Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.

Slides:



Advertisements
Similar presentations
Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
Advertisements

Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014.
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Central Valley Flood Protection Board Meeting – September 27,
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
Presented by: Terri Gaines DWR FESSRO February 28, 2014 Regional Permitting for the CVFPP.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
California’s Central Valley Flood System Improvement Framework California Levees Roundtable March 27, 2009 California Levees Roundtable March 27, 2009.
Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1.
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
1 Three Rivers Levee Improvement Authority April 21, 2006 Presentation to the State Reclamation Board Regarding Satisfaction of Permit Special Condition.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
NRCS NRCS Watershed Program In Texas. Water Resources AuthoritiesAuthorities Project ActivitiesProject Activities RehabilitationRehabilitation FundingFunding.
Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Central Valley Flood Protection Board Meeting – December 20,
Central Valley Flood Protection Board August 9, 2013 Presented by: Michael Mierzwa California Department of Water Resources DWR’s Involvement in Flood.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Monterey Peninsula Water Management District 1 Confirm Scope of Work and Description for MPWMD ASR Project Item 13 April 18, 2005 Regular Meeting Staff.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Integrated Regional Water Management MAY 22, 2015 TRACIE BILLINGTON DEPARTMENT OF WATER RESOURCES 1.
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
Lake County Watershed Management Board Funding Program Mike Prusila, CFM, Watershed Planner.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
Yuba County Comprehensive Flood Protection Program
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
May 14, Planning Commission Planning Commission May 14, 2015.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Three Rivers Levee Improvement Authority June 8, 2007
Continuing Authorities Program
Overview of the Reissuance of 401 Water Quality General Certifications
Final Environmental Impact Report
Sacramento Environmental Commission January 2019.
Presentation transcript:

Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee

2 Project Goals –Achieving at least a 200 year level of public safety flood protection for south Yuba County with regional, system, and environmental benefits; –Completing the remaining major public safety flood protection elements in 2007 and 2008; and –Achieving a fair and equitable State-local cost share with the local cost share generated through continued development.

3 Overview History of the Setback Levee Benefits of the Setback Levee Design, permitting, and construction schedule Interplay with existing Implementation Agreement and Funding Agreement

4 Overview History of the Setback Levee Benefits of the Setback Levee Design, permitting, and construction schedule Interplay with existing Implementation Agreement and Funding Agreement

5 History of the Setback Levee In 2003 the Yuba County Water Agency completed a Proposition 13 funded feasibility study/programmatic EIR identifying as feasible the Feather River Setback Levee. In April 2005 the prior Reclamation Board approved the approach for Phases 1-3. Phases 1-3 are now substantially complete. The public-private partnership has been essential to public safety success in Yuba County, has resulted in $130 million in flood protection improvements, and has been superior to the unacceptable public safety risk of waiting for the federal Yuba Basin Project.

6 History of the Setback Levee (continued) In May 2006 the Reclamation Board approved an approach for Phase 4 Feather River (strengthen-in- place) and Yuba River. In August 2006 the first Landowner Capital Call was made to fund construction of Phase 4 Yuba River repairs. Phase 4 Yuba River repairs are now substantially complete. In November 2006, following Propositions 84 and 1E, Three Rivers rescheduled the second Capital Call as allowed under the Second Implementation Agreement. –Second Funding Agreement required project selection prior to funding of second Capital Call. –Three Rivers’ cashflow showed no need for capital call at that time.

7 History of the Setback Levee (continued) Three Rivers sought and received conceptual support of Setback Levee from DWR. Three Rivers received written support for Setback Levee from Sutter County, Levee District 1, Friends of the River, SYRCL, Sierra Club, Yuba County Water Agency, and SAFCA. In February 2007, after extensive due diligence, Three Rivers certified the EIR and selected the Setback Levee.

8 Achieves 200 Year Protection Approx. 13 miles Segments 1 & 3 strengthen-in-place Segment 2 setback with new levee construction Phase 4 - Feather River including Setback Levee Segment 3 Segment 2 (Setback Levee) Segment 1

9 Overview History of the Setback Levee Benefits of the Setback Levee Design, permitting, and construction schedule Interplay with existing Implementation Agreement and Funding Agreement

10 Benefits of the Setback Levee 1.Provides superior flood protection for south Yuba County. 2.Provides regional flood protection benefits for Sutter County, Yuba City, Marysville, and Linda. 3.Proposed Setback is consistent with FloodSAFE California and is the most significant structural change to the system likely to be constructed in the next few years. 4.Creates up to 1550 acres of habitat for restoration and mitigation.

11 1. Superior Flood Protection Built to current engineering standards Built with suitable soils (current levee soil is too sandy) Removes river choke point and widens floodway Built away from old river channels Eliminates significant erosion sites Achieves greater than 200-year protection in certain reaches

12 2. Regional Flood Protection Benefits Channel widening creates lower water surface elevations: –Water surface reduction benefits to Marysville and Yuba City (RM 27.0) of 1.3 for 100 year and 1.5 for 200 year. –Maximum water surface reduction (RM23.5) of 2.7 for 100 year and 3.0 for 200 year. Because of the regulated nature of the Feather River and the addition of 1550 acres to the floodway, there are no downstream hydraulic impacts. Regional support letters have been received.

13 Water Surface Elevations Compared to Recent Flood Events WSE = Water Surface ElevationPLM = Project Levee Mile Sources 1/ Sacramento River Flood Control System Evaluation, Initial Appraisal Report, Marysville/Yuba City Area, January 1990, Plates 4 & 7 2/ MBK H&H Report for Alternatives Analysis Report, December 2006, Figures 3 & 15 3/ MBK H&H Report for Alternatives Analysis Report, December 2006, Table 7 Table Developed 2/21/07

14 3. Setback is consistent with FloodSAFE California Proposed project meets or exceeds all of the California FloodSAFE criteria. California FloodSAFE acknowledges that system changes must be made to reduce endless erosion and O&M battle and costs. Proposed project is regularly mentioned by DWR as the type of project that DWR wants to fund.

15 4. Creates up to 1550 acres of habitat for restoration and mitigation The 1550 acres could be used for: –Mitigation Banking –Habitat restoration and enhancement –Agricultural land with flowage easements Adds a significant increment to the existing riparian corridor along the Feather River. Three Rivers will assure that adequate agreements are in place for Three Rivers and/or DWR to perform necessary maintenance in the restoration area.

16 Overview History of the Setback Levee Benefits of the Setback Levee Design, permitting, and construction schedule Interplay with existing Implementation Agreement and Funding Agreement

17 Design, Permitting, and Construction Schedule Segments 1 and 3 are 90% designed. Segments 1 and 3 permitting is underway. Segment 2 design contract to go to Three Rivers Board within 30 days. Phase 4 Feather River strengthen-in-place and setback levee construction to start in Voluntary and eminent domain land acquisition to be handled in stages in advance of construction.

18 Design, Permitting, and Construction Schedule Description J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S Ph1 Yuba Levee Ph2 Yuba, WPIC, & Bear Ph3 Bear Setback Levee Ph4 Yuba Levee Ph1-4 Certification Alternatives Analysis Segment 1 & 3 Alternatives Analysis Segment 2 Engineering/Design Permitting Segments 1 & 3 Land Acquisition Segment 1 & 3 Construction – Bid to Complete Engineering/Design Segment 2 Permitting Segment 2 Land Acquisition Segment 2 Construction - Foundation Construction - Embankment Degrade Existing Levee in Segment Year Facilities Complete

19 Permitting Approach Similar to Bear River Setback Levee, permitting and construction will be handled in two step approach: –First, Three Rivers will obtain all permits to build new “backup” levee (including encroachment permit and 404). Three Rivers will then construct the “backup” levee. –Second, Three Rivers will obtain all permits necessary to remove old levee (including encroachment permit, 404, and 408). Three Rivers will then breach the old levee.

20 Overview History of the Setback Levee Benefits of the Setback Levee Design, permitting, and construction schedule Interplay with existing Implementation Agreement and Funding Agreement

21 Interplay with Existing Implementation Agreement and Funding Agreement As with Bear River Setback Levee, multiple funding sources are required to fund a more extensive project with regional, system, and environmental benefits. Because Three Rivers selected the Setback Levee, Three Rivers and the Landowners are meeting to discuss an amendment to the Funding Agreement to address the changed scope of the project. In addition to the Landowners, to achieve the Feather River Setback Levee, the State will need to provide timely funding to meet project milestones.

22 Three Rivers Projected Cashflow (In millions) Three Rivers Growth in Costs (in millions)

23 Interplay with Existing Agreements (continued) Three Rivers is working closely with DWR and will shortly apply for “Early Implementation Funding” from California FloodSAFE program. Three Rivers is meeting regularly with Landowners to discuss new commitment and expects to report on completed framework at next Subcommittee meeting. Three Rivers requests comments from Reclamation Board at March 16 meeting so that Three Rivers can draft Funding Agreement Amendment for Reclamation Board review at May 2007 meeting. Schedule will be maintained during this interim period so that all improvements can be completed by November 2008.

24 Final Thoughts Three Rivers and the Landowners are committed to three co-equal goals: –Achieving at least a 200 year level of public safety flood protection for south Yuba County with regional, system, and environmental benefits; –Completing the remaining major public safety flood protection elements in 2007 and 2008; and –Achieving a fair and equitable State-local cost share with the local cost share generated through continued development. Three Rivers is dedicated to providing all necessary coordination with the Reclamation Board, DWR, and other resource agencies to achieve this superior project.

Three Rivers Levee Improvement Authority February 27, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee