Action Items and Recommendations WGSIP-12. Color Coding Items In Black Have Been Completed Items in Red Have No Progress to Date Items In Orange Have.

Slides:



Advertisements
Similar presentations
World Climate Research Programme Moving Towards Future WCRP Progress and Plans Ghassem R. Asrar & Antonio J. Busalacchi.
Advertisements

WCRP Perspective Joint ICSC1/JSC6 17 July 2013, Geneva Michel Rixen, WCRP JPS.
WCRP polar climate predictability initiative Vladimir Ryabinin
PPAI Breakout Session Report July 21, PPAI Breakout Session Report Introductions A review of PPAI activities In 2011 Discussion on the Large Scale.
Climate System Observations and Prediction Experiment (COPE) Task Force for Seasonal Prediction.
(a selection of) Important data and modeling activities sponsored by WCRP in Major findings, recommendations and actions.
World Climate Research Programme: Plans and Priorities THORPEX ICSC September 2011 Geneva, Switzerland Ghassem R Asrar.
WCRP Community-wide Consultation on Model Evaluation and Improvement Sandrine Bony, Jerry Meehl, Anna Pirani (WGCM) Christian Jakob, Martin Miller (WGNE)
CLIVAR SSG May 2011 IOC/UNESCO, Paris France Jim Hurrell and Martin Visbeck Co-Chairs, International CLIVAR SSG Introduction to CLIVAR SSG-18 Strategy.
The Decadal Climate Prediction Project (DCPP) G.J. Boer CANSISE WEST Victoria, May 9, 2014.
The US CLIVAR SSC is undertaking an examination of progress made and priority science questions and research needs remaining to be addressed to: – improve.
26-28 July 2006US CLIVAR Summit -- Breckenridge, CO Prediction, Predictability and Applications Interface Panel (PPAI) 2005/06 Activity Report Tom Delworth.
International CLIVAR Working Group for Seasonal-to- Interannual Prediction (WGSIP) Ben Kirtman (Co-Chair WGSIP) George Mason University Center for Ocean-Land-Atmosphere.
Modelling Theme White Paper G. Flato, G. Meehl and C. Jakob.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Decadal Climate Variability and Predictability Discussion of CLIVAR Research Focus Pan-CLIVAR Meeting, July 16-18, 2014.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
CIMA CHFP Data Server.
WCRP Update / WCC-3 Outcomes Ghassem R. Asrar Director, WCRP Vladimir Ryabinin SSO, JPS for WCRP &
World Climate Research Programme Climate Information for Decision Making Ghassem R. Asrar Director, WCRP.
Decadal prediction  Scientific interest  Meetings and Workshops  Organizational aspects  WGSIP role and activities.
Report on the 25 th WGNE meeting Hosted by DWD in Offenbach, Germany 2- 9 November 2009 Presented by Pierre Gauthier Department of Earth and Atmospheric.
Activities and Imperatives Anna Pirani ICPO Visiting Scientist, Princeton University.
Climate and Cryosphere (CliC): Legacy for 2013 and Beyond Jeff Key NOAA/NESDIS Chair, CliC Observation and Products Panel (Agenda item )
Report to WGSIP on VACS activities. Tanzania Workshop The Tanzania Meteorological Agency (TMA) hosted the Variability of the African Climate System (VACS)
The Future CLIVAR & Collaboration with PICES Toshio Suga, Tohoku University/JAMSTEC, Japan With input from Martin Visbeck, Co-Chair, CLIVAR SSG and Wenju.
© Crown copyright Met Office WCRP Working Group on Seasonal to Interannual Prediction Adam Scaife (Met Office) & Francisco Doblas-Reyes (IC3) (WGSIP co-chairs)
WA-06-05:  Title: Initiate the creation of a coordination mechanism within GEO for global in-situ water observations, including ocean observations, and.
Change of program Implementation Plan. T. Satomura Current status of and contribution by NICAM. T. Matsuno & T. Nasuno (~ 20 min) Comments. J. Shukla Discussion.
CLIVAR (Climate Variability and Predictability) CLIVAR is an interdisciplinary research effort within the World Climate Research Programme (WCRP) focusing.
World Climate Research Programme Joint Scientific Committee – 31 Antalya, Turkey.
WWRP Commission of Atmospheric Sciences - new projects Polar Prediction project – “The Commission concurred with the Executive Council Panel of Experts.
WWRP An International Polar Prediction Project Chair: Gilbert Brunet Rapporteur: Barry Goodison 1.
1 Arun Kumar Climate Prediction Center 20 July 2011 US CLIVAR Decadal Predictability Working Group (DPWG) Report US CLIVAR Summit 2011 Co-Chairs: Amy Solomon.
Year of Tropical Convection (YOTC) (and MJO Task Force) A Contribution to Seamless Weather-Climate Prediction Mitch Moncrieff, NCAR Duane Waliser, JPL/Caltech.
17 Sep 2012 Martin Visbeck and Jim Hurrell Co-Chairs, CLIVAR SSG GEWEX SSG October 2012 CLIVAR (Climate Variability and Predictability) Asian-Australian.
© Crown copyright Met Office Strategy for Seasonal Prediction Development: UKMO and WGSIP activities Adam Scaife Head Monthly to Decadal Prediction Met.
WGSIP meetingBuenos Aires, July 2010 INSTITUT CATALÀ DE CIÈNCIES DEL CLIMA ENSEMBLES forecasts: ocean and atmosphere THREDDS (OPeNDAP) public server.
David M. Legler U.S. CLIVAR Office U.S. Climate Variability and Predictability Program usclivar.org CLIVAR Welcome Climate Diagnostics.
Science plan S2S sub-project on verification. Objectives Recommend verification metrics and datasets for assessing forecast quality of S2S forecasts Provide.
© Crown copyright Met Office Stratospheric Extension to the CHFP “S-CHFP” and links to WCRP-SPARC Adam Scaife WGSIP July 2010.
PPAI Decadal Prediction/Predictability/Variability –Reviewed the WGCM/WGSIP Decadal Prediction Experiment –Reviewed/Revised Decadal WG Prospectus Reviewed.
26-28 July 2006US CLIVAR Summit -- Breckenridge, CO PPAI PPAI Concluding Report Proposed focus: DROUGHT ENSOExtreme Events Decadal Variability MJO Nowcasting.
Report of WGCM (Met Office, Exeter, 3-5 Oct 2005) and WGCM/WMP (Met Office, Exeter, 5 Oct 2005 (pm)) meetings Howard Cattle.
WCRP Data Advisory Council May 6-7, 2014 Overview.
WWRP 1 THORPEX-WCRP Collaborations and other climate relevant activities of the WWRP WCRP/JSC31 WMO/WWRP/THORPEX
Subseasonal to Seasonal Prediction Research: A WWRP/THOPEX and WCRP Initiative Gilbert Brunet WWRP/JSC Chair CAS MG meeting, November 2011 Madrid,
on Near Term Climate Prediction
Review of WGSIP16 actions
WORLD CLIMATE RESEARCH PROGRAMME
Cross-Cutting Topic DECADAL PREDICTION.
World Weather Research Programme SSC meeting October 2016
WCRP Working Group on Seasonal to Interannual Prediction
WORLD CLIMATE RESEARCH PROGRAMME
CLIVAR/WCRP Issues Imperatives WCRP Restructuring
IPET-OPSLS: Activities and Achievements (after April 2016 Beijing Meeting) Arun Kumar Chair, CBS/CCL IPET-OPSLS Climate Prediction Center, USA
CLIVAR International Climate of the 20th Century (C20C) Project
How should we define ECV and their requirements?
Task Team for Intercomparison of ReAnalysis
IPET-OPSLS/CCl-17 relevant issues before EC-70
WCRP update DCPP meeting, Barcelona, 12 May 2016 M. Rixen,
WGSIP16 Tuesday.
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team
Proposed WCRP Grand Challenge on Near Term Climate Prediction
WCRP Working Group on Seasonal to Interannual Prediction
What is our Vision for Decadal
Beyond
CLIVAR Report to WOAP4 Detlef Stammer.
Do we have a Decadal Prediction Vision?.
What is our Vision for Decadal
Presentation transcript:

Action Items and Recommendations WGSIP-12

Color Coding Items In Black Have Been Completed Items in Red Have No Progress to Date Items In Orange Have Substantial Progress But Have Not Been Completed

Reports from CLIVAR and WCRP 1.WGSIP to review the imperatives for seasonal prediction for the WCRP implementation plan and contribute to the discussion of the long-term vision of WCRP science and infrastructure requirements. DONE 2. WGSIP to contribute to the WCC3 agenda. DONE

CHFP 3. Issue recommendations for CHFP participants on how to upload new versions of data or replace/disable old versions. 4. Each CHFP contributing group should provide a contact person to the data servers for technical issues. 5. Determine whether there will be a common registration approach for accessing CHFP data to acquire information on the use and dissemination of the CHFP data. Need to give guidelines on the CHFP website on how to acknowledge the data origin. Circulate a draft data policy to WGSIP for endorsement. 6. Circulate proposal for course on the CHFP, seasonal prediction and applications that is being organized by CIMA in Buenos Aires in March 2010 for endorsement by WGSIP (C. Vera). 7. Confirm whether groups contributing CHFP data to the APCC server can send a wider list of variables including metadata than those outlined in the APCC proposal (W.-J. Lee). 8. Develop interactions with CLIVAR regional panels to develop CHFP diagnostic sub projects. 9.Develop a clearing-house of applications-relevant tools, scripts, etc. for evaluating CHFP datasets (A. Pirani, A. Morse). These Actions Need to Be Revised?

GEWEX interactions with WGSIP 10. Report to the CLIVAR and GEWEX SSGs our views on how to build and maintain appropriate links between WGSIP and GEWEX. Discuss with CLIVAR SSG the general issue of links with projects outside CLIVAR. DONE

SPARC interactions with WGSIP 11. Endorse a joint WGSIP-SPARC subproject of the CHFP using high-top, stratosphere resolving models (Scaife, Stockdale, Kirtman). 12. SPARC to make recommendations on what diagnostics are needed to analyze downward propagating signals from the stratosphere in low-top models participating in the CHFP (Scaife).

CliC interactions with WGSIP 13. Develop a proposal on how to move forward in a CHFP/CliC/GEWEX study of snow cover and soil moisture (J. Christensen, R. Koster). Do We Need a New Action Here?

Applications 14. Develop a list of diagnostics that production centres could run which would be useful for the impacts and applications community (A. Morse). 15. Develop stronger links between WGSIP and WCP, including making WCP aware of the availability of CHFP data (B. Kirtman, T. Stockdale). 16. Lobby the WCC-3 on rendering long- term observational datasets available.

Decadal Prediction 17. Confirm T. Stockdale and G. Boer as WGSIP members of the CMIP-WGCM-WGSIP group coordinating the CMIP5 near term experiments. 18. Circulate to WGSIP the list of data, in particular variables that will be useful for impacts studies, that will be stored from the near term experiments. (T. Stockdale, G. Boer). 19. Determine the interest within the WGSIP community in participating in the CMIP5 near term experiments and diagnostics analysis. 20. Interface between US CLIVAR WG on decadal prediction and the CMIP-WGCM-WGSIP group (A. Kumar, T. Stockdale, G. Boer).

C20C Project 21. Link to C20C dataset from the CHFP website. 22. Continue conference calls with C20C to see what the possibilities are for collaboration with CHFP (A. Scaife and B. Kirtman).

The Ocean Observing System 23. Initiate an discussion between WGSIP, IOP and AAMP on how to best demonstrate the benefit of the Indian Ocean Array, RAMA, on forecast skill (B. Kirtman, T. Stockdale, H. Hendon).

Standard hindcast verification 24. Recommend that the CAWCR multi- model evaluation be updated to include newly contributed models and then distribute the result to WGSIP (O. Alves).

Linkages to other CLIVAR panels 25. Circulate the US CLIVAR MJO WG and AAMP-led proposal for a WCRP-WWRP WG on the MJO, as an extension of the US CLIVAR WG activities, for endorsement by WGSIP (H. Hendon). 26. Endorse the SAWS multi-model product and its application in the SACD region by the SARCOF process. 27. WGSIP to foster PPAI interest with regards to the CHFP data set (B. Kirtman, A. Kumar).

Major Issues(WGSIP-13) Who to Attend WGNE: Japan October Who to Attend WGCM: Exeter October 4-6 Exeter ISI workshop? –TIGGE-CHFP Project Invigorating CHFP! –New List of Action Items Need to get data into CIMA!!! Identify 2 or 3 WGSIP lead Diagnostic Sub- projects (papers) CHFP Workshop? WGSIP Contribution to AR5 –Chapter 11: Seasonal Assessment of Near- Term Climate Change Prediction