100 NR-2 Evaluation Status TM Poston and JL Downs River Corridor End State and Final Closure Project Update And SAP Refinement Workshop June 1, 2006.

Slides:



Advertisements
Similar presentations
Framework for the Ecological Assessment of Impacted Sediments at Mining Sites in Region 7 By Jason Gunter (R7 Life Scientist) and.
Advertisements

In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.
Fish Bioaccumulation Studies Associated with the Kingston Fly Ash Release Marshall Adams - Oak Ridge National Lab Tyler Baker - TVA Allison Fortner - Arcadis.
PROTECTFP Screening tier comparisons ERICA, RESRAD-BIOTA & EA R&D128 Follow-up actions from Vienna workshop.
NASSCO and Southwest Marine Sediment Investigation Preliminary Results Thomas Ginn, Ph.D. Dreas Nielsen June 18, 2002.
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
River Corridor Closure Project Safety People Results U.S. Department of Energy Richland Operations Office 100 Area and 300 Area Component of RCBRA Steve.
Air Force Plant 4 Superfund Site Evaluation of SVE Combined with ERH for the Remediation of TCE Source Material Jeffrey Ragucci SWS 6262 – Soil Contamination.
Division of Water Quality
Defending the Rights of Metals: How to Distinguish Naturally High Groundwater Concentrations from Site-Related Contamination Karen Thorbjornsen and Jonathan.
Conservation Value of Feathers 1.As a hammer (1886 George Bird Grinnell and Women against plume hunters) 2.Molting demands conservation of stopover sites.
Criteria for water quality assessment between countries: how to proceed in the next few years ? F. László Water Resources Research Centre Budapest, Hungary.
Water Supply & Management Obj: Discuss the nature, importance and sources of water.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
Characterizing Storm Water Runoff from Natural Gas Well Sites in North-Central Texas Paul F. Hudak and David J. Wachal Department of Geography University.
River Corridor Closure Project Safety People Results 1 Data Evaluation Summary - Columbia River Component River Corridor Closure Project Safety People.
US EPA Region IV Surface Coal Mining Field Activities Adventures in Mountain Top Mining / Valley Fill Chris Decker.
U.S. Department of the Interior U.S. Geological Survey Evaluations of Heavy Metal Listings on the State of Massachusetts Integrated List of Waters Assabet.
Overview of US EPA’s Vapor Intrusion Guidance VAP CP Summer Coffee July 14 th, 2015 Carrie Rasik Ohio EPA CO- Risk Assessor
Screening Level Ecological and Human Health Risk Assessment Poplar Point, Washington, DC.
Oxon Run and C&O Canal TMDLs
 Ecological Markers Watercress growth patterns were noticed during United States Forest Service (USFS) water rights surveys, Dixie National Forest 2012.
Overview of the Proposed Draft B River Corridor Baseline Risk Assessment Report Public Workshop – January 10 & 11, 2008.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Aquatic Life Selenium Standards Cottonwood Creek Drainage Cherry Creek Segment 4b Regulation 38 June 9, 2015.
GROUND WATER MONITORING TO EVALUATE EFFECTS OF LAND USE ON WATER QUALITY Mike Trojan Erin Eid Jennifer Maloney Jim Stockinger Minnesota Pollution Control.
PROTECTFP PROTECT recommendations – application in practice.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
1 Inter-Areas Investigation to Support the River Corridor Baseline Risk Assessment River Corridor Closure Contractor River Corridor Inter-Areas Investigation.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Former DuPont Barksdale Works Project Update December 14, 2006 Great Lakes Visitors Center DuPont CRG.
- Aquatics - Presented by: Rick Pattenden Mainstream Aquatics Ltd.
Sheen Characterization 2009 Data and Observations July 2010 Progress Meeting McCormick & Baxter Superfund Site Portland, Oregon.
Figure 1. Location of the Palo Alto sampling station in South San Francisco Bay.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Developing a Cumulative Effects Monitoring Program for the Saint John Harbour – Contaminants Karen Kidd and Angella Mercer Canadian Rivers Institute, UNB.
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan
Today’s Topics Hartford Iron site assessment Cleanup to date Cleanup steps to come What can you do.
Rapid Risk Assessment Preparedness, Response, Recovery, and Mitigation Workshop U.S. Nuclear Regulatory Commission Rockville, Maryland Pacific Northwest.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
Deanna Streifel Environmental Engineering Officer Arnprior Waste Disposal Site Annual Monitoring Results.
Debra Harrington and Haizhi Chen FDEP Groundwater Protection June, 2005 HYDROPORT RETRIEVAL APPLICATION FOR ASSESSMENTS.
Preliminary Scoping Effort. Presentation Objectives Identify need for additional sources of future funding Provide background on how elements were identified.
Comparison of Pre-Mining and Post-mining Groundwater Quality at Texas In Situ Uranium Mining Sites David Murry, P.G. Underground Injection Control Permits.
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
I RIS E NVIRONMENTAL Independent Review of Documents Pertaining to the Lehigh Southwest Cement Permanente Facility Rob Balas & John McLaughlin February.
Jim Stockinger, Erin Eid, Jennifer Maloney and Mike Trojan
Eric Ferguson King County Department of Natural Resources and Parks November 4, 2015 Existing Conditions Assessment.
Connie Brower NC DENR Division of Water Resources.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
Testing Biota Dose Assessment Committee Methodology with 1997 Hanford Surveillance Data by E. Antonio (PNNL) and J. P. Lair (TRP) August 1999.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Lynas Advanced Materials Plant
Characterization of Dissolved Solids in the Ohio River
Anniston PCB Site Review of Risk Assessments for OU-1/OU-2
Water quality characterization of the Pebble prospect area in Southwestern Alaska Comparison of PLP and independent science team scope, methods, and results.
East Hennepin Avenue Site
Welcome.
Water Quality in the Animas Watershed 1/24/18
Public Meeting February 19, 2009
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Monitoring keeps track of something for a specific purpose.
Cain, DJ, Carter, JL, Buchwalter, DB, and Luoma, SN
6th Framework Programme
Pearce Creek DMCF Baseline Exterior Monitoring Spring 2017 Results
Mary River Project Phase 2 Proposal Freshwater Environment
Arsenic Leaching out from CCA Contaminated Mulch
Michael Smith and Greg Zychowski TCEQ Remediation Division
Presentation transcript:

100 NR-2 Evaluation Status TM Poston and JL Downs River Corridor End State and Final Closure Project Update And SAP Refinement Workshop June 1, 2006

2 Objectives of Evaluation Evaluation of ecological receptor impacts at 100-N in the riparian and near-shore aquatic habitats Effectiveness of pump and treat; remedial action decisions Results to feed into River Corridor Baseline Risk Assessment (RCBRA)

3 100-NR-2 Study Areas Suspected diesel area = SDA Strontium plume area = SPA Elevated metals area = EMA SDA SPA EMA

4 Diesel Plume Spill in the 1960s Trenched to collect diesel – burned Residual plume still present Diesel residues observed at shoreline well sites Diesel odors detected during hyporheic shoreline sampling Low dissolved oxygen in aquifer tube samples Iron oxide deposits along shore Elevated manganese and iron in interstitial water

5 RadionuclidesRadionuclides Strontium-90 is the driver RESRAD biota runs Surface soil and water concentrations pass screens Clam shell dose rates below screens Hypothetical Riverbank Spring Scenario Mouse lives in riprap, drinks 100% spring water Undiluted spring flows year round; 2410 pCi/L strontium- 90

6 Strontium-90 in Clam Shells

7 Polychlorinated Biphenyls Screened on 21 congeners Several congeners were detected Comparisons to benchmarks indicated measured values below ecological screening criteria levels and upstream reference levels

8 MetalsMetals Elevated lead in mouse liver at SPA Iron and manganese elevated in SDA sub-surface water Barium (?), cadmium, nickel and zinc > some ecological benchmarks Uranium, arsenic, chromium elevated in riparian soils, at or < benchmarks levels ECEM modeling of metals (median concentration). Indicated low (acceptable) risk

9 Weight of Evidence “Normal” distribution of mollusks “Normal” age distribution of “Corbicula” “Normal” distribution in aquatic invertebrates Highly reproductive mouse habitat No external abnormalities noted in biota Asiatic clam histology – variable responses, no correlation in ova condition with Sr-90, inconclusive with digestive system

10 Continuing Activities Address/incorporate review comments on 100 NR- 2 report Transfer of 100 NR-2 data to RCBRA – inclusion into 100/300 Area RA Apatite injection is moving forward Characterize diesel plume area Continued monitoring of Sr-90