Requirement Planning (5)

Inputs Master Production Schedule (MPS): due dates and quantities for all top level items Bills of Material (BOM): for all parent items Inventory Status: (on hand plus scheduled receipts) for all items Planned Leadtimes: for all items Production Planning and Control- Materials Requirement Planning (6)

Material Requirements Planning Example Consider the manufacturing tree (BOM) and the accompanying information. Production Planning and Control- Materials Requirement Planning (7)

Material Requirements Planning Example CT LT = 2 B00 LT = 1 Production Planning and Control- Materials Requirement Planning (8)

Material Requirements Planning Example X10 LT = 1 33 X10 cannot be scheduled. How many CTs will be affected? How can we fix the problem? Production Planning and Control- Materials Requirement Planning (9)

Rough Cut Capacity Planning (RCCP) Quick check on capacity of key resources Use Bill of Resource (BOR) for each item in MPS Generates usage of resources by exploding MPS against BOR (offset by leadtimes) Infeasibilities addressed by altering MPS or adding capacity (e.g., overtime) Production Planning and Control- Materials Requirement Planning (10)