LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar 20112  LBNE LAr detector overview  Prototyping plan  1 kton prototype.

Slides:



Advertisements
Similar presentations
J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
Advertisements

TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Comments about Extrapolation to LBN(E) Barry Norris September 25, 2014 Barry Norris, Cryogenic Meeting at CERN September 2014.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.
E-field calculations for the TPC/HBD N. Smirnov Upgrade Working Group Meeting 05/13/03, BNL.
K.T. McDonald June 18, 2009 DUSEL FNAL 1 Strategies for Liquid Argon Detectors at DUSEL Kirk T. McDonald Princeton University (June 18, 2009)
Designs of Large Liquid Argon TPCs — from MicroBooNE to LBNE LAr40 Bo Yu Brookhaven National Laboratory On behalf of MicroBooNE and the LBNE LAr Working.
LAr20 Goals & Plans Integrated R&D Plan Development Bruce Baller November 23, 2009.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
Status of LBNE LAr and LAr1 at FNAL Bruce Baller - Fermilab.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Detector R & D in the 35 ton Membrane Cryostat 9/11/2015HV Feed for BNL Meeting1 Hans Jostlein This is a draft and a list of possible studies. The main.
CERN LBNE Test Experiment. Plan view of Bat
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
LAr1-ND Cryogenics Concept David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Greetings to Veljko from Fermilab December 9, 2010.
Liquid Argon is a bright Scintillator (40,000 photons/MeV) and allows free electrons to drift meters under electric fields of 0.5 kV/cm. Liquid Argon presents.
Detector R&D Opportunities at Fermilab: a Must or a May Do? Adam Para.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
Liquid Argon Time Projection Chamber: Purity and Purity Monitoring DAVID GERSTLE – LArTPC – YALE UNIVERSITY/FNAL 31 May 2006 – FNAL Users’ Meeting Materials.
Work on Liquid Argon at Fermilab Stephen Pordes Fermilab Institutional Review June 6-9, 2011.
Seattle / David Finley, Fermilab / September 21, 2006 Slide 1 Liquid Argon TPC Activities at Fermilab etc Big Tank Paradigms Technical Progress.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
TPC Design Concept: From MicroBooNE to LAr20
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
Discussion: développement du système de lecture des photomultiplicateurs pour le prototype de détecteur Argon liquide de LBNO 21/11/2013 Réunion: APC,
1 Liquid Argon Dark Matter: Synergies with R&D for Neutrino Detectors: Chemically clean Argon for drifting electrons and light output (Oxygen and H20 relevant.
Questions and challenges of an underground multi-kton LAr TPC detector Outline Introductory Remarks Detector Optimization Vessel construction and integration.
Grounding Guidelines Developed for LBNE
David Finley / LongBaseLine Study / June 27, Fermilab Slide 1 Ultimate Step and Penultimate Step LArTPC Costing Methodology Ongoing LArTPC R&D Summary.
David Finley, Fermilab / October 3, 2005 on LArTPC Slide 1 LArTPC: Large Liquid Argon TPC for the NuMI Off-axis Beam First Point: Try to recognize intellectually,
Work on Liquid Argon at Fermilab Stephen Pordes Fermilab Institutional Review June 6-9, 2011.
DARK MATTER SEARCH Carter Hall, University of Maryland.
Concept Design for LBNF Far detector (LAr single phase)
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Ions in LAPD Can we Observe Them in Long Bo ? 3/6/2016 Ions in LAPD Sarah Lockwitz and Hans Jostlein, Fermilab 1 Sarah Lockwitz and Hans Jostlein Fermilab.
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
David Finley / PPD Engineering Meeting / June 24, Fermilab Slide 1 R&D Toward Large Liquid Argon Time Projection Chambers “Large” means up to 100.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Project 29 September 2015.
35ton and LAPD cryostats and future DUNE detector development.
News from LBNF C. J. Mossey, LBNF Project Director DUNE Collaboration Meeting - South Dakota School of Mines and Technology 19 May 2016.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
MicroBooNE Experiment Cat James – MicroBooNE Project Manager DOE Managers Site Visit August 23, 2010.
Value Engineering proposal: Putting APA’s on outside or put short drift cell on outside April 21, 2014, Post meeting rev. April 25, 2014 Russ Rucinski.
Cryogenic Test Stand Facilities at PAB: Stephen Pordes Neutrino R&D Workshop January 20 –
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
Stephen Pordes – DOE Review of Laboratory Detector R&D, July 24, Liquid Argon is a bright Scintillator (40,000 photons/MeV) and allows free electrons.
LBNE Reconfiguration Engineering/Cost Working Group Report Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group Fermilab.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
Daniel H. Gutiérrez Velázquez Fermi National Accelerator Laboratory PPD – Neutrino MicroBooNE.
MicroBooNE Experiment Gina Rameika Fermilab DOE Annual Science & Review July 12-14, 2010.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Overview of the Long-Baseline Neutrino Facility Cryogenic System
EURONu Collaboration Board,
First tests on the roll-formed field cage.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Warm structure requirements :
Presentation transcript:

LAr1 Plans at FNAL Bruce Baller - Fermilab

Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype

LBNE, LArTPC, 300L – 800L Plan Ross Shaft Ramp From 300L to 800L Existing 800 Level Yates Shaft LArTPC Cavern 1 Existing 300 Level Kirk Portal LArTPC Cavern 2 Utility Shafts To Surface

LAGUNA Meeting - Mar Existing 800 Level Existing 300 Level Ross Shaft Access Ramp Access Portal Utility Shaft Access Portal, Cryogenics Building Cavern SITE PLAN

LAGUNA Meeting - Mar CR Veto Membrane Cryostat Mounting Rails Anode Plane Assembly (168) Cathode Plane Assembly (224) Field Cage 2.5m 7m

Cold Electronics LAGUNA Meeting - Mar Analog ASIC Tested

Reference Design - Key Parameters LAGUNA Meeting - Mar  One detector module  2 high x 3 wide x 26 long = 168 Anode Plane Assemblies (APA)  APA  3840 instrumented 3mm wire spacing (5mm?)  Four wire planes: Grid, Induction 1, Induction 2, Collection  2.5m drift (3.5m?)  16.7 kton fiducial mass, 20 kton active mass, 25 kton total mass  Heat load = 31 kW insulation + 12 kW electronics + 6(x4) kW LAr pump ~ 50 kW  0.5 MW power consumption (cooling!)  Light detection system? - A “desirement”  Two detector modules in one cavern – 34 kton  Cavern 184m x 24m x 25m

Issues & Prototyping Plan LAGUNA Meeting - Mar  Achieving argon purity without vacuum pumping  Liquid Argon Purity Demonstrator (LAPD)  Achieving argon purity in a membrane cryostat  3m x 3m wall panel  Leak testing  LAPD  35 ton prototype (purity monitors)  Engineering and integration prototype  3 – 4 full scale APAs, 6 – 8 CPAs, field cage, full readout chain  “1 kton prototype” = SBL LAr1 (Project Manager opinion)  Electronics reliability  20 year lifetime design rules for150  m CMOS process, stress test

3m x 3m Membrane Cryostat Wall Panel LAGUNA Meeting - Mar  Compare He sniffing and ammonia calorimetric leak checking  Max  p across membrane if we need to vac pump  Under construction at Fermilab  GTT visit next week Panel built at Samsung (Korea)

LAPD LAGUNA Meeting - Mar  10’ dia x 10’ high SS tank  2x20cm, 2x50cm purity monitors, RTD’s  Test in summer 2011

35 Ton Prototype LAGUNA Meeting - Mar  3m x 3m x 3m membrane cryostat  Use LAPD cryogenics system and instrumentation  Side benefit: prototype cryostat procurement  Engineering – Arup  Procurement & Construction – Fermilab or construction management firm

“1 kton Prototype” Example LAGUNA Meeting - Mar m 16m  1.2 kton LAr total  730 ton active  3.8m drift  6 kW cooling req’d  DZero Ass’y Hall pit  Use DZero calorimeter cryo system, ODH system Attractive site

LAGUNA Meeting - Mar DAB Pit 14m x 21m floor 18m depth

Prototype or Physics Experiment? My Understanding LAGUNA Meeting - Mar  “Physics experiment rules”  Fermilab: Experiment proposal approved by the director after consideration by the Physics Advisory Committee  Time…  DOE: Detector constructed using capital equipment funds if the cost exceeds $5M  project management structure (CD-0, etc)  Time & money…  “Prototype rules”  DOE: Constructed using R&D funds  Under the aegis of the parent project  A Utopian vision  Fermilab constructs a LAr TPC test facility that just happens to be located in a neutrino beam

LAGUNA Meeting - Mar LAr WG Mtg - Dec TPB Light detector – MPPC? Acrylic plate 460 nm  128 nm  Doc 3303, “Demonstration of a Lightguide Detector for Liquid Argon TPC’s”, arXiv Key result: Observe 7 – 8 pe from 5.3 MeV  in LAr using a cryogenic PMT. (Expected 10 pe). 50 cm < attenuation length < 200 cm Backup Slide – Light Collection

Backup Slide – Veto Drifts LAGUNA Meeting - Mar