Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Ion instability at SuperKEKB H. Fukuma (KEK) and L. F. Wang (SLAC) ECLOUD07, 12th Apr. 2007, Daegu, Korea 1. Introduction 2. Ion trapping 3. Fast ion instability.
Review of Electron Cloud R&D at KEKB 1.Diagnostics 1.Beam Size Blow-up 2.Beam Instabilities 3.Electron Density 4.SEY (Secondary Electron Yield) 2.Mitigation.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Recent observations of collective effects at KEKB H. Fukuma, J. W. Flanagan, S. Hiramatsu, T. Ieiri, H. Ikeda, T. Kawamoto, T. Mitsuhashi, M. Tobiyama,
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
CESR Beam-Beam Effects at CESR Mark A. Palmer Cornell University July 14, 2001.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy P0 Feedback Project: Merging EPICS with FPGA’s Nicholas.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
Feedback for CESR TA Michael Billing May 17, 2007.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
Developing Tune Feedback for PEP-II Alan Fisher SLAC e + e – Factories 2003 October 13–16.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Proposal for Low frequency damping system in Tevatron Why do we need it? Maybe not? Can our current correctors handle the job? How should the system look?
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
BBQ system Tatiana and Benoit, thanks to a lot of help from Christian Boccard, Marek Gasior and Ralph Steinhagen (BE/BI-QP)
Initial Performance Results of the APS P0 (Transverse Bunch-to-Bunch) Feedback System N. DiMonte#, C.-Y. Yao, Argonne National Laboratory, Argonne, IL.
January 19, 2006PEP TFB R.Akre PEP II Transverse Feedback System Ron Akre William Colocho Anatoly Krasnykh Vojtech Pacak Dmitry Teytelman Uli Wienands.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
Booster Dampers Update Nathan Eddy PIP Meeting 4/30/14.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
BIC Issues Alan Fisher PEP-II Run-4 Post-Mortem Workshop 2004 August 4–5.
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Design of BEPC Ⅱ Bunch Current Monitor System Zhanglei Beam Instrumentation Group.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
Beam dynamics in crab collision K. Ohmi (KEK) IR2005, 3-4, Oct FNAL Thanks to K. Akai, K. Hosoyama, K. Oide, T. Sen, F. Zimmermann.
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
New Studies on Electron Clouds and Specific Luminosity
RF acceleration and transverse damper systems
PEP II Transverse Feedback System
Dither Luminosity feedback versus Fast IP feedback
LLRF Research and Development at STF-KEK
Operational Description
First Look at Nonlinear Dynamics in the Electron Collider Ring
LHCb calorimeter main features
Fill-pattern Control System for KEKB
Limits on damping times
New PSB beam control rf clock distribution
Injection design of CEPC
Makoto Tobiyama KEK Accelerator Laboratory and SOKENDAI
Presentation transcript:

Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory

KEKB Two rings with L=3km, f RF =508.8MHz, h=5120 HER: electrons 8GeV 1.3A LER: positrons 3.5GeV 1.7A

Requirements for bunch by bunch feedback systems Feedback system should handle: both horizontal and vertical directions Longitudinal– LER (optional) minimum bunch spacing of 2 ns various modes coming from unknown sources: Resistive wall (HER, LER) Photo electron instability (LER) Fast ion instability (HER) Feedback damping time required 1 ms (100 turns) for transverse directions Transverse radiation damping time: 41 ms

Signal processing Hardware 2-tap FIR filter :simplest digital filter DC rejection 90-degree phase shift (for longitudinal plane) One-turn delay adjustment

Digital filter system A/D(MAX101, 8bit) works with ring RF clock=509MHz. Demultiplex the output of A/D down to manageable frequency: 509MHz/32=15MHz. Write the data to two ring memories (M1 and M2) simultaneously, read two different data (from M1 and M2), and subtract (M1-M2) within 1/15 MHz (67 ns): two actions /cycle. Address counter: one for data-write address and two full- adder (subtracter) to get two data-read addresses Multiplex the calculated result up to 509MHz/2 (D/A:TQ6122-M has internal-multiplexer).

Custom LSIs 0.5  gated GaAs DC FET logic, 136 pins QFP Synchronizing circuit between chips FDMUX Demultiplex 4-bit signal (PECL) into 16ch x 4bit (LvTTL) signal 600 MHz (max),1.5k gates FMUX Multiplex 16ch x 4bit (LvTTL) signal to 4-bit PECL signal 600 MHz (max),1.7k gates

Application to related systems Memory board (20MB)

Bunch current monitor I njection trigger stops the data-taking of the BCM BCM sends interrupt to VME-bus Data transfer from BCM to VME CPU Convert the data to bunch current, write the information to reflective memory and EPICS record Reflective memory sends interrupt to bucket selection code Trigger to reflective memory ~1.4 ms Maximum inj: 50 Hz (20ms)

Bunch oscillation recorder Post-mortem analysis of beam abort Beam-loss trigger from DCCT Automatic data transfer Transient-domain analysis of instabilities Dominant mode of the instability Clear (linear) behavior with small amplitude of oscillation Precise oscillation measurement with long-time data accumulation Measurement of sideband of PEI during collision

Performance of the system Transverse feedback damping time at high current:~0.2 ms (20 turns) Without feedback systems, we observe strong transverse instabilities starting from 20~40 mA With feedback system on (both horizontal and vertical planes), we can inject single beam up to maximum current. Very flat filling pattern for good luminosity Understanding the new instabilities Photo-Electron Instability, Fast Ion Instability

Lessons learned during the operation of transverse feedback systems Problem: A/D easily saturates with the change of residual offset of the detection system Continuous Closed Orbit Correction Feedback of reference RF phase Gain optimization before/after the digital filter Need to monitor the “real” offset observed by the digital filter Problem: Difficulty to find the best analog vector sum of the detection system Fine tuning with minimum feedback gain The best position is affected by the dynamic beta effect Desirable to use only one pickup and tune the phase in the digital filter Problem: Not easy to find problems in the filter Need self checking system

Specific Luminosity vs FB Gain FB gain of the LER vertical affects the specific luminosity. The other gains (LER H, HER H/V) have no effect.

Luminosity depends on LER-V feedback gain Speculated sources Feedback gain is too high?? Maximum stable damping rate of the system from simple simulation shows less than 10 turns Reactive component of the feedback kick affects the luminosity?? No obvious tune-shift due to feedback gain is observed Residual noise blows up the vertical size?? Beam-beam simulation shows only a few percent of blowup of the vertical beam size reduces the luminosity greatly. Might be showing the limitations of two-tap FIR filter system

Summary Bunch by bunch feedback systems for KEKB are working very well and contributing to improvements in ring operation and physics runs. Effect of the feedback systems on luminosity might be coming from the limitations of hardware two-tap FIR filter system. Need new generation digital filter system: Multi-tap, non-downsamping digital filter Gboard is under development with the collaboration of KEK, SLAC and INFN

Backups

PCV Layout FPGA evaluationPin Layout of FPGA for DEMUX

System block diagram and signal flow Demultiplex Multiplex VME I/O XC2V2000(FF896) x3 Filter FPGA XC2V6000(FF1152) x4 ADC MAX108 DAC TQ6122-M