© Crown Copyright 2014. Source: Met Office Polar Prediction Project (PPP) Update In 2001, the World Meteorological Congress decided to embark on a decadal.

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water WMO Global Integrated Polar Prediction System (GIPPS) Peter Lemke (on.
Advertisements

Ensemble Forecasting of High-Impact Weather Richard Swinbank with thanks to various, mainly Met Office, colleagues High-Impact Weather THORPEX follow-on.
WMO Monitoring & Evaluation System (Measuring our Performance/Success)
© Crown copyright Met Office 10 years ago (IPCC TAR, 2001)
Numerical Weather Prediction Models
World Meteorological Organization Working together in weather, climate and water Other Cross-Cutting Matters WMO Polar Activities and Global Cryosphere.
Review of EC-PORS activities since EC- PORS4: Research Thomas Jung Alfred Wegener Institute Helmholtz Centre for Polar and Marine Research Germany.
World Climate Research Programme (WCRP) Polar Climate Predictability Initiative (PCPI) (V. Ryabinin (WCRP) for PCPI Co-Chairs) Ted Shepherd (Department.
CL-01 Climate information for Adaptation Task Coordinator: Michel Rixen Task Liaison IB: Stephan Bojinski GEO Secretariat POC: EspenVolden TARGET 1 Improved.
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
ENSEMBLES RT4/RT5 Joint Meeting Paris, February 2005 Overview of Seasonal-to-Decadal (s2d) Activities during the Initial 18 Months Francisco J. Doblas.
1 00/XXXX © Crown copyright Update on the Met Office forecast model. Damian Wilson, Met Office.
 Global Integrated Polar Prediction System (GIPPS)  The WWRP Polar Prediction Project (PPP)  The WCRP Polar Climate Predictability Initiative (PCPI)
General comments Need for new observations versus new parameterizations? Should explore what GCOS and others are doing Urgent need for concerted physical.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
1 The EUROBRISA Project David Stephenson University of Exeter 1 st EUROBRISA workshop, Paraty, Brazil March 2008.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
AMS Presidential Forum January 2013© ECMWF Slide 1 Predicting Weather and Climate: Scientific progress and future opportunities Alan Thorpe AMS Presidential.
WWRP Polar Prediction Project Thomas Jung Chair of the WWRP Polar Prediction Project Alfred Wegener Institute Helmholtz Centre for Polar and Marine Research.
DEMETER Taiwan, October 2003 Development of a European Multi-Model Ensemble System for Seasonal to Interannual Prediction   DEMETER Noel Keenlyside,
Polar Communications and Weather Mission Canadian Context and Benefits.
Modelling Theme White Paper G. Flato, G. Meehl and C. Jakob.
Where the Research Meets the Road: Climate Science, Uncertainties, and Knowledge Gaps First National Expert and Stakeholder Workshop on Water Infrastructure.
1 Precipitation verification Precipitation verification is still in a testing stage due to the lack of station observation data in some regions
WCRP Polar Climate Predictability Initiative (PCPI) Ted Shepherd Department of Meteorology University of Reading Report to PPP SC meeting, Reading, 12.
The Centre for Australian Weather and Climate Research A partnership between CSIRO and the Bureau of Meteorology AGREPS – ACCESS Global and Regional EPS.
World Climate Research Programme Climate Information for Decision Making Ghassem R. Asrar Director, WCRP.
Office of Science Office of Biological and Environmental Research DOE Workshop on Community Modeling and Long-term Predictions of the Integrated Water.
© Crown copyright Met Office WGNE activities and future directions Andy Brown and Jean-Noël Thépaut (WGNE co-chairs)
© Crown copyright Met Office Met Office activities related to needs of humanitarian agencies Anca Brookshaw.
WWRP OUTCOME OF CASXV (November 2009) David Burridge and Gilbert Brunet WWRP & THORPEX IPO CASXV report – ftp://ftp.wmo.int/Documents/PublicWeb/mainweb/meetings/
Office of Research and Development National Exposure Research Laboratory, Atmospheric Modeling and Analysis Division S.T. Rao Director, NERL/AMAD U.S.
Linkage between the research community and operational center - case examples - First meeting of the WWRP PDEF working group Karlsruhe, Germany May,
WWRP Implementation Plan for the WWRP Polar Prediction Project Thomas Jung, Steering Group Chair Neil Gordon, WMO Consultant November
© Crown copyright Met Office The Role of Research Aircraft in YOPP Chawn Harlow, YOPP Summit, WMO, Geneva 13 July 2015.
WMO 3.1 Feedback from PTC-2014 meeting CAS MG meeting WMO Geneva April 2014 Øystein Hov Norwegian Meteorological Institute WMO; Name of Department.
High Impact Weather Emerging challenge identified at CASXVI Mariane DIOP KANE Mariane DIOP KANE CASMG9, Geneva, April 2014.
DAOS Meeting October 2015 Beijing 1 Year of Polar Prediction There has been a growing interest in the Polar Regions in recent years, because of concerns.
WWRP An International Polar Prediction Project Chair: Gilbert Brunet Rapporteur: Barry Goodison 1.
World Weather Research Programme What / How does the Programme help the Society? (Item 3.3) 24 May 2011.
Requirement for North America THORPEX Science Plan Dr. Louis Uccellini Director NWS/National Centers for Environmental Prediction North American Science.
The Polar Prediction Workshop, Oslo, Norway, 6-8 October 2010.
1 Symposium on the 50 th Anniversary of Operational Numerical Weather Prediction Dr. Jack Hayes Director, Office of Science and Technology NOAA National.
Science plan S2S sub-project on verification. Objectives Recommend verification metrics and datasets for assessing forecast quality of S2S forecasts Provide.
Page 1 Andrew Lorenc WOAP 2006 © Crown copyright 2006 Andrew Lorenc Head of Data Assimilation & Ensembles Numerical Weather Prediction Met Office, UK Data.
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
© Crown copyright Met Office WGNE activities and future directions Andy Brown.
Seamless forecasting in time, space and complexity
For GAW SSC meeting, 18 February Alexander Baklanov, ARE WMO.
WWRP The WWRP Polar Prediction Project Thomas Jung Alfred Wegener Institute for Polar and Marine Research June
EC-PHORS GCW YOPP The WMO Global Cryosphere Watch (GCW) is an international mechanism for supporting all key cryospheric in-situ and remote sensing observations.
11 9th ARC Meeting 3 November 2012, Kunming, China Report from ICSC 10 Jim Caughey, THORPEX IPO.
Commission for Atmospheric Science World Weather Research Programme
Year of Polar Prediction (YOPP)
WG on Nowcasting Research World Meteorological Organization
Report by the Director of the Research Department (RES)
Key Questions What are the key priorities in prediction on timescales from a hour to a season? 5 Societal needs 5 Key prediction/science questions 5 technological.
YEAR OF POLAR PREDICTION
REPORT BY THE CHAIR OF THE OPEN PROGRAMME AREA GROUP ON THE DATA-PROCESSING AND FORECASTING SYSTEM Ken Mylne
Ideas for NWS EPS Advancement
Reports to TIGGE – 9, Geneva Aug 31- Sept 2, 2011
Causes of improvements to NWP (1979 – 2009)
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team
High Impact Weather Emerging challenge identified at CASXVI
MOGREPS developments and TIGGE
AGREPS – ACCESS Global and Regional EPS
Ideas for NWS EPS Advancement
Activities WG-MWFR Help set up/involvement in RDP’s/FDP’s (COPS, Sochi, HYMEX, …) Push mesoscale research cooperation / proposals on: Mesoscale modelling.
GODAE Final Symposium, 12 – 15 November 2008, Nice, France
Presentation transcript:

© Crown Copyright Source: Met Office Polar Prediction Project (PPP) Update In 2001, the World Meteorological Congress decided to embark on a decadal endeavour – the development of a Global Integrated Polar Prediction System (GIPPS). Two closely related initiatives: WWRP PPP to “Promote cooperative international research enabling development of improved weather and environmental p rediction services for the polar regions, on time scales from hours to seasonal.” WCRP Polar Climate Predictability Initiative (PCPI) which “contributes to the development of GIPPS on time scales of a season or beyond”. Details, plans available from

© Crown Copyright Source: Met Office PPP Overview Steering Group launched PPP in early 2012 Implementation plan adopted in January 2013Implementation plan Science plan produced providing scientific basis for activities.Science plan Major activity: Year of Polar Prediction (YOPP: )YOPP International Coordination Office at Wegener Institute, Bremerhaven.

© Crown Copyright Source: Met Office PPP: Key Goals Improve understanding of the benefits of using existing prediction information and services in polar regions…. Improve verification of polar weather and environmental predictions… Optimize the polar observing system to provide good coverage of high-quality observations of all components of the polar climate system in a cost effective manner. Develop uncoupled and coupled model systems with a realistic representation of key physical, dynamical, chemical and hydrological processes in the polar regions. Develop improved DA systems that account for challenges in the polar regions such as sparseness of observational data, steep orography, model error… Develop ensemble prediction systems with a realistic representation of model and initial condition uncertainty in the polar regions. Improve understanding of the origins and limits of predictability in the polar regions…

© Crown Copyright Source: Met Office PPP Research Plan Areas Potential MWFR activities in each FSR area…

© Crown Copyright Source: Met Office PPP FSR Selected Activities Observations: New obs, adjoint sensitivies, OSSEs. Modelling: Explore polar processes (e.g. stable PBL, aerosol, cloud m icrophysics, river flows, lakes, sea-ice, permafrost), grey zone, stochastic parametrization, etc). DA: Evaluate analysis/reanalysis datasets, develop sea-ice retrievals, flow-dependent error covariances, coupled O-A-I-L Ensemble forecasting: Assess global/regional(?) polar EPS, improve uncertainty in IC/model, explore SP vs multi-model EPS, …

© Crown Copyright Source: Met Office YOPP

© Crown Copyright Source: Met Office YOPP

© Crown Copyright Source: Met Office YOPP: Next stages PPP Steering Group Meeting: rd August

© Crown Copyright Source: Met Office PPP Comments Significant, well-coordinated effort with ambitious (achievable?) plans. Focus to date is clearly on global coupled NWP models, rather than high-resolution NWP. Limited MWFR member activity – should (can?) MWFR be more active promoting mesoscale PPP? YOPP: MWFR not involved as yet, Should we get involved next week at WWOSC PPP meeting?

© Crown Copyright Source: Met Office Blobitecture ( Wikipedia: Future Systems' blobitecture desig nfor the 2003 Selfridges Building department store, was intended to evoke the female sillouette and a famous "chainmail" dress designed by Paco Rabanne in the 1960s. Its landmark qualities were expected to rejuvenate the Birmingham city centre. “Buckminster Fuller's work with geodesic domes provided both stylistic and structural precedents.”