IRP Review  IRPs with Significant Detail on Flexibility Assessment  Portland General Electric  Puget Sound Energy  Other IRPs.

Slides:



Advertisements
Similar presentations
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
Advertisements

Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Technical Conference Avoided Cost Modeling January 6, 2015.
Demand Response in the Reliability Pricing Model Chuck Whitlock.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
05/14/2014 Flexibility Methods Workgroup. 2 © 2014 Electric Power Research Institute, Inc. All rights reserved. Overview/Agenda Discussion of Literature.
Secure System Scheduling with High Wind Penetrations J. Kennedy March 2009.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Overview of Wind Energy Grid Integration in USA ADB Wind Energy Grid Integration Workshop Sept 23, 2013 Pramod Jain, Ph.D. President, Innovative Wind Energy,
Presentation to WECC Market Interface Committee March 24, 2015
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
U.S. Energy Information Administration Independent Statistics & Analysis EIA Reporting Proposal: Balancing Authority Hourly Operating Information.
NORTHWEST POWER POOL Reliability Update – Summer 2010 April 2010 Jerry D. Rust.
CCU Department of Electrical Engineering National Chung Cheng University, Taiwan Impacts of Wind Power on Thermal Generation Unit Commitment and Dispatch.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
Energy Imbalance Market Presented at: The Governor’s Utah Energy Development Summit 2015 Caitlin Liotiris Energy Strategies Power Through Ideas.
Normal Distribution.
Plan Today. Power Tomorrow. The Utility Perspective PNUCC June 11, 2009.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Resource Adequacy Steering Committee Meeting October 4, 2011.
Update on Energy Imbalance Market Presentation to WECC Market Interface Committee October 15, 2015 Jim Price, Senior Advisor, Market Development & Analysis,
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Operations Update ERCOT Board Meeting March 18, 2003.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
PEAK CAPACITY COST & DEMAND RESPONSE PACIFIC NORTHWEST DEMAND RESPONSE PLANNING COMMITTEE BILL DICKENS TACOMA POWER FEBRUARY 23, 2012.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
Shaping Up The Duck Chart Independent Energy Producers Association Annual Meeting Mark Rothleder Vice President, Market Quality and Renewable Integration.
ISO Confidential Climate & Energy Law Symposium University of San Diego School of Law Karen Edson Vice President Policy & Client Services November 6, 2015.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Agenda TSOG 8th November
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
Asia-Pacific Energy Regulatory Forum
GENESYS Redevelopment Strawman Proposal
Energy and Ancillary Services Design Stream Working Group Meeting 6
Grid Integration of Intermittent Resources
penetration of wind power
Solar Eclipse Overview August 2017
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
PacifiCorp-CAISO-NVE EIM Initiative Overview
Update on Energy Imbalance Market
Ahmad Elberry, Abdelghani Aljayyousi
Presentation transcript:

IRP Review  IRPs with Significant Detail on Flexibility Assessment  Portland General Electric  Puget Sound Energy  Other IRPs

Portland General Electric  Start with system dispatched to normal economic conditions  Wind curtailment not assumed for Decs  Demand curves based on load net wind at percentiles  Supply curves based on asset dispatch changes from starting state

Puget Sound Energy  Production cost dispatch with AURORAxmp  Used load, wind, hourly scheduled interchange and forced outages for intra- hour flexibility simulation  95% confidence interval to assess hour- ahead need for balancing reserves  Proxy CPS2 score

Other IRPs  Forecast reserve requirements  Wind integration studies  PacifiCorp forecast reserve supply  Qualitative evaluations, such as letter grade for flexible aspects of generators