Presentation to Select Committee on Economic Development

Slides:



Advertisements
Similar presentations
OVERVIEW ON THE MUNICIPAL GUIDELINE,BENCHMARKS
Advertisements

Overview of the South African Renewable Energy Independent Power Producer Programme (IPP Program) Bruce Linke Finance and Projects 30 April 2012.
Click to edit Master title style Climate Change and the Carbon Market October 2010 Ciska Terblanche TAPPSA 2010 Conference Durban, South Africa TAPPSA.
Click to edit Master title style 0 Eskom’s MYPD2 Tariff Application 03 December 2009 Brian Dames – Chief Officer (Generation Business)
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
IRP – Commitments required now Our objectives – IRP alignment (water, security, emissions, cost etc.) – Legal diligence – Financial sustainability (buyer.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Response to the Eskom Revenue Application for the Multi Year Price Determination for the period 2010/11 to 2012/13 (MYPD 2) Presentation by Business Unity.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
ESKOM PRESENTATION TO THE PORTFOLIO COMMITTEE DME PRESENTATION TO THE PORTFOLIO COMMITTEE DME 9 May 2001.
Rpsgroup.com/ireland Climatlantic Energy & Climate Forum March 13th Dublin, Ireland Renewables & Energy Policy 13 th March 2014
The German Electricity Market in the European context Bocconi University Karsten Neuhoff German Institute for Economic Research / Technical University.
1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy.
Energy situation & Energy policies in South Africa Presented by: Thembani Bukula.
Renewable Energy. 2 Climate Change 90% of primary energy supply from fossil energy resources coal 75% of fossil energy supply. SA one of the highest CO2/capita.
Electricity Pricing: Presented by: AT Audat (Acting CD: Electricity) 06 August
1 RENEWABLE ENERGY MARKET TRANSFORMATION PROJECT.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
CITY OF CAPE TOWN’S SUBMISSION ON ESKOM’S MULTI-YEAR PRICE DETERMINATION – 2010/11 – 2012/13 (MYPD 2) City of Cape Town represented by : Alderman Ian Neilson.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
ENERGY INTENSIVE USERS GROUP Ian Langridge Chairman January 2010 Eskom’s Revenue Application for Multi Year Price Determination MYPD (2)
MYPD2 SACCI VIEWS AND RECOMMENDATIONS TO NERSA 21 January 2010 Peggy Drodskie Executive Advisor to the CEO.
Towards an Affordable, Stable Electricity Supply MISSION CRITICAL FOR SOUTH AFRICA Public Presentation To NERSA by Nick Holland Chief Executive Officer.
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Submission on the cogeneration of electricity 25 July 2013.
Presentation on the Green Energy Act for South Simcoe Municipalities Susan Lloyd Swail M.E.S. Planning Candidate Intern at Nottawasaga Futures Green Economy.
Overview of NER and its Future Business Direction Presentation to Standing Committee on Minerals and Energy Parliament 09 May 2001.
The strategy for improved electricity distribution maintenance 9 June 2008.
The Institute for Municipal Finance Excellence NERSA HEARINGS 20 JANUARY 2010 Eskom’s Revised Revenue Application MYPD 2010/11 – 2012/13.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
The Multi- Year Price Determination MYPD Presented by: Thembani Bukula Regulator Member – Electricity Regulation.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Annual Report, Financial Performance and Eskom Price Review 2005 PRESENTATION BY THE NATIONAL ELECTRICITY REGULATOR (NER) TO THE PARLIAMENTARY PORTFOLIO.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
3/26/12 Electricity Supply Interruption Mitigation Strategy. ( ) 11.
1 PRESENTATION TO PPC ON ENERGY 24 MAY 2013 MUNICIPAL TARIFF DETERMINATION PROCESS.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
Global Power Company of the Year 2001 Proudly South African Minerals and Energy Portfolio Committee 19 March 2003.
Establishing the Independent System & Market Operator. (ISMO) 30 January 2013.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
1 Status on ISMO, IRP2010 and New Generation Regulations.
IPP Bidders Conferance LICENSING OF IPP PREFERED BIDDERS DoE IPP BIDDERS CONFERENCE – Presented by TAMAI HORE.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
ROLE OF NERSA IN DIVERSIFICATION OF ENERGY IN SOUTH AFRICA By Andile Gxasheka Southern Africa Biofuels Association National Stakeholders Forum
Renewable Energy Initiatives Ms Nomawethu Qase. Presentation Outline Overview of RE Focus Areas Enabling Policy Framework Current Renewable Energy Implementation.
Renewable energy support schemes in the Republic of Moldova
SA GHG Emission Reduction System: Progress and development of 2nd Phase of the DEROs and Carbon Budgets PCEA 28 OCTOBER 2016.
Integrated Resource Plan 1
The Ontario Energy Board and Demand-Side Management
NERSA presentation at the PPC meeting held on 24 May 2006
Eskom presentation – Select Committee on Communications and Public Enterprises 14 June 2017 Briefing by Eskom on its tariff increase for and.
ELECTRICITY PRICING POLICY AND IMPACT ON THE MULTI YEAR PRICE DETERMINATION BY NERSA Matthews Bantsijang 7/6/2018.
PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ON TRADE AND INDUSTRY 2 NOVEMBER 2012 IPAP 2012/10.
DEPARTMENT OF MINERAL RESOURCES
Raw Water Use Charges for 2016/17 Financial Year
Electricity Price Increase 2008/9
Progress on the Renewable Energy IPP Procurement Programme
Creating a market for sustainable energy growth Inġ
OUTLINE RE Programme Objectives Integrated Resource Plan
Minerals & Energy Parliamentary Portfolio Committee
OUTLINE Legislative context, NERSA vision and NERSA mission
Presentation transcript:

Presentation to Select Committee on Economic Development NERSA CEO: Smunda Mokoena 24 August 2010

AGENDA Mandate of the Energy Regulator Current structure of the ESI Objects of the Electricity Regulation Act Extract from the RE white paper of 2003 REFITs I and II Facilitators Conclusion

MANDATE NERSA was established in terms of the National Energy Regulator Act, 2004 (Act No. 40 of 2004) Mandated by the Electricity Regulation Act, 2006(Act No. 4 of 2006) (“the Act”) to regulate the Electricity Supply industry in South Africa. s4 (a) (iv) of the Act states “The Regulator must issue rules designed to implement the national government’s electricity policy framework, the integrated resource plan and this Act.” NERSA was established in 2005 and is a successor of the National Electricity Regulator that regulated only the electricity supply industry. The Act extended NERSA’s regulatory mandate to Piped Gas and Petroleum Pipelines. However, today’s topic is limited to the electricity supply industry. NERSA is empowered by the ERA to make rules and thus REFITs were formulated under this mandate.

Current structure of the ESI Eskom Transmission Eskom Distribution Customers b Customers a Customers n Eskom Generation Large Power Users D1 D3 D2 Dn Imports / Exports IPPs Municipal Generators Local Authority Distributors The ESI is dominated by the vertically integrated utility – Eskom. They are licensed to generate, transmit, distribute, import and export electricity. Eskom supplies power to local authority distributors, large power users, industrial, agricultural and domestic customers. They are the only ones who hold a transmission licence in SA. They generate at least 90% of electricity in SA. Some municipalities have generation licences eg., Tshwane, Cape Town and Johannesburg. There are a few IPPs who supply power to Eskom, munics, and large power users eg. Kelvin for City Power, Sappi for Eskom.

Objects of the Act These are listed in s2 of the Act and the relevant ones for this presentation are to: (c) facilitate investment in the Electricity Supply Industry (e) promote the use of diverse energy sources and energy efficiency These two objects are relevant because the introduction of REFITs with premium in prices encourages investors to develop REFIT projects. REFITs also encourage the introduction of different technologies in the generation mix eg. Wind and solar over and above the conventional coal-based thermal generation.

Renewable Energy Policy The RENEWABLE ENERGY WHITE PAPER of 2003 states: In order to meet the long-term goal of a sustainable renewable energy industry, Government has set the following 10-year target for renewable energy:   10 000 GWh (0.8 Mtoe) renewable energy contribution to final energy consumption by 2013, to be produced mainly from biomass, wind, solar and small-scale hydro. The renewable energy is to be utilised for power generation and non-electric technologies such as solar water heating and bio-fuels. This is approximately 4% (1667 MW) of the estimated electricity demand (41539 MW) by 2013. The RE white paper of 2003 set a target of 10 000 GWh of energy to be derived from renewable energies by 2013. This would represent about 4% of an estimated 41539 MW of electricity demand by 2013. 6

Renewable Feed-In Tariffs (REFITs) Based on the above requirements NERSA introduced a REFIT framework in two phases. A REFIT is a pre-approved tariff for a specific Renewable Energy generation technology eg., wind By nature REFITs include a premium above tariffs for conventional generation mainly to attract investors and developers Requirements are objects of the Act and the RE white paper target

REFIT FINANCIAL ASSUMPTIONS Financial parameter Unit IPP REFIT Debt % 70 Equity 30 Nominal cost of debt 14.9 Inflation 8 Real cost of debt after tax 6.39 Tax rate 29 Real return on Equity ROE after tax 17 Weighted Average Cost of Capital (WACC) 12 These assumptions formed the basis for the determination of REFITs. 8

REFIT PHASE I Renewable Energy Feed – in Tariffs approved March 2009 In March 2009 NERSA published phase 1 of the REFITs with 4 qualifying RE technologies. The technologies are largely aligned with those listed in the RE white paper of 2003. They were the Concentrated Solar Power Trough with 6 hr storage at R2.10/unit; Wind at R1.25/unit; Small hydro (less or equal to 10MW) at 94c/unit and Landfill gas at 90c/unit. Eskom’s average price is currently 41c/unit – which is less that 50% of the lowest REFIT, this is the indication of the extent of the premium at which REFITs will be introduced. The premium is aimed at attracting private investors and developers into the power generation sector. This is largely aligned with the technologies mentioned in the REWP of 2003. 9

REFIT PHASE II Renewable Energy Feed – in Tariffs approved October 2009 Phase II introduced 5 more RE technologies namely Concentrated Solar Power w/o storage at R3.14/unit; Large scale grid connected Photo Voltaics at R3.94/unit; Biomass solid at R1.18/unit; Biogas at 96c/unit and Concentrated solar Power Tower with a 6hr storage at R2.31/unit. 10

Important features of the REFIT The REFITs will be escalated by CPI annually. A full tariff review will take place every year for the first five year period of implementation and every three years thereafter. The term of the Power Purchase Agreement (PPA) is twenty (20) years. The carbon revenue from the Clean Development Mechanism (CDM) was not included in the REFIT. Independent Power Producers (IPPs) may apply for CDM revenues separately. CDM revenues were not included because of their fluctuating nature. 11

Way Forward The NewGen regulations of 5 August 2009 require that NERSA issues rules on selection criteria for the REFIT programme. NERSA is currently finalising the rules and the standard REFIT PPA after a lengthy public consultation process Once the rules are finalised they will be forwarded to the System Operator or the Buyer. The Buyer will then kick start the process by issuing a Request for Qualification (RfQ) and a Request for Proposals (RfP). However, the National Treasury and the DoE have indicated that there are developments on the policy front that may require changes to the criteria that NERSA is finalising.

FACILITATORS These are initiatives that have been introduced by the DoE and NERSA to ensure that IPPs and RE IPPs in particular are assured that they may enter the power generation market and be assured of reasonable returns on their investments.

Rules for Power Purchase Cost Recovery Regulation 10 of the NewGen regulations requires that NERSA passes rules for the purpose of cost recovery by the system operator and the buyer. In response to this NERSA gazetted rules on Power Purchase Cost Recovery (CRM) after a public consultation process. The CRM basically addresses: Check of whether the proposed IPP will be affordable The allocation of risk between the buyer and the IPP Process to be followed by the buyer in seeking approval of pass through costs A list of recoverable/pass through costs The absence of a cost recovery mechanism was mentioned as one of the regulatory risks by investors. In response to this concern NERSA formulated the CRM rules and gazetted them in November 2009. The investors are most interested in the last item ie. Which costs would they be allowed to pass through to Eskom and thus the customers.

Integrated Resource Plan 1 (IRP 1) gazetted on 29 January 2010 On 29 January 2010 the DoE gazetted the Integrated Resource Plan 1 (IRP1) From the plan – under the ‘REFIT Wind’ and ‘REFIT other’ columns at least 200 MW of wind have been allowed and 625 MW of other RE technologies. Sere (100 MW) is the wind farm that was supposed to be built by Eskom.

Multi-Year Price Determination 2 (MYPD 2) SUMMARY OF ALLOWED REVENUE 2010/11 2011/12 2012/13  R’m R’m  Eskom’s own primary energy cost 36 464 40 486 45 351 IPP and Co-generation 2 304 4 299 5 819 Operating Expenditure 32 611 34 727 36 847 Depreciation 9 356 12 812 17 880 Return on assets 3 039 15 936 33 163 Demand Side Management 1 406 1 688 2 351   85 180 109 948 141 411 On 24 February 2010 the ER announced its decision on Eskom’s allowed revenues for 2010-2013 – MYPD2. The 2nd line shows what was allowed for purchases from IPPs namely R2,3bn in the 1st year, R4.2bn n the 2nd year and R5.8bn in the 3rd year – a total of R12.4bn in all. This should allay any concerns from prospective investors and developers that Eskom may not be in a position to pay for the energy purchases.

In Conclusion The Energy Regulator believes that: all perceived regulatory risks have been mitigated. once the rules on selection criteria for the REFIT Programme have been finalised the Buyer will be in a position to invite interested parties to bid before the end of 2010.

THANK YOU www.nersa.org.za